← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
CyrusOne DFW10:data center in Whitney, Texas.
CyrusOne DFW10 is an under construction data center in Whitney, Texas, listed under CyrusOne. Planned capacity is 400 MW according to Data Center Dynamics. 2024 to 2026 satellite: little change (0 to +8 pts). Real Assets links 5 source pages, including Data Center Dynamics, Calpine Corporation.
Open this site on the map View the full site recordunder construction data center · 5 linked sources
- CyrusOne
- Whitney
- Texas
Approximate position and Texas peer sites (the exact position needs sign-in)
Facts on record
- OperatorCyrusOne
- City and stateWhitney, Texas
- Statusunder construction
- Planned capacity400 MW, as stated by Data Center Dynamics
- Expected completion2026
- 2024 vs 2026 satelliteLittle roof change, (0 to +8 pts, 2024 to 2026), 1 January 2024 to 16 November 2026
- Sources linked5 from 2 publishers
- Record updated18 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 12 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Texas has 245 data centers on record in Real Assets, with 5.19 GW reported as operating and 75.92 GW not yet operating. CyrusOne DFW10 is one of them.
CyrusOne has 57 data centers on record in the United States: 42 operating and 15 planned or under construction. See CyrusOne in Texas (22 sites). Compare Digital Realty vs CyrusOne.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- CyrusOne tops out latest Texas data center
Data Center Dynamics, datacenterdynamics.com, published 9 March 2026Web page - Calpine and CyrusOne Announce Thad Hill Energy Center Powered Land to Support Hyperscale Data Center Development in Texas
Calpine Corporation, calpine.com, published 30 July 2025Web page - 3 additional source filings & extracted fact citations for CyrusOne DFW10
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
5 sources on record; 2 shown above and 3 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (1 January 2024 to 16 November 2026), CyrusOne DFW10 shows little change in roofed area with a roofed-share shift of 0 to +8 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
More CyrusOne data centers in Texas
- CyrusOne DFW - Fairfield
Fairfield, Texas, under construction380 MW - CyrusOne DFW7
Fort Worth, Texas, under construction70 MW - CyrusOne Fort Worth
Fort Worth, Texas, under construction70 MW - Allen, TX, DFW3-DFW5
Allen, Texas, operatingNot recorded - AUS2 (Austin)
Austin, Texas, operatingNot recorded - AUS3 (Austin)
Austin, Texas, operatingNot recorded
CyrusOne data centers in other states
- CyrusOne - Talkington Township Campus
Talkington Township, Illinois, planned600 MW - CyrusOne Mesa
Mesa, Arizona, planned198 MW - PHX1-PHX8 (Phoenix)
Chandler, Arizona, operating169 MW - CHI1 (Chicago)
Chicago, Illinois, operating140 MW - Ameresco NAS Lemoore Data Center
Kings, California, planned100 MW - CyrusOne NVA4
Sterling, Virginia, operating11 MW
Other data centers in Texas
- Project Matador
Panhandle, Texas, under construction17 GW - GridFree AI South Dallas One
Dallas, Texas, planned5 GW - Sailfish Comanche Circle
Tolar, Texas, planned5 GW - Prometheus Pecos Project
Pecos, Texas, planned2.5 GW - Amp Energy East Texas
Lufkin, Texas, planned2.1 GW - IREN Sweetwater Mega-Hub (Sweetwater 1 & 2)
Sweetwater, Texas, under construction2 GW
Full site dossier & United States dataset
Open CyrusOne DFW10 and 1,276 other data centers
This page is the public summary for CyrusOne DFW10 in Whitney, Texas. Sign in to see its full record: 5 source pages and 12 sourced figures.
- CyrusOne DFW10 on the interactive map, with the sites around it
- All 5 linked source pages
- 12 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates CyrusOne DFW10?
CyrusOne DFW10 is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is CyrusOne DFW10?
In Whitney, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does CyrusOne DFW10 have?
400 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is CyrusOne DFW10 under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (1 January 2024 to 16 November 2026), CyrusOne DFW10 shows little change in roofed area with a roofed-share shift of 0 to +8 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 5 linked pages by Data Center Dynamics, Calpine Corporation. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.