← United States data centers · All sites
2024 vs 2026 satellite construction tracker
United States data centers:2024 vs 2026 satellite buildout.
2024 to 2026 satellite roof-growth tracking across 290 United States data centers: 38 filling, 130 little change. Every row links to the facility's public record and original sources; the interactive 2024 vs 2026 curtain slider opens inside the workspace.
Operators: 2024 vs 2026 buildout
- Meta
8 filling (33%) · 12 little change24 tracked - Google
7 filling (30%) · 8 little change23 tracked - Vantage Data Centers
4 filling (50%) · 2 little change8 tracked - Amazon
2 filling (15%) · 8 little change13 tracked - QTS Data Centers
2 filling (17%) · 4 little change12 tracked - SpaceXAI
2 filling (40%) · 2 little change5 tracked - Microsoft
1 filling (8%) · 8 little change13 tracked - Nebius
1 filling (20%) · 1 little change5 tracked - Compass Datacenters
1 filling (25%) · 0 little change4 tracked - CoreWeave
1 filling (25%) · 1 little change4 tracked - DC BLOX
1 filling (25%) · 1 little change4 tracked - Corscale
1 filling (33%) · 2 little change3 tracked - Cologix
1 filling (50%) · 0 little change2 tracked - Core Scientific
1 filling (50%) · 0 little change2 tracked - Riot Platforms
1 filling (50%) · 1 little change2 tracked - SB Energy
1 filling (50%) · 0 little change2 tracked - CyrusOne
0 filling (0%) · 7 little change8 tracked - Digital Realty
0 filling (0%) · 3 little change7 tracked - PowerHouse Data Centers
0 filling (0%) · 4 little change7 tracked - CloudHQ
0 filling (0%) · 2 little change5 tracked - Crusoe Energy Systems
0 filling (0%) · 3 little change5 tracked - DataBank
0 filling (0%) · 2 little change5 tracked - STACK Infrastructure
0 filling (0%) · 5 little change5 tracked - Applied Digital
0 filling (0%) · 3 little change4 tracked - Cipher Digital
0 filling (0%) · 2 little change4 tracked - EdgeCore
0 filling (0%) · 2 little change4 tracked - Tract
0 filling (0%) · 2 little change4 tracked - Aligned Data Centers
0 filling (0%) · 2 little change3 tracked - Prime Data Centers
0 filling (0%) · 1 little change3 tracked - Sabey Data Centers
0 filling (0%) · 1 little change3 tracked - Stream Data Centers
0 filling (0%) · 0 little change3 tracked - Bitdeer Technologies Group
0 filling (0%) · 1 little change2 tracked - H5 Data Centers
0 filling (0%) · 0 little change2 tracked - Hut 8
0 filling (0%) · 1 little change2 tracked - IREN (Iris Energy)
0 filling (0%) · 1 little change2 tracked - Novva Data Centers
0 filling (0%) · 1 little change2 tracked - OpenAI
0 filling (0%) · 1 little change2 tracked - TeraWulf
0 filling (0%) · 2 little change2 tracked
| # | Operator | Tracked | Filling | Little change | Pipeline filling | Pipeline little change | Filings |
|---|---|---|---|---|---|---|---|
| 1 | Meta | 24 | 8 (33%) | 12 | 8.0 GW | not reported | 6 filings |
| 2 | 23 | 7 (30%) | 8 | 2.3 GW | 1.4 GW | 6 filings | |
| 3 | Vantage Data Centers | 8 | 4 (50%) | 2 | 2.3 GW | 1.1 GW | 1 filing |
| 4 | Amazon | 13 | 2 (15%) | 8 | not reported | 7.3 GW | 6 filings |
| 5 | QTS Data Centers | 12 | 2 (17%) | 4 | 1.6 GW | not reported | 1 filing |
| 6 | SpaceXAI | 5 | 2 (40%) | 2 | not reported | 2.0 GW | 6 filings |
| 7 | Microsoft | 13 | 1 (8%) | 8 | not reported | 422 MW | 6 filings |
| 8 | Nebius | 5 | 1 (20%) | 1 | not reported | not reported | 6 filings |
| 9 | Compass Datacenters | 4 | 1 (25%) | 0 | 320 MW | not reported | 1 filing |
| 10 | CoreWeave | 4 | 1 (25%) | 1 | not reported | 250 MW | 6 filings |
| 11 | DC BLOX | 4 | 1 (25%) | 1 | 216 MW | 120 MW | 1 filing |
| 12 | Corscale | 3 | 1 (33%) | 2 | not reported | 134 MW | 1 filing |
| 13 | Cologix | 2 | 1 (50%) | 0 | 120 MW | not reported | 2 filings |
| 14 | Core Scientific | 2 | 1 (50%) | 0 | not reported | not reported | 6 filings |
| 15 | Riot Platforms | 2 | 1 (50%) | 1 | not reported | not reported | 6 filings |
| 16 | SB Energy | 2 | 1 (50%) | 0 | 1.2 GW | not reported | private / none |
| 17 | CyrusOne | 8 | 0 (0%) | 7 | not reported | 1.6 GW | 1 filing |
| 18 | Digital Realty | 7 | 0 (0%) | 3 | not reported | not reported | 6 filings |
| 19 | PowerHouse Data Centers | 7 | 0 (0%) | 4 | not reported | 3.2 GW | 1 filing |
| 20 | CloudHQ | 5 | 0 (0%) | 2 | not reported | not reported | 1 filing |
| 21 | Crusoe Energy Systems | 5 | 0 (0%) | 3 | not reported | 1.9 GW | 1 filing |
| 22 | DataBank | 5 | 0 (0%) | 2 | not reported | 312 MW | 2 filings |
| 23 | STACK Infrastructure | 5 | 0 (0%) | 5 | not reported | 156 MW | 1 filing |
| 24 | Applied Digital | 4 | 0 (0%) | 3 | not reported | 730 MW | 6 filings |
| 25 | Cipher Digital | 4 | 0 (0%) | 2 | not reported | 500 MW | 6 filings |
| 26 | EdgeCore | 4 | 0 (0%) | 2 | not reported | 72 MW | 1 filing |
| 27 | Tract | 4 | 0 (0%) | 2 | not reported | 2.4 GW | 1 filing |
| 28 | Aligned Data Centers | 3 | 0 (0%) | 2 | not reported | 740 MW | 1 filing |
| 29 | Prime Data Centers | 3 | 0 (0%) | 1 | not reported | 240 MW | 1 filing |
| 30 | Sabey Data Centers | 3 | 0 (0%) | 1 | not reported | not reported | 1 filing |
| 31 | Stream Data Centers | 3 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 32 | Bitdeer Technologies Group | 2 | 0 (0%) | 1 | not reported | 221 MW | 6 filings |
| 33 | H5 Data Centers | 2 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 34 | Hut 8 | 2 | 0 (0%) | 1 | not reported | 330 MW | 6 filings |
| 35 | IREN (Iris Energy) | 2 | 0 (0%) | 1 | not reported | not reported | 6 filings |
| 36 | Novva Data Centers | 2 | 0 (0%) | 1 | not reported | 300 MW | private / none |
| 37 | OpenAI | 2 | 0 (0%) | 1 | not reported | 1.0 GW | 6 filings |
| 38 | TeraWulf | 2 | 0 (0%) | 2 | not reported | not reported | 6 filings |
Includes operators with at least 2 satellite-tracked sites. Pipeline columns count planned and under-construction sites only, never operating capacity.
States: 2024 vs 2026 buildout
- Texas
9 filling (18%) · 21 little change50 tracked - Indiana
5 filling (42%) · 3 little change12 tracked - Arizona
3 filling (21%) · 7 little change14 tracked - Virginia
2 filling (4%) · 30 little change45 tracked - Georgia
2 filling (8%) · 10 little change24 tracked - Ohio
2 filling (10%) · 12 little change20 tracked - Iowa
2 filling (25%) · 2 little change8 tracked - Tennessee
2 filling (33%) · 2 little change6 tracked - Mississippi
2 filling (50%) · 2 little change4 tracked - Wisconsin
2 filling (67%) · 0 little change3 tracked - Missouri
1 filling (17%) · 3 little change6 tracked - Maryland
1 filling (25%) · 2 little change4 tracked - Alabama
1 filling (33%) · 1 little change3 tracked - Louisiana
1 filling (33%) · 2 little change3 tracked - Minnesota
1 filling (33%) · 1 little change3 tracked - New Jersey
1 filling (33%) · 1 little change3 tracked - New Mexico
1 filling (50%) · 0 little change2 tracked - Illinois
0 filling (0%) · 4 little change13 tracked - Pennsylvania
0 filling (0%) · 3 little change11 tracked - California
0 filling (0%) · 3 little change8 tracked - New York
0 filling (0%) · 1 little change5 tracked - Oregon
0 filling (0%) · 2 little change5 tracked - Nebraska
0 filling (0%) · 3 little change4 tracked - Nevada
0 filling (0%) · 1 little change4 tracked - Utah
0 filling (0%) · 1 little change4 tracked - North Dakota
0 filling (0%) · 3 little change3 tracked - Oklahoma
0 filling (0%) · 2 little change3 tracked - South Carolina
0 filling (0%) · 1 little change3 tracked - Idaho
0 filling (0%) · 2 little change2 tracked - Kentucky
0 filling (0%) · 1 little change2 tracked - Michigan
0 filling (0%) · 2 little change2 tracked - North Carolina
0 filling (0%) · 0 little change2 tracked - Washington
0 filling (0%) · 1 little change2 tracked - Wyoming
0 filling (0%) · 1 little change2 tracked
| # | State | Tracked | Filling | Little change | Pipeline filling | Pipeline little change |
|---|---|---|---|---|---|---|
| 1 | Texas | 50 | 9 (18%) | 21 | 3.6 GW | 23.7 GW |
| 2 | Indiana | 12 | 5 (42%) | 3 | 2.0 GW | 2.4 GW |
| 3 | Arizona | 14 | 3 (21%) | 7 | not reported | 810 MW |
| 4 | Virginia | 45 | 2 (4%) | 30 | not reported | 9.5 GW |
| 5 | Georgia | 24 | 2 (8%) | 10 | 456 MW | 3.6 GW |
| 6 | Ohio | 20 | 2 (10%) | 12 | 690 MW | 2.4 GW |
| 7 | Iowa | 8 | 2 (25%) | 2 | 2.2 GW | not reported |
| 8 | Tennessee | 6 | 2 (33%) | 2 | not reported | not reported |
| 9 | Mississippi | 4 | 2 (50%) | 2 | 320 MW | 2.0 GW |
| 10 | Wisconsin | 3 | 2 (67%) | 0 | 1.3 GW | not reported |
| 11 | Missouri | 6 | 1 (17%) | 3 | 700 MW | 1.2 GW |
| 12 | Maryland | 4 | 1 (25%) | 2 | 2.0 GW | 150 MW |
| 13 | Alabama | 3 | 1 (33%) | 1 | not reported | not reported |
| 14 | Louisiana | 3 | 1 (33%) | 2 | 5.0 GW | 760 MW |
| 15 | Minnesota | 3 | 1 (33%) | 1 | not reported | not reported |
| 16 | New Jersey | 3 | 1 (33%) | 1 | not reported | 250 MW |
| 17 | New Mexico | 2 | 1 (50%) | 0 | 2.5 GW | not reported |
| 18 | Illinois | 13 | 0 (0%) | 4 | not reported | 3.4 GW |
| 19 | Pennsylvania | 11 | 0 (0%) | 3 | not reported | 1.4 GW |
| 20 | California | 8 | 0 (0%) | 3 | not reported | 90 MW |
| 21 | New York | 5 | 0 (0%) | 1 | not reported | not reported |
| 22 | Oregon | 5 | 0 (0%) | 2 | not reported | 84 MW |
| 23 | Nebraska | 4 | 0 (0%) | 3 | not reported | not reported |
| 24 | Nevada | 4 | 0 (0%) | 1 | not reported | 1.0 GW |
| 25 | Utah | 4 | 0 (0%) | 1 | not reported | not reported |
| 26 | North Dakota | 3 | 0 (0%) | 3 | not reported | 755 MW |
| 27 | Oklahoma | 3 | 0 (0%) | 2 | not reported | not reported |
| 28 | South Carolina | 3 | 0 (0%) | 1 | not reported | not reported |
| 29 | Idaho | 2 | 0 (0%) | 2 | not reported | not reported |
| 30 | Kentucky | 2 | 0 (0%) | 1 | not reported | 1.8 GW |
| 31 | Michigan | 2 | 0 (0%) | 2 | not reported | 1.0 GW |
| 32 | North Carolina | 2 | 0 (0%) | 0 | not reported | not reported |
| 33 | Washington | 2 | 0 (0%) | 1 | not reported | not reported |
| 34 | Wyoming | 2 | 0 (0%) | 1 | not reported | not reported |
Includes states with at least 2 satellite-tracked sites.
United States data centers with 2024 vs 2026 satellite passes
| # | Site | Operator | Location | Status | 2024 vs 2026 roof change |
|---|---|---|---|---|---|
| 1 | Vantage Frontier (Lick Mountain) | Vantage Data Centers | Albany, Texas | Under construction | Filling (+37 to +45 pts) |
| 2 | QTS Cedar Rapids | QTS Data Centers | Fairfax, Iowa | Planned | Filling (+22 to +30 pts) |
| 3 | Google Project Mica Campus | Kansas City, Missouri | Under construction | Filling (+16 to +24 pts) | |
| 4 | Meta Rosemount Data Center | Meta | Rosemount, Minnesota | Operating | Filling (+16 to +24 pts) |
| 5 | Google Mesa Redhawk Campus | Mesa, Arizona | Operating | Filling (+14 to +22 pts) | |
| 6 | Vantage TX1 | Vantage Data Centers | San Antonio, Texas | Operating | Filling (+14 to +22 pts) |
| 7 | Amazon AWS Project Rainier AI Mega-Campus | Amazon | New Carlisle, Indiana | Operating | Filling (+12 to +20 pts) |
| 8 | Amazon AWS Madison County Mega-Campus | Amazon | Canton, Mississippi | Operating | Filling (+11 to +19 pts) |
| 9 | QTS Irving | QTS Data Centers | Irving, Texas | Operating | Filling (+11 to +19 pts) |
| 10 | Google Fort Wayne Cloud Campus | Fort Wayne, Indiana | Under construction | Filling (+10 to +18 pts) | |
| 11 | Compass Datacenters: MS | Compass Datacenters | Meridian, Mississippi | Under construction | Filling (+10 to +18 pts) |
| 12 | CoreWeave Chester VA | CoreWeave | Chester, Virginia | Operating | Filling (+10 to +18 pts) |
| 13 | Meta Hyperion Campus | Meta | Rayville, Louisiana | Under construction | Filling (+9 to +17 pts) |
| 14 | Google Cedar Rapids Data Center | Cedar Rapids, Iowa | Planned | Filling (+9 to +17 pts) | |
| 15 | Project Lighthouse | Vantage Data Centers | Port Washington, Wisconsin | Under construction | Filling (+8 to +16 pts) |
| 16 | Google Midlothian Data Center | Midlothian, Texas | Operating | Filling (+8 to +16 pts) | |
| 17 | Google Morgan County / Monrovia | Monrovia, Indiana | Under construction | Filling (+8 to +16 pts) | |
| 18 | Meta Beaver Dam AI Data Center | Meta | Beaver Dam, Wisconsin | Under construction | Filling (+7 to +15 pts) |
| 19 | Google Project Zodiac Campus | Fort Wayne, Indiana | Operating | Filling (+7 to +15 pts) | |
| 20 | Meta Temple Data Center | Meta | Temple, Texas | Operating | Filling (+6 to +14 pts) |
| 21 | Meta El Paso Data Center (Project Seafox) | Meta | El Paso, Texas | Under construction | Filling (+5 to +13 pts) |
| 22 | Meta Huntsville Data Center Campus | Meta | Huntsville, Alabama | Operating | Filling (+5 to +13 pts) |
| 23 | DC Blox - ATL East Data Center | DC BLOX | Rockdale, Georgia | Under construction | Filling (+5 to +13 pts) |
| 24 | xAI Colossus Cluster 2 / Macrohard (Tulane Road) | SpaceXAI | Memphis, Tennessee | Operating | Filling (+4 to +12 pts) |
| 25 | Equinix Hampton Campus | Equinix | Hampton, Georgia | Under construction | Filling (+4 to +12 pts) |
| 26 | Microsoft Goodyear Data Center | Microsoft | Goodyear, Arizona | Operating | Filling (+3 to +11 pts) |
| 27 | Minihard | SpaceXAI | Memphis, Tennessee | Under construction | Filling (+3 to +11 pts) |
| 28 | Stargate Project Jupiter | Oracle | Santa Teresa, New Mexico | Under construction | Filling (+2 to +10 pts) |
| 29 | Meta Lebanon data center | Meta | Lebanon, Indiana | Under construction | Filling (+2 to +10 pts) |
| 30 | Meta Bowling Green | Meta | Bowling Green, Ohio | Under construction | Filling (+2 to +10 pts) |
| 31 | Nebius AI Vineland Facility | Nebius | Vineland, New Jersey | Operating | Filling (+2 to +10 pts) |
| 32 | Vantage Goodyear Campus (PHX1) | Vantage Data Centers | Goodyear, Arizona | Operating | Filling (+2 to +10 pts) |
| 33 | Cologix COL5 | Cologix | Lewis Center, Ohio | Under construction | Filling (+2 to +10 pts) |
| 34 | Corscale Gainesville Crossing Hyperscale Campus | Corscale | Gainesville, Virginia | Operating | Filling (+2 to +10 pts) |
| 35 | Quantum Frederick Project | Catellus Development Corporation | Adamstown, Maryland | Under construction | Filling (+1 to +9 pts) |
| 36 | Stargate - Milam Campus | SB Energy | Burlington, Texas | Under construction | Filling (+1 to +9 pts) |
| 37 | Riot Platforms Corsicana Mega-Campus | Riot Platforms | Corsicana, Texas | Operating | Filling (+1 to +9 pts) |
| 38 | Core Scientific / CoreWeave Denton AI Compute Hub | Core Scientific | Denton, Texas | Operating | Filling (+1 to +9 pts) |
| 39 | Lancium & Crusoe Clean AI Campus | Crusoe Energy Systems | Abilene, Texas | Operating | Little change (+1 to +9 pts) |
| 40 | QTS Manassas 1 | QTS Data Centers | Manassas, Virginia | Operating | Little change (+1 to +9 pts) |
| 41 | DC BLOX Atlanta West | DC BLOX | Lithia Springs, Georgia | Under construction | Little change (+1 to +9 pts) |
| 42 | CyrusOne DFW10 | CyrusOne | Whitney, Texas | Under construction | Little change (0 to +8 pts) |
| 43 | Bitdeer Massillon | Bitdeer Technologies Group | Massillon, Ohio | Under construction | Little change (0 to +8 pts) |
| 44 | PowerHouse Arcola Bldg B | PowerHouse Data Centers | Arcola, Virginia | Planned | Little change (0 to +8 pts) |
| 45 | Intergate Columbia | Sabey Data Centers | East Wenatchee, Washington | Planned | Little change (0 to +8 pts) |
| 46 | Google MidAmerica Mega-Campus (Pryor) | Pryor, Oklahoma | Operating | Little change (-1 to +7 pts) | |
| 47 | STACK Infrastructure NVA02 | STACK Infrastructure | Manassas, Virginia | Operating | Little change (-1 to +7 pts) |
| 48 | Amazon AWS IAD - Massaponax Church Rd | Amazon | Carters Store, Virginia | Planned | Little change (-1 to +7 pts) |
| 49 | Applied Digital Ellendale Data Center | Applied Digital | Ellendale, North Dakota | Operating | Little change (-1 to +7 pts) |
| 50 | Vantage Ashburn III | Vantage Data Centers | Ashburn, Virginia | Planned | Little change (-1 to +7 pts) |
| 51 | PowerHouse Pacific Campus | PowerHouse Data Centers | Sterling, Virginia | Under construction | Little change (-1 to +7 pts) |
| 52 | CoreWeave Kenilworth Data Center | CoreWeave | Kenilworth, New Jersey | Under construction | Little change (-1 to +7 pts) |
| 53 | Amazon AWS IAD - Wellington Glen Tech Park | Amazon | Manassas, Virginia | Planned | Little change (-1 to +7 pts) |
| 54 | Databank IAD5 - Culpeper | DataBank | Culpeper, Virginia | Under construction | Little change (-1 to +7 pts) |
| 55 | Corscale Gainesville - Bldg 3 | Corscale | Gainesville, Virginia | Under construction | Little change (-1 to +7 pts) |
| 56 | xAI Macrohardrr | SpaceXAI | Southaven, Mississippi | Under construction | Little change (-2 to +6 pts) |
| 57 | Project Spade (Google New Florence) | New Florence, Missouri | Planned | Little change (-2 to +6 pts) | |
| 58 | Amazon Ridgeland | Amazon | Ridgeland, Mississippi | Operating | Little change (-2 to +6 pts) |
| 59 | Stargate Michigan | OpenAI | Saline Township, Michigan | Under construction | Little change (-2 to +6 pts) |
| 60 | Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) | Crusoe Energy Systems | Abilene, Texas | Under construction | Little change (-2 to +6 pts) |
| 61 | Microsoft Fairwater Atlanta AI Mega-Campus | Microsoft | Fayetteville, Georgia | Operating | Little change (-2 to +6 pts) |
| 62 | Riot Platforms Rockdale Campus | Riot Platforms | Rockdale, Texas | Operating | Little change (-2 to +6 pts) |
| 63 | Google Papillion & Northwest Omaha Campuses | Papillion, Nebraska | Operating | Little change (-2 to +6 pts) | |
| 64 | Lake Mariner - CB-3, CB-4 & CB-5 | TeraWulf | Barker, New York | Operating | Little change (-2 to +6 pts) |
| 65 | Prime Phoenix Data Center Campus | Prime Data Centers | Avondale, Arizona | Under construction | Little change (-2 to +6 pts) |
| 66 | STACK Infrastructure NVA04 Campus | STACK Infrastructure | Sterling, Virginia | Operating | Little change (-2 to +6 pts) |
| 67 | DataBank IAD6 - Culpeper | DataBank | Culpeper, Virginia | Under construction | Little change (-2 to +6 pts) |
| 68 | STACK Infrastructure NVA06B | STACK Infrastructure | Leesburg, Virginia | Under construction | Little change (-2 to +6 pts) |
| 69 | Crusoe & Lancium Childress Clean AI Campus | Crusoe Energy Systems | Childress, Texas | Planned | Little change (-3 to +5 pts) |
| 70 | 75 South Data Center Campus | Industrial VI Enterprises, LLC | Georgia | Planned | Little change (-3 to +5 pts) |
| 71 | Applied Digital Delta Forge 1 (Project Lightning) | Applied Digital | Boyce, Louisiana | Under construction | Little change (-3 to +5 pts) |
| 72 | Cipher Digital Barber Lake Campus | Cipher Digital | Colorado City, Texas | Under construction | Little change (-3 to +5 pts) |
| 73 | Meta Kuna Mega-Campus | Meta | Kuna, Idaho | Operating | Little change (-3 to +5 pts) |
| 74 | STACK Infrastructure PHX01 | STACK Infrastructure | Avondale, Arizona | Operating | Little change (-3 to +5 pts) |
| 75 | Google Project Peanut | Chester, Virginia | Planned | Little change (-3 to +5 pts) | |
| 76 | 37887 Shinn Street | Valley Oak Partners | Fremont, California | Planned | Little change (-3 to +5 pts) |
| 77 | Prime Ohio Corporate Park | 5C Data Centers | Springfield, Ohio | Under construction | Little change (-3 to +5 pts) |
| 78 | CleanSpark Sandersville AI Mega-Campus | CleanSpark | Sandersville, Georgia | Under construction | Little change (-3 to +5 pts) |
| 79 | Nebius AI Flagship Campus (Independence) | Nebius | Independence / Kansas City, Missouri | Under construction | Little change (-3 to +5 pts) |
| 80 | Project Matador | Fermi America | Panhandle, Texas | Under construction | Little change (-4 to +4 pts) |
| 81 | North Creek Tech Campus | Amazon | Virginia | Planned | Little change (-4 to +4 pts) |
| 82 | AWS Hobart Data Center Campus | Amazon | Hobart, Indiana | Planned | Little change (-4 to +4 pts) |
| 83 | Hanover Technology Park | Tract | Ashland, Virginia | Planned | Little change (-4 to +4 pts) |
| 84 | Joliet Technology Center | PowerHouse Data Centers | Joliet, Illinois | Planned | Little change (-4 to +4 pts) |
| 85 | Paducah American Energy Hub | Brookfield | West Paducah, Kentucky | Planned | Little change (-4 to +4 pts) |
| 86 | Hampton Technology Park | Hampton Technology Park Owner, LLC | Hampton, Georgia | Planned | Little change (-4 to +4 pts) |
| 87 | Wilderness Crossing | Amazon | Virginia | Planned | Little change (-4 to +4 pts) |
| 88 | PAX - Pennsylvania Digital I | Carlisle Development Partners | Pennsylvania | Under construction | Little change (-4 to +4 pts) |
| 89 | CloudBurst San Marcos Data Center | CloudBurst Data Centers | San Marcos, Texas | Under construction | Little change (-4 to +4 pts) |
| 90 | Microsoft West Des Moines Cloud Cluster (Ginger & Osmium) | Microsoft | West Des Moines, Iowa | Operating | Little change (-4 to +4 pts) |
| 91 | Monarch Data Center | Copia Power | Yerington, Nevada | Planned | Little change (-4 to +4 pts) |
| 92 | Taylor Technology Campus (Project Mustang) | PowerHouse Data Centers | Taylor, Texas | Planned | Little change (-4 to +4 pts) |
| 93 | TerraWatt Riverbend Technology Center (former Alton Steel site) | TerraWatt | Alton, Illinois | Planned | Little change (-4 to +4 pts) |
| 94 | CleanArc VA1 Campus | CleanArc Data Centers | Ruther Glen, Virginia | Under construction | Little change (-4 to +4 pts) |
| 95 | Galaxy Helios Data Center | Galaxy Digital | Afton, Texas | Operating | Little change (-4 to +4 pts) |
| 96 | Project Big Pine | Potentia | New Boston, Texas | Planned | Little change (-4 to +4 pts) |
| 97 | Vantage Millersport Campus | Vantage Data Centers | Fairfield, Ohio | Under construction | Little change (-4 to +4 pts) |
| 98 | IREN Childress AI Hub (Horizon 1-4) | IREN (Iris Energy) | Childress, Texas | Operating | Little change (-4 to +4 pts) |
| 99 | CyrusOne - Talkington Township Campus | CyrusOne | Talkington Township, Illinois | Planned | Little change (-4 to +4 pts) |
| 100 | Nixon Technology Center | Augusta Economic Development Authority | Augusta, Georgia | Planned | Little change (-4 to +4 pts) |
| 101 | Aligned LBB Campus | Aligned Data Centers | Abernathy, Texas | Under construction | Little change (-4 to +4 pts) |
| 102 | Canoochee River RV Resort - Data Center Project | Canoochee River RV Resort, LLC | Metter, Georgia | Planned | Little change (-4 to +4 pts) |
| 103 | Meta Montgomery | Meta | Montgomery, Alabama | Operating | Little change (-4 to +4 pts) |
| 104 | Project Fighting Pike | Critical Data House | Williston, North Dakota | Planned | Little change (-4 to +4 pts) |
| 105 | Meta Sarpy County Data Center Campus | Meta | Papillion, Nebraska | Operating | Little change (-4 to +4 pts) |
| 106 | Meta Kansas City data center | Meta | Kansas City, Missouri | Operating | Little change (-4 to +4 pts) |
| 107 | CyrusOne DFW - Fairfield | CyrusOne | Fairfield, Texas | Under construction | Little change (-4 to +4 pts) |
| 108 | QTS Richmond 3 | QTS Data Centers | Sandston, Virginia | Operating | Little change (-4 to +4 pts) |
| 109 | Hut 8 River Bend Campus | Hut 8 | West Feliciana Parish, Louisiana | Under construction | Little change (-4 to +4 pts) |
| 110 | Novva Data Centers Mesa Campus | Novva Data Centers | Mesa, Arizona | Under construction | Little change (-4 to +4 pts) |
| 111 | Polaris Forge 2 Campus | Applied Digital | Harwood, North Dakota | Under construction | Little change (-4 to +4 pts) |
| 112 | Google Bristow | Bristow, Virginia | Operating | Little change (-4 to +4 pts) | |
| 113 | QTS Richmond 2 | QTS Data Centers | Sandston, Virginia | Operating | Little change (-4 to +4 pts) |
| 114 | Meta Cheyenne | Meta | Cheyenne, Wyoming | Operating | Little change (-4 to +4 pts) |
| 115 | Ulysses | Cipher Digital | Piketon, Ohio | Planned | Little change (-4 to +4 pts) |
| 116 | CyrusOne Mesa | CyrusOne | Mesa, Arizona | Planned | Little change (-4 to +4 pts) |
| 117 | PHX1-PHX8 (Phoenix) | CyrusOne | Chandler, Arizona | Operating | Little change (-4 to +4 pts) |
| 118 | Meta Aiken | Meta | Trenton, South Carolina | Operating | Little change (-4 to +4 pts) |
| 119 | 1500 Woodlawn Drive | Security Land and Development | Baltimore, Maryland | Planned | Little change (-4 to +4 pts) |
| 120 | Silicon Valley SJC35 | Digital Realty | Santa Clara, California | Operating | Little change (-4 to +4 pts) |
Showing top 120 of 290 tracked sites; browse all facilities on the sites directory.
SEC filings, annual reports and financing disclosures for tracked United States operators
| # | Operator & disclosure | Type | Publisher | Date | Filing |
|---|---|---|---|---|---|
| 1 | Vantage Data Centers: Vantage Data Centers Completes $9.2 Billion Equity Investment Led by DigitalBridge and Silver Lake Details $9.2B in upsized equity investment led by DigitalBridge and Silver Lake alongside €1.5B from AustralianSuper across 35+ hyperscale campuses totaling >2.6 GW in North America (Ashburn. | 8-K / Earnings Release | Vantage Data Centers | 2025-06-12 | Open filing |
| 2 | QTS Data Centers: QTS Data Centers (Blackstone BREIT / BPP) Global Hyperscale Portfolio & 3+ GW Pipeline Report Covers QTS's $25B+ leased development pipeline across Northern Virginia (Manassas, Ashburn), Phoenix (Glendale, Tempe), Atlanta (Fayeteville, Suwanee), Dallas-Fort Worth (Fort Worth, Irving), New. | Annual Report | QTS Data Centers / Blackstone | 2025-07-23 | Open filing |
| 3 | Google: Alphabet Inc. 8-K 2026-11-05: Other Events (8.01) On November 5, 2026, Alphabet Inc. closed its public offering of €6 billion aggregate principal amount of euro-denominated senior notes. The principal executive offices of Alphabet Inc. are located. | 8-K | Alphabet (SEC 8-K) | 2026-11-05 | Open filing |
| 4 | Google: Google Form 10-Q (Q3 2026) Google Form 10-Q (Q3 2026) reports Revenue: USD 127.58bn (Q3 2026); Operating income: USD 40.58bn (Q3 2026); Net income: USD 26.47bn (Q3 2026); Property and equipment, net: USD 372.83bn (at. | 10-Q | Google (SEC EDGAR) | 2026-09-30 | Open filing |
| 5 | Google: Google Form 424B2, filed 2026-11-04 | 424B2 | Google (SEC EDGAR) | 2026-11-04 | Open filing |
| 6 | Meta: Meta Platforms, Inc. 8-K 2026-11-12: Other Events (8.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | Meta Platforms (SEC 8-K) | 2026-11-12 | Open filing |
| 7 | Meta: Meta Platforms, Inc. 8-K 2026-11-05: Other Events (8.01) Meta Platforms, Inc. reported its principal executive offices at 1 Meta Way, Menlo Park, California 94025. The company completed an offering of various USD Notes and engaged in related agreements. | 8-K | Meta Platforms (SEC 8-K) | 2026-11-05 | Open filing |
| 8 | Meta: Meta Platforms, Inc. 8-K 2026-10-29: Material Definitive Agreement (1.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | Meta Platforms (SEC 8-K) | 2026-10-29 | Open filing |
| 9 | Amazon: Amazon Form 10-Q (Q3 2026) Amazon Form 10-Q (Q3 2026) reports Revenue: USD 201.94bn (Q3 2026); Operating income: USD 28.08bn (Q3 2026); Net income: USD 20.68bn (Q3 2026); Capital expenditure: USD 77.26bn (Q3 2026); Property. | 10-Q | Amazon (SEC EDGAR) | 2026-09-30 | Open filing |
| 10 | Amazon: Amazon Form 8-K, filed 2026-10-29 | 8-K | Amazon (SEC EDGAR) | 2026-10-29 | Open filing |
| 11 | Amazon: Amazon Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-10-29 | Open filing |
| 12 | Compass Datacenters: Compass Datacenters (Brookfield Infrastructure & Ontario Teachers') $5.5B Modular Campus Report Covers Compass Datacenters' multi-hundred-megawatt hyperscale campuses in Red Oak and Waxahachie (Dallas-Fort Worth, Texas), Leesburg and Prince William County (Northern Virginia), Goodyear. | Annual Report | Compass Datacenters / Brookfield | 2025-06-20 | Open filing |
| 13 | CoreWeave: CoreWeave Form 8-K, filed 2026-11-10 CoreWeave, Inc. reported its third quarter 2026 financial results, showing record revenue and expanding margins from Livingston, N.J. The company raised its full year 2026 revenue guidance and. | 8-K | CoreWeave (SEC EDGAR) | 2026-11-10 | Open filing |
| 14 | CoreWeave: CoreWeave Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-11-11 | Open filing |
| 15 | CoreWeave: CoreWeave Expands Global AI Cloud and Network Backbone | Filing | 2026-10-27 | Open filing | |
| 16 | DC BLOX: DC BLOX $1.15B Green Loan & Southeastern US Hyperscale Edge Data Center Footprint Report Discloses $1.15B in senior secured green credit facilities and equity backing from Bain Capital and Post Road Group to build out hyperscale and edge colocation campuses across Atlanta (Conyers. | 8-K / Earnings Release | DC BLOX / Bain Capital | 2025-05-15 | Open filing |
| 17 | SpaceXAI: SpaceX: SPACE EXPLORATION TECHNOLOGIES CORP 8-K 2026-10-26: Other Events (8.01) Emerging growth company ¨ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | SpaceX (SEC 8-K) | 2026-10-26 | Open filing |
| 18 | SpaceXAI: SpaceXAI Discloses $6.1M Stormwater Permit Exposure at Mississippi AI Campus | Filing | 2026-10-24 | Open filing | |
| 19 | SpaceXAI: SpaceXAI Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-10-21 | Open filing |
| 20 | Equinix: EQUINIX INC 8-K 2026-11-09: Other Events (8.01) On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150%. | 8-K | Equinix (SEC 8-K) | 2026-11-09 | Open filing |
| 21 | Equinix: Equinix Form 8-K, filed 2026-10-28 Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for. | 8-K | Equinix (SEC EDGAR) | 2026-10-28 | Open filing |
| 22 | Equinix: Equinix Form 10-Q (2026-10-28) Equinix Form 10-Q (2026-10-28) reports Revenue: USD 2.57bn (Q3 2026); Net income: USD 489.0m (Q3 2026). | 10-Q | Equinix (SEC EDGAR) | 2026-09-30 | Open filing |
| 23 | Microsoft: MICROSOFT CORP 8-K 2026-11-04: Other Events (8.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | Microsoft (SEC 8-K) | 2026-11-04 | Open filing |
| 24 | Microsoft: Microsoft Form 8-K, filed 2026-10-28 Additional information regarding our non-GAAP definition is provided below. All growth comparisons relate to the corresponding period in the last fiscal year. | 8-K | Microsoft (SEC EDGAR) | 2026-10-28 | Open filing |
| 25 | Microsoft: Microsoft Form 10-Q (Q1 FY2027) Microsoft Form 10-Q (Q1 FY2027) reports Revenue: USD 92.28bn (Q3 2026); Operating income: USD 45.91bn (Q3 2026); Net income: USD 36.63bn (Q3 2026); Capital expenditure: USD 39.37bn (Q3 2026). | 10-Q | Microsoft (SEC EDGAR) | 2026-09-30 | Open filing |
| 26 | Nebius: Nebius Form 6-K, filed 2026-11-12 This filing is a Nebius Group N.V. Report on Form 6-K containing an operating and financial review for the three and nine months ended September 30, 2025 and 2026. It describes Nebius as a global AI. | 6-K | Nebius (SEC EDGAR) | 2026-11-12 | Open filing |
| 27 | Nebius: Nebius Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-11-12 | Open filing |
| 28 | Nebius: Nebius Form 6-K, filed 2026-11-12 | 6-K | Nebius (SEC EDGAR) | 2026-11-12 | Open filing |
| 29 | Cologix: Cologix (Stonepeak Infrastructure) $1.5B Equity & ABS Financing & 45+ North American Interconnection Sites Report Details Cologix's 45+ carrier-hotel interconnection and Scalelogix hyperscale edge facilities across Columbus (8+ sites, 200+ MW), Ashburn, Dallas, Silicon Valley, New Jersey, Minneapolis, Montreal. | Annual Report | Cologix / Stonepeak | 2025-05-25 | Open filing |
| 30 | Cologix: Cologix data centers page (read 2026-11-09 04:50 UTC) | Filing | Cologix (company website) | Open filing | |
| 31 | Corscale: Corscale Data Centers (Patrizia Infrastructure) Gainesville Crossing & Hyperscale Campus Report Details Corscale's 300+ MW Gainesville Crossing hyperscale data center campus in Prince William County, Northern Virginia, alongside pipeline developments in Dallas-Fort Worth and Phoenix. | Annual Report | Corscale / Patrizia | 2025-05-01 | Open filing |
| 32 | Riot Platforms: Riot Platforms Form 8-K for an event on 2026-10-29, filed 2026-11-04 Riot Platforms, Inc. executed a 15-year, 910 critical IT MW triple-net powered land lease at Corsicana with a leading Frontier AI Lab, representing approximately $28 billion in total contract value. | 8-K | Riot Platforms (SEC EDGAR) | 2026-10-29 | Open filing |
| 33 | Riot Platforms: Riot Platforms Form 8-K, filed 2026-08-10 Exhibit 99.1 Riot Platforms Reports Second Quarter 2026 Financial Results and Strategic Highlights Executed 20-year data center lease with a leading frontier AI lab for 191 MW of critical IT. | 8-K | Riot Platforms (SEC EDGAR) | 2026-08-10 | Open filing |
| 34 | Riot Platforms: Riot Platforms, Inc. (NASDAQ: RIOT) FY 2024 Form 10-K Annual Report (Rockdale 700MW & Corsicana 1GW Campuses) Details Riot's 700 MW Rockdale Facility and 1,000 MW (1.0 GW) Corsicana Facility in Navarro County, Texas (with 400 MW operational and 600 MW substation expansion undergoing formal AI/HPC hyperscale. | 10-K | SEC EDGAR | 2025-02-28 | Open filing |
| 35 | Core Scientific: Core Scientific Form 8-K, filed 2026-11-05 (exhibit q3fy26earningsdeckvfinal.htm) Core Scientific, Inc. reported that its colocation revenue increased nearly 60% sequentially to $215.4 million in the third quarter of 2026. The company operates facilities across Alabama, Georgia. | 8-K | Core Scientific (SEC EDGAR) | 2026-11-05 | Open filing |
| 36 | Core Scientific: Core Scientific, Inc./tx 8-K 2026-09-10: Regulation FD Disclosure (7.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | Core Scientific (SEC 8-K) | 2026-09-10 | Open filing |
| 37 | Core Scientific: Core Scientific, Inc./tx 8-K 2026-08-14: Regulation FD Disclosure (7.01); Other Events (8.01) Core Scientific, Inc. completed its acquisition of Polaris DS LLC for approximately $444 million in cash, securing about 440 megawatts of gross, grid-connected power capacity in Oklahoma. This. | 8-K | Core Scientific (SEC 8-K) | 2026-08-14 | Open filing |
| 38 | Crusoe Energy Systems: Crusoe Energy Systems & Blue Owl $15B Abilene Texas Lancium Clean Campus AI Data Center Report Details the 1.2 GW Abilene, Texas Lancium Clean Campus (Phase 1 200 MW + Phase 2 1,000 MW across 8 buildings backed by $15B in project debt and equity with Blue Owl and Primary Digital. | 8-K / Earnings Release | Crusoe / Blue Owl / Primary Digital | 2025-05-22 | Open filing |
| 39 | CyrusOne: CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio Report Details CyrusOne's 55+ operational and under-development hyperscale data centers across North America (Northern Virginia, Dallas-Fort Worth, Phoenix, San Antonio, Chicago, Aurora), Europe (Frankfurt. | Annual Report | CyrusOne / KKR / GIP | 2025-06-10 | Open filing |
| 40 | Bitdeer Technologies Group: Bitdeer Technologies Group Form 6-K, filed 2026-11-16 | 6-K | Bitdeer Technologies Group (SEC EDGAR) | 2026-11-16 | Open filing |
| 41 | Bitdeer Technologies Group: Bitdeer Technologies Group Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-11-11 | Open filing |
| 42 | Bitdeer Technologies Group: Bitdeer Technologies Group Form 6-K, filed 2026-11-10 | 6-K | Bitdeer Technologies Group (SEC EDGAR) | 2026-11-10 | Open filing |
| 43 | PowerHouse Data Centers: PowerHouse Data Centers (American Real Estate Partners) Northern Virginia, Reno & Dallas Campus Report Covers PowerHouse Data Centers' 30+ building hyperscale powered-shell and turnkey developments across Ashburn, Arcola, and Spotsylvania (Virginia), Reno (Nevada), Irving (Texas), and Charlotte. | Annual Report | PowerHouse Data Centers / AREP | 2025-05-12 | Open filing |
| 44 | Sabey Data Centers: Sabey Data Centers (Sabey Corp. & National Real Estate Advisors) Hydro-Powered Portfolio Report Details Sabey Data Centers' >450 MW Intergate portfolio across Central Washington (Intergate.Quincy, Intergate.Columbia in East Wenatchee), Seattle (Intergate.Seattle), Ashburn (Intergate.Ashburn). | Annual Report | Sabey Data Centers | 2025-05-15 | Open filing |
| 45 | STACK Infrastructure: STACK Infrastructure (Blue Owl / IPI Partners) Global 4+ GW Hyperscale Campus Report Details STACK Infrastructure's multi-gigawatt operational and development footprint across Americas (Northern Virginia, Portland/Hillsboro, Phoenix, Dallas, Silicon Valley, Chicago, New Albany. | Annual Report | STACK Infrastructure / Blue Owl | 2025-07-01 | Open filing |
| 46 | Applied Digital: CoreWeave Ellendale ND - SEC 8-k filing # SEC 8-k filing Primary Source URL: https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm Publisher: US Securities and Exchange Commission Referenced Frontier Data Center. | 8-K | US Securities and Exchange Commission | 2026-10-19 | Open filing |
| 47 | Applied Digital: Applied Digital Corp. 8-K 2026-10-07: Results of Operations (2.02) Applied Digital Corporation reported fiscal first quarter 2027 results, including revenues of $341.9 million and a net loss attributable to common stockholders of $221.0 million. The data center. | 8-K | Applied Digital (SEC 8-K) | 2026-10-07 | Open filing |
| 48 | Applied Digital: Applied Digital 10-Q 2026-10-07 Applied Digital reported $262.6M of HPC Hosting Business revenue and $37.8M of Data Center Hosting revenue for the three months ended August 31, 2026. Its Polaris Forge 1 campus (Ellendale, ND). | 10-Q | Applied Digital (SEC EDGAR) | 2026-08-31 | Open filing |
| 49 | DataBank: DataBank $2.0B Equity Financing (AustralianSuper & DigitalBridge) & 65+ US Data Center Footprint Report Discloses $2.0B in new equity capital led by AustralianSuper and DigitalBridge plus $1.1B+ in securitized debt to fund 850+ MW of hyperscale and edge colocation developments across Atlanta (Lithia. | 8-K / Earnings Release | DataBank / DigitalBridge | 2025-10-08 | Open filing |
| 50 | DataBank: DataBank website, home page (read 2026-11-09 04:50 UTC) | Filing | DataBank (company website) | 2022-04-12 | Open filing |
| 51 | OpenAI: Campus Chip Deployment: OpenAI Stargate UAE | Filing | Epoch AI / SemiAnalysis | 2026-10-19 | Open filing |
| 52 | OpenAI: OpenAI Stargate Abilene - announcement | Filing | Crusoe Energy Official | 2026-10-19 | Open filing |
| 53 | OpenAI: Multi-Datacenter Training: OpenAI's Ambitious Plan To Beat Google's Infrastructure | Filing | SemiAnalysis Datacenter Research | 2026-10-19 | Open filing |
| 54 | TeraWulf: TeraWulf Form 8-K, filed 2026-11-06 (exhibit terawulfq32026investorpr.htm) TeraWulf Inc. reported its third quarter 2026 results, showing $76.2 million in total revenue, which included $63.0 million of HPC lease revenue. The company executed a 20-year lease with Anthropic. | 8-K | TeraWulf (SEC EDGAR) | 2026-11-06 | Open filing |
| 55 | TeraWulf: TERAWULF INC. 8-K 2026-11-04: Material Definitive Agreement (1.01); Regulation FD Disclosure (7.01); Other Events (8.01) TeraWulf Inc. secured Google credit support for project financing tied to $19 billion of contracted Anthropic lease commitments at its Justified Data Campus in Hawesville, Kentucky. The company also. | 8-K | TeraWulf (SEC 8-K) | 2026-11-04 | Open filing |
| 56 | TeraWulf: TERAWULF INC. 8-K 2026-10-05: Other Events (8.01) TeraWulf Inc. expanded the contracted power capacity at its Muskie Data Campus in eastern Kentucky from 500 megawatts to 1 gigawatt through an amended agreement with Kentucky Power. The amendment. | 8-K | TeraWulf (SEC 8-K) | 2026-10-05 | Open filing |
| 57 | Prime Data Centers: Prime Data Centers (Macquarie & Snowhawk) Global Hyperscale Wholesale Campus Report Covers Prime Data Centers' wholesale hyperscale campuses across Chicago (Elk Grove Village 175 MW), Phoenix (Avondale), Sacramento (McClellan Park), Silicon Valley (Santa Clara), Los Angeles. | Annual Report | Prime Data Centers | 2025-05-10 | Open filing |
| 58 | Cipher Digital: Cipher Digital 8-K 2026-10-14 Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-14 (2026, United States): | 8-K | Cipher Digital (SEC EDGAR) | 2026-10-14 | Open filing |
| 59 | Cipher Digital: Cipher Digital 8-K 2026-10-13 Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-13 (2026, United States): | 8-K | Cipher Digital (SEC EDGAR) | 2026-10-13 | Open filing |
| 60 | Cipher Digital: Cipher Digital 8-K 2026-10-16 Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-16 (2026, United States): | 8-K | Cipher Digital (SEC EDGAR) | 2026-10-13 | Open filing |
| 61 | 5C Data Centers: 5C Data Centers North American AI & Hyperscale Colocation Infrastructure Report Details 5C Data Centers' high-density liquid-cooled AI and hyperscale colocation campuses across Columbus (Ohio), Dallas-Fort Worth (Texas), Phoenix (Arizona), and Atlanta (Georgia). | Annual Report | 5C Data Centers | 2025-05-18 | Open filing |
| 62 | CleanSpark: CleanSpark Form 8-K, filed 2026-09-17 Sandersville Investor Presentation S e p t e m b e r 2 0 2 6 2 Legal Disclaimer This presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform. | 8-K | CleanSpark (SEC EDGAR) | 2026-09-17 | Open filing |
| 63 | CleanSpark: CleanSpark Form 8-K, filed 2026-08-06 EXHIBIT 99.1 CleanSpark Reports Third Fiscal Quarter 2026 Results Signed 20-year $6.6 billion triple-net lease at Sandersville with high investment-grade tenant Ordered and pre-paid all long-lead. | 8-K | CleanSpark (SEC EDGAR) | 2026-08-06 | Open filing |
| 64 | CleanSpark: CleanSpark Form 8-K, filed 2026-09-25 | 8-K | CleanSpark (SEC EDGAR) | 2026-09-25 | Open filing |
| 65 | Tract: Tract Capital Master-Planned Gigawatt Data Center Land & Power Parks Portfolio Report Details Tract's 23,000+ acre portfolio of zoned, utility-served gigawatt data center parks across Reno (Storey County, Nevada), Buckeye (Maricopa County, Arizona), Eagle Mountain (Utah), Caldwell. | Annual Report | Tract Capital | 2025-06-10 | Open filing |
| 66 | Galaxy Digital: Galaxy Digital Form 8-K, filed 2026-10-27 Galaxy Digital Inc. reported its third quarter 2026 financial results, highlighting a growing contribution from its Data Centers business and the expansion of its data center footprint to over 5.7. | 8-K | Galaxy Digital (SEC EDGAR) | 2026-10-27 | Open filing |
| 67 | Galaxy Digital: Galaxy Digital Form 8-K, filed 2026-08-05 In this press release, a reference to "Galaxy," "we," "our" and similar words refers to GDI, its subsidiaries and affiliates, and, prior to the Reorganization Transactions, refers to Galaxy Digital. | 8-K | Galaxy Digital (SEC EDGAR) | 2026-08-05 | Open filing |
| 68 | Galaxy Digital: Galaxy Digital Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-10-27 | Open filing |
| 69 | IREN (Iris Energy): IREN Ltd 8-K 2026-11-05: Results of Operations (2.02) IREN reported financial results for the three months ended September 30, 2026, including total revenue of $228 million and AI Cloud revenue of $200 million. The company secured over 30,000 acres of. | 8-K | IREN (SEC 8-K) | 2026-11-05 | Open filing |
| 70 | IREN (Iris Energy): IREN (Iris Energy) Q1 2027 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-11-06 | Open filing |
| 71 | IREN (Iris Energy): IREN (Iris Energy) Form DEF 14A for the meeting on 2026-11-24, filed 2026-10-13 | DEF 14A | IREN (Iris Energy) (SEC EDGAR) | 2026-10-13 | Open filing |
| 72 | Aligned Data Centers: Aligned Data Centers (Macquarie Asset Management) $12B Equity & Debt Financing & 5+ GW Pipeline Report Discloses $5B in primary equity led by Macquarie Asset Management and $7B+ in debt commitments to expand over 5 GW of operational and planned capacity featuring Delta3 air and DeltaFlow liquid. | 8-K / Earnings Release | Aligned Data Centers / Macquarie | 2025-01-15 | Open filing |
| 73 | Hut 8: Hut 8 Form 8-K, filed 2026-11-04 Hut 8 Corp. reported its third quarter 2026 financial results, highlighting the commercialization of its Beacon Point AI data center campus and the advancement of 1,300 MW of energy capacity to. | 8-K | Hut 8 (SEC EDGAR) | 2026-11-04 | Open filing |
| 74 | Hut 8: Hut 8 Form 8-K, filed 2026-08-04 Exhibit 99.1 Hut 8 Reports Second Quarter 2026 Results Power-first execution model compounds across the Company’s first two AI data center campuses 949 MW of contracted IT capacity, approximately. | 8-K | Hut 8 (SEC EDGAR) | 2026-08-04 | Open filing |
| 75 | Hut 8: Hut 8 Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-11-04 | Open filing |
| 76 | Digital Realty: DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01) In connection with Digital Realty Trust, Inc.’s (the “Company”) previously-disclosed acquisition on October 19, 2026 of approximately 16% of the interests in the company’s Teraco joint venture. | 8-K | Digital Realty (SEC 8-K) | 2026-10-30 | Open filing |
| 77 | Digital Realty: Digital Realty Form 8-K, filed 2026-10-29 Digital Realty Trust, Inc. owns, acquires, develops, and operates data centers through its operating partnership subsidiary, Digital Realty Trust, L.P. As of September 30, 2026, the company's 311. | 8-K | Digital Realty (SEC EDGAR) | 2026-10-29 | Open filing |
| 78 | Digital Realty: Digital Realty Form 8-K, filed 2026-07-23 The company is focused on providing data center, colocation, and interconnection solutions for domestic and international customers across a variety of industry verticals ranging from cloud and. | 8-K | Digital Realty (SEC EDGAR) | 2026-07-23 | Open filing |
| 79 | CloudHQ: CloudHQ Global Hyperscale Data Center Campus Portfolio & Multi-Billion Project Financing Report Discloses CloudHQ's hyperscale campus developments across Northern Virginia (Manassas, Ashburn, Culpeper), Mount Prospect (Chicago, Illinois), Chaska (Minnesota), Offenbach (Frankfurt), Didcot. | Annual Report | CloudHQ | 2025-06-05 | Open filing |
| 80 | EdgeCore: EdgeCore Digital Infrastructure (Partners Group) $4.2B Financing & 1+ GW Hyperscale Campus Report Discloses over $4.2B in equity and green debt financing led by Partners Group across EdgeCore's 300+ MW Mesa (Phoenix), Culpeper and Ashburn (Virginia), Reno (Tahoe-Reno Industrial Center), Santa. | Annual Report | EdgeCore / Partners Group | 2025-06-12 | Open filing |
| 81 | MARA Holdings: MARA Holdings, Inc. 8-K 2026-11-17: Other Events (8.01) MARA Holdings' subsidiary MARA USA priced a $185 million offering of 8.750% Senior Secured Notes due 2032, issued by Long Ridge Energy LLC, at 99.000% of principal. The proceeds are tied to MARA. | 8-K | MARA Holdings (SEC 8-K) | 2026-11-17 | Open filing |
| 82 | MARA Holdings: MARA Holdings Form 8-K, filed 2026-11-09 (exhibit q32026earningsannouncement.htm) Net income increased to $632.1 million IN Q3 2026 from $123.1 million in Q3 2025 . Adjusted EBITDA increased to $857.7 million IN Q3 2026 compared to $395.6 million in Q3 2025 . | 8-K | MARA Holdings (SEC EDGAR) | 2026-11-09 | Open filing |
| 83 | MARA Holdings: MARA Holdings, Inc. 8-K 2026-09-25: Material Definitive Agreement (1.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | MARA Holdings (SEC 8-K) | 2026-09-25 | Open filing |
| 84 | Prologis: Prologis Form 10-Q (Q3 2026) Prologis (Prologis Form 10-Q (Q3 2026)) reported in its financial statements: Capex: $1,626,921 USD (thousands) (9M 2026), Gross Revenue: $2,387,518 USD (Q3 2026), Debt Amount: $8.2 USD (Q3 2026). | 10-Q | Prologis (SEC EDGAR) | 2026-09-30 | Open filing |
| 85 | Prologis: Prologis Form 10-K (FY 2025) Prologis Form 10-K (FY 2025) reports Net income: USD 3.57bn (FY 2025). | 10-K | Prologis (SEC EDGAR) | 2025-12-31 | Open filing |
| 86 | Prologis: Prologis Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-10-16 | Open filing |
| 87 | Switch: Switch, Inc. (DigitalBridge & IFM Investors) Tier 5 Prime Campus & 100% Renewable Power Report Details Switch's five North American Prime hyperscale campus ecosystems: The Core Campus (Las Vegas, Nevada), The Citadel Campus (Tahoe Reno, Nevada), The Rock Campus (Austin and Round Rock, Texas). | Annual Report | Switch / DigitalBridge | 2025-05-20 | Open filing |
| 88 | Yondr Group: Yondr Group (DigitalBridge & La Caisse) Global Hyperscale Campus Portfolio (Slough, Frankfurt, Johor, Loudoun) Covers Yondr Group's 1+ GW hyperscale development portfolio across London Slough (100 MW campus across 3 buildings), Frankfurt (40 MW Bischofsheim), Johor Sedenak Tech Park (300 MW campus backed by. | Annual Report | Yondr Group / DigitalBridge | 2025-07-10 | Open filing |
| 89 | AVAIO Digital Partners: AVAIO Digital Partners $3B+ North American & European Sustainable Data Center Campus Report Covers AVAIO Digital's multi-gigawatt sustainable hyperscale data center development campuses across Brandon (Mississippi, $6B Project Chili), Appomattox (Virginia, 300 MW), Little Rock (Arkansas). | Annual Report | AVAIO Digital Partners | 2025-05-20 | Open filing |
| 90 | Skybox Datacenters: Skybox Datacenters & Prologis $4B+ Powered Shell & Turnkey Hyperscale Development Report Covers Skybox Datacenters' joint venture with Prologis and Bandera Ventures developing multi-hundred-megawatt campuses in Dallas-Fort Worth (Legacy, Lancaster, Plano), Austin (Hutto, Pflugerville). | Annual Report | Skybox Datacenters / Prologis | 2025-06-05 | Open filing |
| 91 | T5: T5 Data Centers North American Hyperscale Turnkey & Facility Management Portfolio Report Covers T5 Data Centers' owned and operated campuses across Chicago (T5@Chicago and Grayslake), Atlanta (T5@Atlanta, Augusta), Charlotte (T5@Kings Mountain), Dallas (T5@Dallas Plano), Minneapolis. | Annual Report | T5 Data Centers | 2025-05-14 | Open filing |
| 92 | Stream Data Centers: Stream Data Centers (Apollo Global Management) 4+ GW Hyperscale Campus Development Report Discloses Stream Data Centers' >4 GW hyperscale development platform (acquired by Apollo-managed funds) spanning Phoenix (Goodyear), Chicago (Elk Grove), Dallas-Fort Worth (Garland, Wilmer), San. | Annual Report | Stream Data Centers / Apollo | 2025-06-15 | Open filing |
| 93 | EdgeConneX: EdgeConneX (EQT Infrastructure) 2025 Sustainability & 50+ Global Market Capacity Report Reports EdgeConneX operating and developing 80+ data centers across 50+ global markets in North America (Phoenix, Hillsboro, Ashburn, Atlanta, Chicago, New Albany), Europe (Amsterdam, Brussels. | Annual Report | EdgeConneX / EQT Infrastructure | 2025-06-18 | Open filing |
| 94 | EdgeConneX: EdgeConneX website, home page (read 2026-11-09 04:50 UTC) | Filing | EdgeConneX (company website) | 2019-12-11 | Open filing |
| 95 | Flexential: Flexential website, home page (read 2026-11-19 07:39 UTC) | Filing | Flexential (company website) | Open filing | |
| 96 | Flexential: Flexential Corp. US$2.1B ABS Data Center Securitization and GI Partners / Morgan Stanley Portfolio Report Details Flexential asset-backed notes securitization and 42-facility U.S. colocation footprint (350+ MW across Hillsboro Oregon, Atlanta, Dallas, Denver, Charlotte, Tampa, and Salt Lake City). | ABS Filing | Flexential / GI Partners | 2025-09-12 | Open filing |
| 97 | Centersquare: Brookfield Infrastructure Partners (NYSE: BIP) SEC Form 20-F: Centersquare (Evoque + Cyxtera) 70-Site Portfolio Details Brookfield Infrastructure combination of Evoque Data Center Solutions and Cyxtera Technologies into Centersquare, operating 70+ North American and European data centers with over 400 MW of. | 20-F | SEC EDGAR / Brookfield Infrastructure Partners | 2026-03-14 | Open filing |
| 98 | H5 Data Centers: H5 Data Centers 22-Market US Carrier Hotel & Edge Colocation Portfolio Report Details H5 Data Centers' 4M+ sq ft US colocation and interconnection portfolio across Ashburn, Atlanta, Charlotte, Cincinnati, Cleveland, Colorado Springs, Denver, Phoenix, Quincy, San Antonio, San. | Annual Report | H5 Data Centers | 2025-04-20 | Open filing |
Full market dataset & site-level records
Open the interactive 2024 vs 2026 satellite slider for 290 United States data centers
Inspect before-and-after 10 m satellite imagery side by side, exact parcel coordinates, and every sourced filing.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
What does the 2024 vs 2026 satellite tracker measure?
It compares clear 10 m satellite passes from 2024 against 2025 to 2026 passes for each mapped data center campus. Sites where roofed share rose by more than 5 percentage points are labeled filling; others with clear passes are labeled little change.
How many United States data centers have 2024 vs 2026 satellite comparisons?
As of 19 November 2026, 290 published United States data centers carry 2024 vs 2026 satellite pass comparisons (38 filling since 2024, 130 little change).
Why are exact roof percentages not published?
Real Assets publishes the percentage-point change range and the 2024 to 2026 direction so buyers can separate active buildout from announcements without republishing raw derived coverage levels. The interactive before-and-after curtain slider is inside the workspace.