Cologix Johnstown Campus:data center in Johnstown, Ohio.

Cologix Johnstown Campus is a planned data center in Johnstown, Ohio, listed under Cologix. Planned capacity is 800 MW according to Cologix. Real Assets links 2 source pages, including Cologix, Data Center Dynamics.

Open this site on the map Start a 7-day trial
800 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCologix
  • City and stateJohnstown, Ohio
  • Statusplanned
  • Planned capacity800 MW, as stated by Cologix
  • Operating capacity todayNot recorded
  • Land area62.3 hectares (about 154 acres)
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. Cologix Johnstown Campus is one of them.

Cologix has 4 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Cologix data centers in Ohio

Other data centers in Ohio

Full market dataset & site-level records

Open Cologix Johnstown Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Cologix Johnstown Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Cologix Johnstown Campus?

Cologix Johnstown Campus is recorded under Cologix. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Cologix Johnstown Campus?

In Johnstown, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Cologix Johnstown Campus have?

800 MW, as stated by Cologix. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Cologix, Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.