Bitdeer Clarington is a planned data center in Clarington, Ohio, listed under Bitdeer Technologies Group. Planned capacity is 570 MW according to TheEnergyMag. Real Assets links 2 source pages, including Motley Fool earnings call transcript via Yahoo Finance, TheEnergyMag.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. Bitdeer Clarington is one of them.
Bitdeer Technologies Group has 3 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Bitdeer Clarington on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Bitdeer Clarington is recorded under Bitdeer Technologies Group. The operator is the name its sources give, which can differ from the owner or the tenant.
In Clarington, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
570 MW, as stated by TheEnergyMag. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 2 linked pages by Motley Fool earnings call transcript via Yahoo Finance, TheEnergyMag. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.