← United States data centers · Cologix (4) · Ohio (41)
Live market record, the source behind every published figure
Cologix in Ohio:4 data center sites.
As of 30 October 2026, Real Assets tracks 4 data center sites listed under Cologix in Ohio: 0 operating and 2 planned or under construction. Reported power capacity in Ohio: 920 MW not yet operating. Ohio accounts for 100% of Cologix's 4 tracked sites in the United States, and Cologix accounts for 10% of the 41 tracked sites in Ohio.
Unlock all 4 Cologix sites in Ohio0 operating · 2 planned · 10% of Ohio
- 100% of Cologix in United States
- #3 in Ohio
Mapped Cologix sites in Ohio (highlighted) against all Ohio sites
Cologix across United States
Top operators in Ohio
Cologix in Ohio: 4 data centers with their own page
- Cologix Johnstown Campus
Johnstown, planned800 MW - Cologix COL5
Lewis Center, under construction120 MW - Cologix (COL7)
New Albany, not recorded36 MW - Cologix (COL8)
New Albany, not recorded21 MW
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Cologix: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Cologix, with disclosed capital expenditure, lease commitments and capacity figures.
- Cologix (Stonepeak Infrastructure) $1.5B Equity & ABS Financing & 45+ North American Interconnection Sites Report (Annual Report · 2025 · filed 25 May 2025)
Details Cologix's 45+ carrier-hotel interconnection and Scalelogix hyperscale edge facilities across Columbus (8+ sites, 200+ MW), Ashburn, Dallas, Silicon Valley, New Jersey, Minneapolis, Montreal, Toronto, and Vancouver.Annual Report ↗ - Unlock all Cologix filings and extracted figures →
Full market dataset & site-level records
Unlock all 4 Cologix data center sites in Ohio
Inspect every Cologix facility in Ohio on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 14:06 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Cologix have in Ohio?
4 tracked as of 30 October 2026: 0 operating and 2 planned or under construction. That is 100% of Cologix's 4 tracked sites in the United States.
How much power capacity does Cologix have in Ohio?
Reported power capacity in Ohio: 920 MW not yet operating.
How does Cologix rank among data center operators in Ohio?
Cologix ranks number 3 in Ohio by sites tracked, with 4 of the 41 sites recorded in Ohio (10%).
Where else does Cologix operate in the United States?
Cologix has 4 tracked sites across the United States: Ohio (4).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data