Meta Hyperion Campus:data center in Rayville, Louisiana.

Meta Hyperion Campus is an under construction data center in Rayville, Louisiana, listed under Meta. Planned capacity is 5 GW according to Epoch AI Frontier Data Centers. Real Assets links 32 source pages, including Meta Data Centers Official, Epoch AI Frontier Data Centers, Drive Official Source.

Open this site on the map Start a 7-day trial
5 GWplanned capacity
Under constructionstatus
32source pages linked
2030 (phased; 1.5GW by 2027; full 5GW by 2030)expected completion

Facts on record

  • OperatorMeta
  • City and stateRayville, Louisiana
  • Statusunder construction
  • Planned capacity5 GW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land area1,295 hectares (about 3,200 acres)
  • Building floor areaNot recorded
  • Expected completion2030 (phased; 1.5GW by 2027; full 5GW by 2030)
  • Sources linked32 from 5 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 4 data centers in Louisiana that have a page.

Meta has 29 data centers on record in the United States: 23 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

32 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

Meta data centers in other states

Other data centers in Louisiana

Full market dataset & site-level records

Open Meta Hyperion Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Meta Hyperion Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Meta Hyperion Campus?

Meta Hyperion Campus is recorded under Meta. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Meta Hyperion Campus?

In Rayville, Louisiana. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Meta Hyperion Campus have?

5 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 32 linked pages by Meta Data Centers Official, Epoch AI Frontier Data Centers, Drive Official Source, Engineering Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.