Vantage Millersport Campus:data center in Fairfield, Ohio.

Vantage Millersport Campus is an under construction data center in Fairfield, Ohio, listed under Vantage Data Centers. Planned capacity is 800 MW according to Data Center Dynamics. Real Assets links 3 source pages, including Data Center Dynamics, NBC4 WCMH-TV.

Open this site on the map Start a 7-day trial
800 MWplanned capacity
Under constructionstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorVantage Data Centers
  • City and stateFairfield, Ohio
  • Statusunder construction
  • Planned capacity800 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. Vantage Millersport Campus is one of them.

Vantage Data Centers has 24 data centers on record in the United States: 11 operating and 13 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Vantage Data Centers data centers in Ohio

Vantage Data Centers data centers in other states

Other data centers in Ohio

Full market dataset & site-level records

Open Vantage Millersport Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Vantage Millersport Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Vantage Millersport Campus?

Vantage Millersport Campus is recorded under Vantage Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Vantage Millersport Campus?

In Fairfield, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Vantage Millersport Campus have?

800 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Data Center Dynamics, NBC4 WCMH-TV. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.