United States data centers:2024 vs 2026 satellite buildout.

2024 to 2026 satellite roof-growth tracking across 290 United States data centers: 38 filling, 130 little change. Every row links to the facility's public record and original sources; the interactive 2024 vs 2026 curtain slider opens inside the workspace.

290tracked sites
38filling since 2024
130little change
2024 to 2026comparison window

Operators: 2024 vs 2026 buildout

  • Meta
    8 filling (33%) · 12 little change
    24 tracked
  • Google
    7 filling (30%) · 8 little change
    23 tracked
  • Vantage Data Centers
    4 filling (50%) · 2 little change
    8 tracked
  • Amazon
    2 filling (15%) · 8 little change
    13 tracked
  • QTS Data Centers
    2 filling (17%) · 4 little change
    12 tracked
  • SpaceXAI
    2 filling (40%) · 2 little change
    5 tracked
  • Microsoft
    1 filling (8%) · 8 little change
    13 tracked
  • Nebius
    1 filling (20%) · 1 little change
    5 tracked
  • Compass Datacenters
    1 filling (25%) · 0 little change
    4 tracked
  • CoreWeave
    1 filling (25%) · 1 little change
    4 tracked
  • DC BLOX
    1 filling (25%) · 1 little change
    4 tracked
  • Corscale
    1 filling (33%) · 2 little change
    3 tracked
  • Cologix
    1 filling (50%) · 0 little change
    2 tracked
  • Core Scientific
    1 filling (50%) · 0 little change
    2 tracked
  • Riot Platforms
    1 filling (50%) · 1 little change
    2 tracked
  • SB Energy
    1 filling (50%) · 0 little change
    2 tracked
  • CyrusOne
    0 filling (0%) · 7 little change
    8 tracked
  • Digital Realty
    0 filling (0%) · 3 little change
    7 tracked
  • PowerHouse Data Centers
    0 filling (0%) · 4 little change
    7 tracked
  • CloudHQ
    0 filling (0%) · 2 little change
    5 tracked
  • Crusoe Energy Systems
    0 filling (0%) · 3 little change
    5 tracked
  • DataBank
    0 filling (0%) · 2 little change
    5 tracked
  • STACK Infrastructure
    0 filling (0%) · 5 little change
    5 tracked
  • Applied Digital
    0 filling (0%) · 3 little change
    4 tracked
  • Cipher Digital
    0 filling (0%) · 2 little change
    4 tracked
  • EdgeCore
    0 filling (0%) · 2 little change
    4 tracked
  • Tract
    0 filling (0%) · 2 little change
    4 tracked
  • Aligned Data Centers
    0 filling (0%) · 2 little change
    3 tracked
  • Prime Data Centers
    0 filling (0%) · 1 little change
    3 tracked
  • Sabey Data Centers
    0 filling (0%) · 1 little change
    3 tracked
  • Stream Data Centers
    0 filling (0%) · 0 little change
    3 tracked
  • Bitdeer Technologies Group
    0 filling (0%) · 1 little change
    2 tracked
  • H5 Data Centers
    0 filling (0%) · 0 little change
    2 tracked
  • Hut 8
    0 filling (0%) · 1 little change
    2 tracked
  • IREN (Iris Energy)
    0 filling (0%) · 1 little change
    2 tracked
  • Novva Data Centers
    0 filling (0%) · 1 little change
    2 tracked
  • OpenAI
    0 filling (0%) · 1 little change
    2 tracked
  • TeraWulf
    0 filling (0%) · 2 little change
    2 tracked
#OperatorTrackedFillingLittle changePipeline fillingPipeline little changeFilings
1Meta248 (33%)128.0 GWnot reported6 filings
2Google237 (30%)82.3 GW1.4 GW6 filings
3Vantage Data Centers84 (50%)22.3 GW1.1 GW1 filing
4Amazon132 (15%)8not reported7.3 GW6 filings
5QTS Data Centers122 (17%)41.6 GWnot reported1 filing
6SpaceXAI52 (40%)2not reported2.0 GW6 filings
7Microsoft131 (8%)8not reported422 MW6 filings
8Nebius51 (20%)1not reportednot reported6 filings
9Compass Datacenters41 (25%)0320 MWnot reported1 filing
10CoreWeave41 (25%)1not reported250 MW6 filings
11DC BLOX41 (25%)1216 MW120 MW1 filing
12Corscale31 (33%)2not reported134 MW1 filing
13Cologix21 (50%)0120 MWnot reported2 filings
14Core Scientific21 (50%)0not reportednot reported6 filings
15Riot Platforms21 (50%)1not reportednot reported6 filings
16SB Energy21 (50%)01.2 GWnot reportedprivate / none
17CyrusOne80 (0%)7not reported1.6 GW1 filing
18Digital Realty70 (0%)3not reportednot reported6 filings
19PowerHouse Data Centers70 (0%)4not reported3.2 GW1 filing
20CloudHQ50 (0%)2not reportednot reported1 filing
21Crusoe Energy Systems50 (0%)3not reported1.9 GW1 filing
22DataBank50 (0%)2not reported312 MW2 filings
23STACK Infrastructure50 (0%)5not reported156 MW1 filing
24Applied Digital40 (0%)3not reported730 MW6 filings
25Cipher Digital40 (0%)2not reported500 MW6 filings
26EdgeCore40 (0%)2not reported72 MW1 filing
27Tract40 (0%)2not reported2.4 GW1 filing
28Aligned Data Centers30 (0%)2not reported740 MW1 filing
29Prime Data Centers30 (0%)1not reported240 MW1 filing
30Sabey Data Centers30 (0%)1not reportednot reported1 filing
31Stream Data Centers30 (0%)0not reportednot reported1 filing
32Bitdeer Technologies Group20 (0%)1not reported221 MW6 filings
33H5 Data Centers20 (0%)0not reportednot reported1 filing
34Hut 820 (0%)1not reported330 MW6 filings
35IREN (Iris Energy)20 (0%)1not reportednot reported6 filings
36Novva Data Centers20 (0%)1not reported300 MWprivate / none
37OpenAI20 (0%)1not reported1.0 GW6 filings
38TeraWulf20 (0%)2not reportednot reported6 filings

Includes operators with at least 2 satellite-tracked sites. Pipeline columns count planned and under-construction sites only, never operating capacity.

States: 2024 vs 2026 buildout

  • Texas
    9 filling (18%) · 21 little change
    50 tracked
  • Indiana
    5 filling (42%) · 3 little change
    12 tracked
  • Arizona
    3 filling (21%) · 7 little change
    14 tracked
  • Virginia
    2 filling (4%) · 30 little change
    45 tracked
  • Georgia
    2 filling (8%) · 10 little change
    24 tracked
  • Ohio
    2 filling (10%) · 12 little change
    20 tracked
  • Iowa
    2 filling (25%) · 2 little change
    8 tracked
  • Tennessee
    2 filling (33%) · 2 little change
    6 tracked
  • Mississippi
    2 filling (50%) · 2 little change
    4 tracked
  • Wisconsin
    2 filling (67%) · 0 little change
    3 tracked
  • Missouri
    1 filling (17%) · 3 little change
    6 tracked
  • Maryland
    1 filling (25%) · 2 little change
    4 tracked
  • Alabama
    1 filling (33%) · 1 little change
    3 tracked
  • Louisiana
    1 filling (33%) · 2 little change
    3 tracked
  • Minnesota
    1 filling (33%) · 1 little change
    3 tracked
  • New Jersey
    1 filling (33%) · 1 little change
    3 tracked
  • New Mexico
    1 filling (50%) · 0 little change
    2 tracked
  • Illinois
    0 filling (0%) · 4 little change
    13 tracked
  • Pennsylvania
    0 filling (0%) · 3 little change
    11 tracked
  • California
    0 filling (0%) · 3 little change
    8 tracked
  • New York
    0 filling (0%) · 1 little change
    5 tracked
  • Oregon
    0 filling (0%) · 2 little change
    5 tracked
  • Nebraska
    0 filling (0%) · 3 little change
    4 tracked
  • Nevada
    0 filling (0%) · 1 little change
    4 tracked
  • Utah
    0 filling (0%) · 1 little change
    4 tracked
  • North Dakota
    0 filling (0%) · 3 little change
    3 tracked
  • Oklahoma
    0 filling (0%) · 2 little change
    3 tracked
  • South Carolina
    0 filling (0%) · 1 little change
    3 tracked
  • Idaho
    0 filling (0%) · 2 little change
    2 tracked
  • Kentucky
    0 filling (0%) · 1 little change
    2 tracked
  • Michigan
    0 filling (0%) · 2 little change
    2 tracked
  • North Carolina
    0 filling (0%) · 0 little change
    2 tracked
  • Washington
    0 filling (0%) · 1 little change
    2 tracked
  • Wyoming
    0 filling (0%) · 1 little change
    2 tracked
#StateTrackedFillingLittle changePipeline fillingPipeline little change
1Texas509 (18%)213.6 GW23.7 GW
2Indiana125 (42%)32.0 GW2.4 GW
3Arizona143 (21%)7not reported810 MW
4Virginia452 (4%)30not reported9.5 GW
5Georgia242 (8%)10456 MW3.6 GW
6Ohio202 (10%)12690 MW2.4 GW
7Iowa82 (25%)22.2 GWnot reported
8Tennessee62 (33%)2not reportednot reported
9Mississippi42 (50%)2320 MW2.0 GW
10Wisconsin32 (67%)01.3 GWnot reported
11Missouri61 (17%)3700 MW1.2 GW
12Maryland41 (25%)22.0 GW150 MW
13Alabama31 (33%)1not reportednot reported
14Louisiana31 (33%)25.0 GW760 MW
15Minnesota31 (33%)1not reportednot reported
16New Jersey31 (33%)1not reported250 MW
17New Mexico21 (50%)02.5 GWnot reported
18Illinois130 (0%)4not reported3.4 GW
19Pennsylvania110 (0%)3not reported1.4 GW
20California80 (0%)3not reported90 MW
21New York50 (0%)1not reportednot reported
22Oregon50 (0%)2not reported84 MW
23Nebraska40 (0%)3not reportednot reported
24Nevada40 (0%)1not reported1.0 GW
25Utah40 (0%)1not reportednot reported
26North Dakota30 (0%)3not reported755 MW
27Oklahoma30 (0%)2not reportednot reported
28South Carolina30 (0%)1not reportednot reported
29Idaho20 (0%)2not reportednot reported
30Kentucky20 (0%)1not reported1.8 GW
31Michigan20 (0%)2not reported1.0 GW
32North Carolina20 (0%)0not reportednot reported
33Washington20 (0%)1not reportednot reported
34Wyoming20 (0%)1not reportednot reported

Includes states with at least 2 satellite-tracked sites.

United States data centers with 2024 vs 2026 satellite passes

All 290 satellite-tracked United States data centers, sorted with active 2024 to 2026 roof growth (filling) first.
#SiteOperatorLocationStatus2024 vs 2026 roof change
1Vantage Frontier (Lick Mountain)Vantage Data CentersAlbany, TexasUnder constructionFilling (+37 to +45 pts)
2QTS Cedar RapidsQTS Data CentersFairfax, IowaPlannedFilling (+22 to +30 pts)
3Google Project Mica CampusGoogleKansas City, MissouriUnder constructionFilling (+16 to +24 pts)
4Meta Rosemount Data CenterMetaRosemount, MinnesotaOperatingFilling (+16 to +24 pts)
5Google Mesa Redhawk CampusGoogleMesa, ArizonaOperatingFilling (+14 to +22 pts)
6Vantage TX1Vantage Data CentersSan Antonio, TexasOperatingFilling (+14 to +22 pts)
7Amazon AWS Project Rainier AI Mega-CampusAmazonNew Carlisle, IndianaOperatingFilling (+12 to +20 pts)
8Amazon AWS Madison County Mega-CampusAmazonCanton, MississippiOperatingFilling (+11 to +19 pts)
9QTS IrvingQTS Data CentersIrving, TexasOperatingFilling (+11 to +19 pts)
10Google Fort Wayne Cloud CampusGoogleFort Wayne, IndianaUnder constructionFilling (+10 to +18 pts)
11Compass Datacenters: MSCompass DatacentersMeridian, MississippiUnder constructionFilling (+10 to +18 pts)
12CoreWeave Chester VACoreWeaveChester, VirginiaOperatingFilling (+10 to +18 pts)
13Meta Hyperion CampusMetaRayville, LouisianaUnder constructionFilling (+9 to +17 pts)
14Google Cedar Rapids Data CenterGoogleCedar Rapids, IowaPlannedFilling (+9 to +17 pts)
15Project LighthouseVantage Data CentersPort Washington, WisconsinUnder constructionFilling (+8 to +16 pts)
16Google Midlothian Data CenterGoogleMidlothian, TexasOperatingFilling (+8 to +16 pts)
17Google Morgan County / MonroviaGoogleMonrovia, IndianaUnder constructionFilling (+8 to +16 pts)
18Meta Beaver Dam AI Data CenterMetaBeaver Dam, WisconsinUnder constructionFilling (+7 to +15 pts)
19Google Project Zodiac CampusGoogleFort Wayne, IndianaOperatingFilling (+7 to +15 pts)
20Meta Temple Data CenterMetaTemple, TexasOperatingFilling (+6 to +14 pts)
21Meta El Paso Data Center (Project Seafox)MetaEl Paso, TexasUnder constructionFilling (+5 to +13 pts)
22Meta Huntsville Data Center CampusMetaHuntsville, AlabamaOperatingFilling (+5 to +13 pts)
23DC Blox - ATL East Data CenterDC BLOXRockdale, GeorgiaUnder constructionFilling (+5 to +13 pts)
24xAI Colossus Cluster 2 / Macrohard (Tulane Road)SpaceXAIMemphis, TennesseeOperatingFilling (+4 to +12 pts)
25Equinix Hampton CampusEquinixHampton, GeorgiaUnder constructionFilling (+4 to +12 pts)
26Microsoft Goodyear Data CenterMicrosoftGoodyear, ArizonaOperatingFilling (+3 to +11 pts)
27MinihardSpaceXAIMemphis, TennesseeUnder constructionFilling (+3 to +11 pts)
28Stargate Project JupiterOracleSanta Teresa, New MexicoUnder constructionFilling (+2 to +10 pts)
29Meta Lebanon data centerMetaLebanon, IndianaUnder constructionFilling (+2 to +10 pts)
30Meta Bowling GreenMetaBowling Green, OhioUnder constructionFilling (+2 to +10 pts)
31Nebius AI Vineland FacilityNebiusVineland, New JerseyOperatingFilling (+2 to +10 pts)
32Vantage Goodyear Campus (PHX1)Vantage Data CentersGoodyear, ArizonaOperatingFilling (+2 to +10 pts)
33Cologix COL5CologixLewis Center, OhioUnder constructionFilling (+2 to +10 pts)
34Corscale Gainesville Crossing Hyperscale CampusCorscaleGainesville, VirginiaOperatingFilling (+2 to +10 pts)
35Quantum Frederick ProjectCatellus Development CorporationAdamstown, MarylandUnder constructionFilling (+1 to +9 pts)
36Stargate - Milam CampusSB EnergyBurlington, TexasUnder constructionFilling (+1 to +9 pts)
37Riot Platforms Corsicana Mega-CampusRiot PlatformsCorsicana, TexasOperatingFilling (+1 to +9 pts)
38Core Scientific / CoreWeave Denton AI Compute HubCore ScientificDenton, TexasOperatingFilling (+1 to +9 pts)
39Lancium & Crusoe Clean AI CampusCrusoe Energy SystemsAbilene, TexasOperatingLittle change (+1 to +9 pts)
40QTS Manassas 1QTS Data CentersManassas, VirginiaOperatingLittle change (+1 to +9 pts)
41DC BLOX Atlanta WestDC BLOXLithia Springs, GeorgiaUnder constructionLittle change (+1 to +9 pts)
42CyrusOne DFW10CyrusOneWhitney, TexasUnder constructionLittle change (0 to +8 pts)
43Bitdeer MassillonBitdeer Technologies GroupMassillon, OhioUnder constructionLittle change (0 to +8 pts)
44PowerHouse Arcola Bldg BPowerHouse Data CentersArcola, VirginiaPlannedLittle change (0 to +8 pts)
45Intergate ColumbiaSabey Data CentersEast Wenatchee, WashingtonPlannedLittle change (0 to +8 pts)
46Google MidAmerica Mega-Campus (Pryor)GooglePryor, OklahomaOperatingLittle change (-1 to +7 pts)
47STACK Infrastructure NVA02STACK InfrastructureManassas, VirginiaOperatingLittle change (-1 to +7 pts)
48Amazon AWS IAD - Massaponax Church RdAmazonCarters Store, VirginiaPlannedLittle change (-1 to +7 pts)
49Applied Digital Ellendale Data CenterApplied DigitalEllendale, North DakotaOperatingLittle change (-1 to +7 pts)
50Vantage Ashburn IIIVantage Data CentersAshburn, VirginiaPlannedLittle change (-1 to +7 pts)
51PowerHouse Pacific CampusPowerHouse Data CentersSterling, VirginiaUnder constructionLittle change (-1 to +7 pts)
52CoreWeave Kenilworth Data CenterCoreWeaveKenilworth, New JerseyUnder constructionLittle change (-1 to +7 pts)
53Amazon AWS IAD - Wellington Glen Tech ParkAmazonManassas, VirginiaPlannedLittle change (-1 to +7 pts)
54Databank IAD5 - CulpeperDataBankCulpeper, VirginiaUnder constructionLittle change (-1 to +7 pts)
55Corscale Gainesville - Bldg 3CorscaleGainesville, VirginiaUnder constructionLittle change (-1 to +7 pts)
56xAI MacrohardrrSpaceXAISouthaven, MississippiUnder constructionLittle change (-2 to +6 pts)
57Project Spade (Google New Florence)GoogleNew Florence, MissouriPlannedLittle change (-2 to +6 pts)
58Amazon RidgelandAmazonRidgeland, MississippiOperatingLittle change (-2 to +6 pts)
59Stargate MichiganOpenAISaline Township, MichiganUnder constructionLittle change (-2 to +6 pts)
60Crusoe & Lancium Abilene Expansion (Microsoft AI Factory)Crusoe Energy SystemsAbilene, TexasUnder constructionLittle change (-2 to +6 pts)
61Microsoft Fairwater Atlanta AI Mega-CampusMicrosoftFayetteville, GeorgiaOperatingLittle change (-2 to +6 pts)
62Riot Platforms Rockdale CampusRiot PlatformsRockdale, TexasOperatingLittle change (-2 to +6 pts)
63Google Papillion & Northwest Omaha CampusesGooglePapillion, NebraskaOperatingLittle change (-2 to +6 pts)
64Lake Mariner - CB-3, CB-4 & CB-5TeraWulfBarker, New YorkOperatingLittle change (-2 to +6 pts)
65Prime Phoenix Data Center CampusPrime Data CentersAvondale, ArizonaUnder constructionLittle change (-2 to +6 pts)
66STACK Infrastructure NVA04 CampusSTACK InfrastructureSterling, VirginiaOperatingLittle change (-2 to +6 pts)
67DataBank IAD6 - CulpeperDataBankCulpeper, VirginiaUnder constructionLittle change (-2 to +6 pts)
68STACK Infrastructure NVA06BSTACK InfrastructureLeesburg, VirginiaUnder constructionLittle change (-2 to +6 pts)
69Crusoe & Lancium Childress Clean AI CampusCrusoe Energy SystemsChildress, TexasPlannedLittle change (-3 to +5 pts)
7075 South Data Center CampusIndustrial VI Enterprises, LLCGeorgiaPlannedLittle change (-3 to +5 pts)
71Applied Digital Delta Forge 1 (Project Lightning)Applied DigitalBoyce, LouisianaUnder constructionLittle change (-3 to +5 pts)
72Cipher Digital Barber Lake CampusCipher DigitalColorado City, TexasUnder constructionLittle change (-3 to +5 pts)
73Meta Kuna Mega-CampusMetaKuna, IdahoOperatingLittle change (-3 to +5 pts)
74STACK Infrastructure PHX01STACK InfrastructureAvondale, ArizonaOperatingLittle change (-3 to +5 pts)
75Google Project PeanutGoogleChester, VirginiaPlannedLittle change (-3 to +5 pts)
7637887 Shinn StreetValley Oak PartnersFremont, CaliforniaPlannedLittle change (-3 to +5 pts)
77Prime Ohio Corporate Park5C Data CentersSpringfield, OhioUnder constructionLittle change (-3 to +5 pts)
78CleanSpark Sandersville AI Mega-CampusCleanSparkSandersville, GeorgiaUnder constructionLittle change (-3 to +5 pts)
79Nebius AI Flagship Campus (Independence)NebiusIndependence / Kansas City, MissouriUnder constructionLittle change (-3 to +5 pts)
80Project MatadorFermi AmericaPanhandle, TexasUnder constructionLittle change (-4 to +4 pts)
81North Creek Tech CampusAmazonVirginiaPlannedLittle change (-4 to +4 pts)
82AWS Hobart Data Center CampusAmazonHobart, IndianaPlannedLittle change (-4 to +4 pts)
83Hanover Technology ParkTractAshland, VirginiaPlannedLittle change (-4 to +4 pts)
84Joliet Technology CenterPowerHouse Data CentersJoliet, IllinoisPlannedLittle change (-4 to +4 pts)
85Paducah American Energy HubBrookfieldWest Paducah, KentuckyPlannedLittle change (-4 to +4 pts)
86Hampton Technology ParkHampton Technology Park Owner, LLCHampton, GeorgiaPlannedLittle change (-4 to +4 pts)
87Wilderness CrossingAmazonVirginiaPlannedLittle change (-4 to +4 pts)
88PAX - Pennsylvania Digital ICarlisle Development PartnersPennsylvaniaUnder constructionLittle change (-4 to +4 pts)
89CloudBurst San Marcos Data CenterCloudBurst Data CentersSan Marcos, TexasUnder constructionLittle change (-4 to +4 pts)
90Microsoft West Des Moines Cloud Cluster (Ginger & Osmium)MicrosoftWest Des Moines, IowaOperatingLittle change (-4 to +4 pts)
91Monarch Data CenterCopia PowerYerington, NevadaPlannedLittle change (-4 to +4 pts)
92Taylor Technology Campus (Project Mustang)PowerHouse Data CentersTaylor, TexasPlannedLittle change (-4 to +4 pts)
93TerraWatt Riverbend Technology Center (former Alton Steel site)TerraWattAlton, IllinoisPlannedLittle change (-4 to +4 pts)
94CleanArc VA1 CampusCleanArc Data CentersRuther Glen, VirginiaUnder constructionLittle change (-4 to +4 pts)
95Galaxy Helios Data CenterGalaxy DigitalAfton, TexasOperatingLittle change (-4 to +4 pts)
96Project Big PinePotentiaNew Boston, TexasPlannedLittle change (-4 to +4 pts)
97Vantage Millersport CampusVantage Data CentersFairfield, OhioUnder constructionLittle change (-4 to +4 pts)
98IREN Childress AI Hub (Horizon 1-4)IREN (Iris Energy)Childress, TexasOperatingLittle change (-4 to +4 pts)
99CyrusOne - Talkington Township CampusCyrusOneTalkington Township, IllinoisPlannedLittle change (-4 to +4 pts)
100Nixon Technology CenterAugusta Economic Development AuthorityAugusta, GeorgiaPlannedLittle change (-4 to +4 pts)
101Aligned LBB CampusAligned Data CentersAbernathy, TexasUnder constructionLittle change (-4 to +4 pts)
102Canoochee River RV Resort - Data Center ProjectCanoochee River RV Resort, LLCMetter, GeorgiaPlannedLittle change (-4 to +4 pts)
103Meta MontgomeryMetaMontgomery, AlabamaOperatingLittle change (-4 to +4 pts)
104Project Fighting PikeCritical Data HouseWilliston, North DakotaPlannedLittle change (-4 to +4 pts)
105Meta Sarpy County Data Center CampusMetaPapillion, NebraskaOperatingLittle change (-4 to +4 pts)
106Meta Kansas City data centerMetaKansas City, MissouriOperatingLittle change (-4 to +4 pts)
107CyrusOne DFW - FairfieldCyrusOneFairfield, TexasUnder constructionLittle change (-4 to +4 pts)
108QTS Richmond 3QTS Data CentersSandston, VirginiaOperatingLittle change (-4 to +4 pts)
109Hut 8 River Bend CampusHut 8West Feliciana Parish, LouisianaUnder constructionLittle change (-4 to +4 pts)
110Novva Data Centers Mesa CampusNovva Data CentersMesa, ArizonaUnder constructionLittle change (-4 to +4 pts)
111Polaris Forge 2 CampusApplied DigitalHarwood, North DakotaUnder constructionLittle change (-4 to +4 pts)
112Google BristowGoogleBristow, VirginiaOperatingLittle change (-4 to +4 pts)
113QTS Richmond 2QTS Data CentersSandston, VirginiaOperatingLittle change (-4 to +4 pts)
114Meta CheyenneMetaCheyenne, WyomingOperatingLittle change (-4 to +4 pts)
115UlyssesCipher DigitalPiketon, OhioPlannedLittle change (-4 to +4 pts)
116CyrusOne MesaCyrusOneMesa, ArizonaPlannedLittle change (-4 to +4 pts)
117PHX1-PHX8 (Phoenix)CyrusOneChandler, ArizonaOperatingLittle change (-4 to +4 pts)
118Meta AikenMetaTrenton, South CarolinaOperatingLittle change (-4 to +4 pts)
1191500 Woodlawn DriveSecurity Land and DevelopmentBaltimore, MarylandPlannedLittle change (-4 to +4 pts)
120Silicon Valley SJC35Digital RealtySanta Clara, CaliforniaOperatingLittle change (-4 to +4 pts)

Showing top 120 of 290 tracked sites; browse all facilities on the sites directory.

SEC filings, annual reports and financing disclosures for tracked United States operators

Publicly disclosed SEC Form 10-K/8-K/20-F filings, ASX/SGX/KRX/Bursa annual reports, and syndicated green loan disclosures for operators tracked above.
#Operator & disclosureTypePublisherDateFiling
1Vantage Data Centers: Vantage Data Centers Completes $9.2 Billion Equity Investment Led by DigitalBridge and Silver Lake
Details $9.2B in upsized equity investment led by DigitalBridge and Silver Lake alongside €1.5B from AustralianSuper across 35+ hyperscale campuses totaling >2.6 GW in North America (Ashburn.
8-K / Earnings ReleaseVantage Data Centers2025-06-12Open filing
2QTS Data Centers: QTS Data Centers (Blackstone BREIT / BPP) Global Hyperscale Portfolio & 3+ GW Pipeline Report
Covers QTS's $25B+ leased development pipeline across Northern Virginia (Manassas, Ashburn), Phoenix (Glendale, Tempe), Atlanta (Fayeteville, Suwanee), Dallas-Fort Worth (Fort Worth, Irving), New.
Annual ReportQTS Data Centers / Blackstone2025-07-23Open filing
3Google: Alphabet Inc. 8-K 2026-11-05: Other Events (8.01)
On November 5, 2026, Alphabet Inc. closed its public offering of €6 billion aggregate principal amount of euro-denominated senior notes. The principal executive offices of Alphabet Inc. are located.
8-KAlphabet (SEC 8-K)2026-11-05Open filing
4Google: Google Form 10-Q (Q3 2026)
Google Form 10-Q (Q3 2026) reports Revenue: USD 127.58bn (Q3 2026); Operating income: USD 40.58bn (Q3 2026); Net income: USD 26.47bn (Q3 2026); Property and equipment, net: USD 372.83bn (at.
10-QGoogle (SEC EDGAR)2026-09-30Open filing
5Google: Google Form 424B2, filed 2026-11-04424B2Google (SEC EDGAR)2026-11-04Open filing
6Meta: Meta Platforms, Inc. 8-K 2026-11-12: Other Events (8.01)
Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised.
8-KMeta Platforms (SEC 8-K)2026-11-12Open filing
7Meta: Meta Platforms, Inc. 8-K 2026-11-05: Other Events (8.01)
Meta Platforms, Inc. reported its principal executive offices at 1 Meta Way, Menlo Park, California 94025. The company completed an offering of various USD Notes and engaged in related agreements.
8-KMeta Platforms (SEC 8-K)2026-11-05Open filing
8Meta: Meta Platforms, Inc. 8-K 2026-10-29: Material Definitive Agreement (1.01)
Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised.
8-KMeta Platforms (SEC 8-K)2026-10-29Open filing
9Amazon: Amazon Form 10-Q (Q3 2026)
Amazon Form 10-Q (Q3 2026) reports Revenue: USD 201.94bn (Q3 2026); Operating income: USD 28.08bn (Q3 2026); Net income: USD 20.68bn (Q3 2026); Capital expenditure: USD 77.26bn (Q3 2026); Property.
10-QAmazon (SEC EDGAR)2026-09-30Open filing
10Amazon: Amazon Form 8-K, filed 2026-10-298-KAmazon (SEC EDGAR)2026-10-29Open filing
11Amazon: Amazon Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-10-29Open filing
12Compass Datacenters: Compass Datacenters (Brookfield Infrastructure & Ontario Teachers') $5.5B Modular Campus Report
Covers Compass Datacenters' multi-hundred-megawatt hyperscale campuses in Red Oak and Waxahachie (Dallas-Fort Worth, Texas), Leesburg and Prince William County (Northern Virginia), Goodyear.
Annual ReportCompass Datacenters / Brookfield2025-06-20Open filing
13CoreWeave: CoreWeave Form 8-K, filed 2026-11-10
CoreWeave, Inc. reported its third quarter 2026 financial results, showing record revenue and expanding margins from Livingston, N.J. The company raised its full year 2026 revenue guidance and.
8-KCoreWeave (SEC EDGAR)2026-11-10Open filing
14CoreWeave: CoreWeave Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-11-11Open filing
15CoreWeave: CoreWeave Expands Global AI Cloud and Network BackboneFiling2026-10-27Open filing
16DC BLOX: DC BLOX $1.15B Green Loan & Southeastern US Hyperscale Edge Data Center Footprint Report
Discloses $1.15B in senior secured green credit facilities and equity backing from Bain Capital and Post Road Group to build out hyperscale and edge colocation campuses across Atlanta (Conyers.
8-K / Earnings ReleaseDC BLOX / Bain Capital2025-05-15Open filing
17SpaceXAI: SpaceX: SPACE EXPLORATION TECHNOLOGIES CORP 8-K 2026-10-26: Other Events (8.01)
Emerging growth company ¨ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised.
8-KSpaceX (SEC 8-K)2026-10-26Open filing
18SpaceXAI: SpaceXAI Discloses $6.1M Stormwater Permit Exposure at Mississippi AI CampusFiling2026-10-24Open filing
19SpaceXAI: SpaceXAI Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-10-21Open filing
20Equinix: EQUINIX INC 8-K 2026-11-09: Other Events (8.01)
On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150%.
8-KEquinix (SEC 8-K)2026-11-09Open filing
21Equinix: Equinix Form 8-K, filed 2026-10-28
Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for.
8-KEquinix (SEC EDGAR)2026-10-28Open filing
22Equinix: Equinix Form 10-Q (2026-10-28)
Equinix Form 10-Q (2026-10-28) reports Revenue: USD 2.57bn (Q3 2026); Net income: USD 489.0m (Q3 2026).
10-QEquinix (SEC EDGAR)2026-09-30Open filing
23Microsoft: MICROSOFT CORP 8-K 2026-11-04: Other Events (8.01)
Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised.
8-KMicrosoft (SEC 8-K)2026-11-04Open filing
24Microsoft: Microsoft Form 8-K, filed 2026-10-28
Additional information regarding our non-GAAP definition is provided below. All growth comparisons relate to the corresponding period in the last fiscal year.
8-KMicrosoft (SEC EDGAR)2026-10-28Open filing
25Microsoft: Microsoft Form 10-Q (Q1 FY2027)
Microsoft Form 10-Q (Q1 FY2027) reports Revenue: USD 92.28bn (Q3 2026); Operating income: USD 45.91bn (Q3 2026); Net income: USD 36.63bn (Q3 2026); Capital expenditure: USD 39.37bn (Q3 2026).
10-QMicrosoft (SEC EDGAR)2026-09-30Open filing
26Nebius: Nebius Form 6-K, filed 2026-11-12
This filing is a Nebius Group N.V. Report on Form 6-K containing an operating and financial review for the three and nine months ended September 30, 2025 and 2026. It describes Nebius as a global AI.
6-KNebius (SEC EDGAR)2026-11-12Open filing
27Nebius: Nebius Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-11-12Open filing
28Nebius: Nebius Form 6-K, filed 2026-11-126-KNebius (SEC EDGAR)2026-11-12Open filing
29Cologix: Cologix (Stonepeak Infrastructure) $1.5B Equity & ABS Financing & 45+ North American Interconnection Sites Report
Details Cologix's 45+ carrier-hotel interconnection and Scalelogix hyperscale edge facilities across Columbus (8+ sites, 200+ MW), Ashburn, Dallas, Silicon Valley, New Jersey, Minneapolis, Montreal.
Annual ReportCologix / Stonepeak2025-05-25Open filing
30Cologix: Cologix data centers page (read 2026-11-09 04:50 UTC)FilingCologix (company website)Open filing
31Corscale: Corscale Data Centers (Patrizia Infrastructure) Gainesville Crossing & Hyperscale Campus Report
Details Corscale's 300+ MW Gainesville Crossing hyperscale data center campus in Prince William County, Northern Virginia, alongside pipeline developments in Dallas-Fort Worth and Phoenix.
Annual ReportCorscale / Patrizia2025-05-01Open filing
32Riot Platforms: Riot Platforms Form 8-K for an event on 2026-10-29, filed 2026-11-04
Riot Platforms, Inc. executed a 15-year, 910 critical IT MW triple-net powered land lease at Corsicana with a leading Frontier AI Lab, representing approximately $28 billion in total contract value.
8-KRiot Platforms (SEC EDGAR)2026-10-29Open filing
33Riot Platforms: Riot Platforms Form 8-K, filed 2026-08-10
Exhibit 99.1 Riot Platforms Reports Second Quarter 2026 Financial Results and Strategic Highlights Executed 20-year data center lease with a leading frontier AI lab for 191 MW of critical IT.
8-KRiot Platforms (SEC EDGAR)2026-08-10Open filing
34Riot Platforms: Riot Platforms, Inc. (NASDAQ: RIOT) FY 2024 Form 10-K Annual Report (Rockdale 700MW & Corsicana 1GW Campuses)
Details Riot's 700 MW Rockdale Facility and 1,000 MW (1.0 GW) Corsicana Facility in Navarro County, Texas (with 400 MW operational and 600 MW substation expansion undergoing formal AI/HPC hyperscale.
10-KSEC EDGAR2025-02-28Open filing
35Core Scientific: Core Scientific Form 8-K, filed 2026-11-05 (exhibit q3fy26earningsdeckvfinal.htm)
Core Scientific, Inc. reported that its colocation revenue increased nearly 60% sequentially to $215.4 million in the third quarter of 2026. The company operates facilities across Alabama, Georgia.
8-KCore Scientific (SEC EDGAR)2026-11-05Open filing
36Core Scientific: Core Scientific, Inc./tx 8-K 2026-09-10: Regulation FD Disclosure (7.01)
Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised.
8-KCore Scientific (SEC 8-K)2026-09-10Open filing
37Core Scientific: Core Scientific, Inc./tx 8-K 2026-08-14: Regulation FD Disclosure (7.01); Other Events (8.01)
Core Scientific, Inc. completed its acquisition of Polaris DS LLC for approximately $444 million in cash, securing about 440 megawatts of gross, grid-connected power capacity in Oklahoma. This.
8-KCore Scientific (SEC 8-K)2026-08-14Open filing
38Crusoe Energy Systems: Crusoe Energy Systems & Blue Owl $15B Abilene Texas Lancium Clean Campus AI Data Center Report
Details the 1.2 GW Abilene, Texas Lancium Clean Campus (Phase 1 200 MW + Phase 2 1,000 MW across 8 buildings backed by $15B in project debt and equity with Blue Owl and Primary Digital.
8-K / Earnings ReleaseCrusoe / Blue Owl / Primary Digital2025-05-22Open filing
39CyrusOne: CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio Report
Details CyrusOne's 55+ operational and under-development hyperscale data centers across North America (Northern Virginia, Dallas-Fort Worth, Phoenix, San Antonio, Chicago, Aurora), Europe (Frankfurt.
Annual ReportCyrusOne / KKR / GIP2025-06-10Open filing
40Bitdeer Technologies Group: Bitdeer Technologies Group Form 6-K, filed 2026-11-166-KBitdeer Technologies Group (SEC EDGAR)2026-11-16Open filing
41Bitdeer Technologies Group: Bitdeer Technologies Group Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-11-11Open filing
42Bitdeer Technologies Group: Bitdeer Technologies Group Form 6-K, filed 2026-11-106-KBitdeer Technologies Group (SEC EDGAR)2026-11-10Open filing
43PowerHouse Data Centers: PowerHouse Data Centers (American Real Estate Partners) Northern Virginia, Reno & Dallas Campus Report
Covers PowerHouse Data Centers' 30+ building hyperscale powered-shell and turnkey developments across Ashburn, Arcola, and Spotsylvania (Virginia), Reno (Nevada), Irving (Texas), and Charlotte.
Annual ReportPowerHouse Data Centers / AREP2025-05-12Open filing
44Sabey Data Centers: Sabey Data Centers (Sabey Corp. & National Real Estate Advisors) Hydro-Powered Portfolio Report
Details Sabey Data Centers' >450 MW Intergate portfolio across Central Washington (Intergate.Quincy, Intergate.Columbia in East Wenatchee), Seattle (Intergate.Seattle), Ashburn (Intergate.Ashburn).
Annual ReportSabey Data Centers2025-05-15Open filing
45STACK Infrastructure: STACK Infrastructure (Blue Owl / IPI Partners) Global 4+ GW Hyperscale Campus Report
Details STACK Infrastructure's multi-gigawatt operational and development footprint across Americas (Northern Virginia, Portland/Hillsboro, Phoenix, Dallas, Silicon Valley, Chicago, New Albany.
Annual ReportSTACK Infrastructure / Blue Owl2025-07-01Open filing
46Applied Digital: CoreWeave Ellendale ND - SEC 8-k filing
# SEC 8-k filing Primary Source URL: https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm Publisher: US Securities and Exchange Commission Referenced Frontier Data Center.
8-KUS Securities and Exchange Commission2026-10-19Open filing
47Applied Digital: Applied Digital Corp. 8-K 2026-10-07: Results of Operations (2.02)
Applied Digital Corporation reported fiscal first quarter 2027 results, including revenues of $341.9 million and a net loss attributable to common stockholders of $221.0 million. The data center.
8-KApplied Digital (SEC 8-K)2026-10-07Open filing
48Applied Digital: Applied Digital 10-Q 2026-10-07
Applied Digital reported $262.6M of HPC Hosting Business revenue and $37.8M of Data Center Hosting revenue for the three months ended August 31, 2026. Its Polaris Forge 1 campus (Ellendale, ND).
10-QApplied Digital (SEC EDGAR)2026-08-31Open filing
49DataBank: DataBank $2.0B Equity Financing (AustralianSuper & DigitalBridge) & 65+ US Data Center Footprint Report
Discloses $2.0B in new equity capital led by AustralianSuper and DigitalBridge plus $1.1B+ in securitized debt to fund 850+ MW of hyperscale and edge colocation developments across Atlanta (Lithia.
8-K / Earnings ReleaseDataBank / DigitalBridge2025-10-08Open filing
50DataBank: DataBank website, home page (read 2026-11-09 04:50 UTC)FilingDataBank (company website)2022-04-12Open filing
51OpenAI: Campus Chip Deployment: OpenAI Stargate UAEFilingEpoch AI / SemiAnalysis2026-10-19Open filing
52OpenAI: OpenAI Stargate Abilene - announcementFilingCrusoe Energy Official2026-10-19Open filing
53OpenAI: Multi-Datacenter Training: OpenAI's Ambitious Plan To Beat Google's InfrastructureFilingSemiAnalysis Datacenter Research2026-10-19Open filing
54TeraWulf: TeraWulf Form 8-K, filed 2026-11-06 (exhibit terawulfq32026investorpr.htm)
TeraWulf Inc. reported its third quarter 2026 results, showing $76.2 million in total revenue, which included $63.0 million of HPC lease revenue. The company executed a 20-year lease with Anthropic.
8-KTeraWulf (SEC EDGAR)2026-11-06Open filing
55TeraWulf: TERAWULF INC. 8-K 2026-11-04: Material Definitive Agreement (1.01); Regulation FD Disclosure (7.01); Other Events (8.01)
TeraWulf Inc. secured Google credit support for project financing tied to $19 billion of contracted Anthropic lease commitments at its Justified Data Campus in Hawesville, Kentucky. The company also.
8-KTeraWulf (SEC 8-K)2026-11-04Open filing
56TeraWulf: TERAWULF INC. 8-K 2026-10-05: Other Events (8.01)
TeraWulf Inc. expanded the contracted power capacity at its Muskie Data Campus in eastern Kentucky from 500 megawatts to 1 gigawatt through an amended agreement with Kentucky Power. The amendment.
8-KTeraWulf (SEC 8-K)2026-10-05Open filing
57Prime Data Centers: Prime Data Centers (Macquarie & Snowhawk) Global Hyperscale Wholesale Campus Report
Covers Prime Data Centers' wholesale hyperscale campuses across Chicago (Elk Grove Village 175 MW), Phoenix (Avondale), Sacramento (McClellan Park), Silicon Valley (Santa Clara), Los Angeles.
Annual ReportPrime Data Centers2025-05-10Open filing
58Cipher Digital: Cipher Digital 8-K 2026-10-14
Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-14 (2026, United States):
8-KCipher Digital (SEC EDGAR)2026-10-14Open filing
59Cipher Digital: Cipher Digital 8-K 2026-10-13
Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-13 (2026, United States):
8-KCipher Digital (SEC EDGAR)2026-10-13Open filing
60Cipher Digital: Cipher Digital 8-K 2026-10-16
Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-16 (2026, United States):
8-KCipher Digital (SEC EDGAR)2026-10-13Open filing
615C Data Centers: 5C Data Centers North American AI & Hyperscale Colocation Infrastructure Report
Details 5C Data Centers' high-density liquid-cooled AI and hyperscale colocation campuses across Columbus (Ohio), Dallas-Fort Worth (Texas), Phoenix (Arizona), and Atlanta (Georgia).
Annual Report5C Data Centers2025-05-18Open filing
62CleanSpark: CleanSpark Form 8-K, filed 2026-09-17
Sandersville Investor Presentation S e p t e m b e r 2 0 2 6 2 Legal Disclaimer This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform.
8-KCleanSpark (SEC EDGAR)2026-09-17Open filing
63CleanSpark: CleanSpark Form 8-K, filed 2026-08-06
EXHIBIT 99.1 CleanSpark Reports Third Fiscal Quarter 2026 Results Signed 20-year $6.6 billion triple-net lease at Sandersville with high investment-grade tenant Ordered and pre-paid all long-lead.
8-KCleanSpark (SEC EDGAR)2026-08-06Open filing
64CleanSpark: CleanSpark Form 8-K, filed 2026-09-258-KCleanSpark (SEC EDGAR)2026-09-25Open filing
65Tract: Tract Capital Master-Planned Gigawatt Data Center Land & Power Parks Portfolio Report
Details Tract's 23,000+ acre portfolio of zoned, utility-served gigawatt data center parks across Reno (Storey County, Nevada), Buckeye (Maricopa County, Arizona), Eagle Mountain (Utah), Caldwell.
Annual ReportTract Capital2025-06-10Open filing
66Galaxy Digital: Galaxy Digital Form 8-K, filed 2026-10-27
Galaxy Digital Inc. reported its third quarter 2026 financial results, highlighting a growing contribution from its Data Centers business and the expansion of its data center footprint to over 5.7.
8-KGalaxy Digital (SEC EDGAR)2026-10-27Open filing
67Galaxy Digital: Galaxy Digital Form 8-K, filed 2026-08-05
In this press release, a reference to "Galaxy," "we," "our" and similar words refers to GDI, its subsidiaries and affiliates, and, prior to the Reorganization Transactions, refers to Galaxy Digital.
8-KGalaxy Digital (SEC EDGAR)2026-08-05Open filing
68Galaxy Digital: Galaxy Digital Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-10-27Open filing
69IREN (Iris Energy): IREN Ltd 8-K 2026-11-05: Results of Operations (2.02)
IREN reported financial results for the three months ended September 30, 2026, including total revenue of $228 million and AI Cloud revenue of $200 million. The company secured over 30,000 acres of.
8-KIREN (SEC 8-K)2026-11-05Open filing
70IREN (Iris Energy): IREN (Iris Energy) Q1 2027 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-11-06Open filing
71IREN (Iris Energy): IREN (Iris Energy) Form DEF 14A for the meeting on 2026-11-24, filed 2026-10-13DEF 14AIREN (Iris Energy) (SEC EDGAR)2026-10-13Open filing
72Aligned Data Centers: Aligned Data Centers (Macquarie Asset Management) $12B Equity & Debt Financing & 5+ GW Pipeline Report
Discloses $5B in primary equity led by Macquarie Asset Management and $7B+ in debt commitments to expand over 5 GW of operational and planned capacity featuring Delta3 air and DeltaFlow liquid.
8-K / Earnings ReleaseAligned Data Centers / Macquarie2025-01-15Open filing
73Hut 8: Hut 8 Form 8-K, filed 2026-11-04
Hut 8 Corp. reported its third quarter 2026 financial results, highlighting the commercialization of its Beacon Point AI data center campus and the advancement of 1,300 MW of energy capacity to.
8-KHut 8 (SEC EDGAR)2026-11-04Open filing
74Hut 8: Hut 8 Form 8-K, filed 2026-08-04
Exhibit 99.1 Hut 8 Reports Second Quarter 2026 Results Power-first execution model compounds across the Company’s first two AI data center campuses 949 MW of contracted IT capacity, approximately.
8-KHut 8 (SEC EDGAR)2026-08-04Open filing
75Hut 8: Hut 8 Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-11-04Open filing
76Digital Realty: DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01)
In connection with Digital Realty Trust, Inc.’s (the “Company”) previously-disclosed acquisition on October 19, 2026 of approximately 16% of the interests in the company’s Teraco joint venture.
8-KDigital Realty (SEC 8-K)2026-10-30Open filing
77Digital Realty: Digital Realty Form 8-K, filed 2026-10-29
Digital Realty Trust, Inc. owns, acquires, develops, and operates data centers through its operating partnership subsidiary, Digital Realty Trust, L.P. As of September 30, 2026, the company's 311.
8-KDigital Realty (SEC EDGAR)2026-10-29Open filing
78Digital Realty: Digital Realty Form 8-K, filed 2026-07-23
The company is focused on providing data center, colocation, and interconnection solutions for domestic and international customers across a variety of industry verticals ranging from cloud and.
8-KDigital Realty (SEC EDGAR)2026-07-23Open filing
79CloudHQ: CloudHQ Global Hyperscale Data Center Campus Portfolio & Multi-Billion Project Financing Report
Discloses CloudHQ's hyperscale campus developments across Northern Virginia (Manassas, Ashburn, Culpeper), Mount Prospect (Chicago, Illinois), Chaska (Minnesota), Offenbach (Frankfurt), Didcot.
Annual ReportCloudHQ2025-06-05Open filing
80EdgeCore: EdgeCore Digital Infrastructure (Partners Group) $4.2B Financing & 1+ GW Hyperscale Campus Report
Discloses over $4.2B in equity and green debt financing led by Partners Group across EdgeCore's 300+ MW Mesa (Phoenix), Culpeper and Ashburn (Virginia), Reno (Tahoe-Reno Industrial Center), Santa.
Annual ReportEdgeCore / Partners Group2025-06-12Open filing
81MARA Holdings: MARA Holdings, Inc. 8-K 2026-11-17: Other Events (8.01)
MARA Holdings' subsidiary MARA USA priced a $185 million offering of 8.750% Senior Secured Notes due 2032, issued by Long Ridge Energy LLC, at 99.000% of principal. The proceeds are tied to MARA.
8-KMARA Holdings (SEC 8-K)2026-11-17Open filing
82MARA Holdings: MARA Holdings Form 8-K, filed 2026-11-09 (exhibit q32026earningsannouncement.htm)
Net income increased to $632.1 million IN Q3 2026 from $123.1 million in Q3 2025 . Adjusted EBITDA increased to $857.7 million IN Q3 2026 compared to $395.6 million in Q3 2025 .
8-KMARA Holdings (SEC EDGAR)2026-11-09Open filing
83MARA Holdings: MARA Holdings, Inc. 8-K 2026-09-25: Material Definitive Agreement (1.01)
Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised.
8-KMARA Holdings (SEC 8-K)2026-09-25Open filing
84Prologis: Prologis Form 10-Q (Q3 2026)
Prologis (Prologis Form 10-Q (Q3 2026)) reported in its financial statements: Capex: $1,626,921 USD (thousands) (9M 2026), Gross Revenue: $2,387,518 USD (Q3 2026), Debt Amount: $8.2 USD (Q3 2026).
10-QPrologis (SEC EDGAR)2026-09-30Open filing
85Prologis: Prologis Form 10-K (FY 2025)
Prologis Form 10-K (FY 2025) reports Net income: USD 3.57bn (FY 2025).
10-KPrologis (SEC EDGAR)2025-12-31Open filing
86Prologis: Prologis Q3 2026 earnings call transcriptEarnings call transcriptMotley Fool (call transcript)2026-10-16Open filing
87Switch: Switch, Inc. (DigitalBridge & IFM Investors) Tier 5 Prime Campus & 100% Renewable Power Report
Details Switch's five North American Prime hyperscale campus ecosystems: The Core Campus (Las Vegas, Nevada), The Citadel Campus (Tahoe Reno, Nevada), The Rock Campus (Austin and Round Rock, Texas).
Annual ReportSwitch / DigitalBridge2025-05-20Open filing
88Yondr Group: Yondr Group (DigitalBridge & La Caisse) Global Hyperscale Campus Portfolio (Slough, Frankfurt, Johor, Loudoun)
Covers Yondr Group's 1+ GW hyperscale development portfolio across London Slough (100 MW campus across 3 buildings), Frankfurt (40 MW Bischofsheim), Johor Sedenak Tech Park (300 MW campus backed by.
Annual ReportYondr Group / DigitalBridge2025-07-10Open filing
89AVAIO Digital Partners: AVAIO Digital Partners $3B+ North American & European Sustainable Data Center Campus Report
Covers AVAIO Digital's multi-gigawatt sustainable hyperscale data center development campuses across Brandon (Mississippi, $6B Project Chili), Appomattox (Virginia, 300 MW), Little Rock (Arkansas).
Annual ReportAVAIO Digital Partners2025-05-20Open filing
90Skybox Datacenters: Skybox Datacenters & Prologis $4B+ Powered Shell & Turnkey Hyperscale Development Report
Covers Skybox Datacenters' joint venture with Prologis and Bandera Ventures developing multi-hundred-megawatt campuses in Dallas-Fort Worth (Legacy, Lancaster, Plano), Austin (Hutto, Pflugerville).
Annual ReportSkybox Datacenters / Prologis2025-06-05Open filing
91T5: T5 Data Centers North American Hyperscale Turnkey & Facility Management Portfolio Report
Covers T5 Data Centers' owned and operated campuses across Chicago (T5@Chicago and Grayslake), Atlanta (T5@Atlanta, Augusta), Charlotte (T5@Kings Mountain), Dallas (T5@Dallas Plano), Minneapolis.
Annual ReportT5 Data Centers2025-05-14Open filing
92Stream Data Centers: Stream Data Centers (Apollo Global Management) 4+ GW Hyperscale Campus Development Report
Discloses Stream Data Centers' >4 GW hyperscale development platform (acquired by Apollo-managed funds) spanning Phoenix (Goodyear), Chicago (Elk Grove), Dallas-Fort Worth (Garland, Wilmer), San.
Annual ReportStream Data Centers / Apollo2025-06-15Open filing
93EdgeConneX: EdgeConneX (EQT Infrastructure) 2025 Sustainability & 50+ Global Market Capacity Report
Reports EdgeConneX operating and developing 80+ data centers across 50+ global markets in North America (Phoenix, Hillsboro, Ashburn, Atlanta, Chicago, New Albany), Europe (Amsterdam, Brussels.
Annual ReportEdgeConneX / EQT Infrastructure2025-06-18Open filing
94EdgeConneX: EdgeConneX website, home page (read 2026-11-09 04:50 UTC)FilingEdgeConneX (company website)2019-12-11Open filing
95Flexential: Flexential website, home page (read 2026-11-19 07:39 UTC)FilingFlexential (company website)Open filing
96Flexential: Flexential Corp. US$2.1B ABS Data Center Securitization and GI Partners / Morgan Stanley Portfolio Report
Details Flexential asset-backed notes securitization and 42-facility U.S. colocation footprint (350+ MW across Hillsboro Oregon, Atlanta, Dallas, Denver, Charlotte, Tampa, and Salt Lake City).
ABS FilingFlexential / GI Partners2025-09-12Open filing
97Centersquare: Brookfield Infrastructure Partners (NYSE: BIP) SEC Form 20-F: Centersquare (Evoque + Cyxtera) 70-Site Portfolio
Details Brookfield Infrastructure combination of Evoque Data Center Solutions and Cyxtera Technologies into Centersquare, operating 70+ North American and European data centers with over 400 MW of.
20-FSEC EDGAR / Brookfield Infrastructure Partners2026-03-14Open filing
98H5 Data Centers: H5 Data Centers 22-Market US Carrier Hotel & Edge Colocation Portfolio Report
Details H5 Data Centers' 4M+ sq ft US colocation and interconnection portfolio across Ashburn, Atlanta, Charlotte, Cincinnati, Cleveland, Colorado Springs, Denver, Phoenix, Quincy, San Antonio, San.
Annual ReportH5 Data Centers2025-04-20Open filing

Full market dataset & site-level records

Open the interactive 2024 vs 2026 satellite slider for 290 United States data centers

Inspect before-and-after 10 m satellite imagery side by side, exact parcel coordinates, and every sourced filing.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

What does the 2024 vs 2026 satellite tracker measure?

It compares clear 10 m satellite passes from 2024 against 2025 to 2026 passes for each mapped data center campus. Sites where roofed share rose by more than 5 percentage points are labeled filling; others with clear passes are labeled little change.

How many United States data centers have 2024 vs 2026 satellite comparisons?

As of 19 November 2026, 290 published United States data centers carry 2024 vs 2026 satellite pass comparisons (38 filling since 2024, 130 little change).

Why are exact roof percentages not published?