← United States data centers · All operators · All states
Live market record, the source behind every published figure
CyrusOne:64 data center sites in United States.
As of 8 November 2026, Real Assets tracks 64 data center sites listed under CyrusOne in the United States: 48 operating and 16 planned or under construction. Reported power capacity: 320 MW operating, 2.0 GW not yet operating. It ranks number 5 by sites among 171 named operators, with 5% of the 1,396 sites tracked. Largest states: Texas (23), Virginia (10), Illinois (7).
Unlock all 64 CyrusOne sites48 operating · 16 planned or under construction · #5 operator
- Texas (23)
- Virginia (10)
- Illinois (7)
- Ohio (5)
Mapped CyrusOne footprint in United States (site-level details require sign-in)
Where CyrusOne is
Largest operators in United States
- Digital Realty118
- Equinix108
- DataBank92
- CyrusOne64
- Unlock 167 more operators & full table →
CyrusOne: 58 data centers with their own page
- CyrusOne - Talkington Township Campus
Talkington Township, Illinois600 MW - CyrusOne DFW - Fairfield
Fairfield, Texas380 MW - CyrusOne
Mesa, Arizona198 MW - CyrusOne Bosque County Campus (DFW10)
Whitney, Texas190 MW - PHX1-PHX8 (Phoenix)
Chandler, Arizona169 MW - CHI1 (Chicago)
Chicago, Illinois140 MW - Ameresco NAS Lemoore Data Center
Kings, California100 MW - CyrusOne DFW7
Tarrant, Texas70 MW - CyrusOne Fort Worth
Fort Worth, Texas70 MW - Sterling, VA, NVA4
Sterling, Virginia11 MW
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded. All 1,304 sites
Locked operator portfolio & primary filings
View all 64 CyrusOne data center sites, government permit PDFs & MW timeline - enter work email
Unlock the complete CyrusOne footprint in the United States (48 operating, 16 planned): exact parcel coordinates, phase-by-phase MW schedules, M&A/lease deals, and primary source PDFs.
CyrusOne by state
Regional breakdown pages where CyrusOne has at least 3 tracked data center sites.
Compare CyrusOne side by side
Head-to-head footprint, operating vs planned sites, and regional overlap comparisons in the United States.
CyrusOne: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for CyrusOne, with disclosed capital expenditure, lease commitments and capacity figures.
- CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio Report (Annual Report · 2025 · filed 10 June 2025)
Details CyrusOne's 55+ operational and under-development hyperscale data centers across North America (Northern Virginia, Dallas-Fort Worth, Phoenix, San Antonio, Chicago, Aurora), Europe (Frankfurt FRA1-FRA7, London, Amsterdam, Madrid, Milan), and Japan (Osaka OSK1), supported by $9.7B in green warehouse and ABS debt facilities.Annual Report ↗ - Unlock all CyrusOne filings and extracted figures →
Full market dataset & site-level records
Unlock all 64 CyrusOne data center sites in the United States
This page previews CyrusOne's top footprint. Sign in or start a trial to inspect all 64 individual CyrusOne facilities, site-by-site capacity, status, and source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 8 November 2026; this page was built on 8 November 2026 at 11:59 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does CyrusOne have in the United States?
64 tracked as of 8 November 2026: 48 operating and 16 planned or under construction. This is what we have recorded, not a full census.
Where are CyrusOne's data center sites?
Largest states by sites: Texas (23), Virginia (10), Illinois (7), Ohio (5), Arizona (4).
How much power capacity does CyrusOne have?
Reported power capacity: 320 MW operating, 2.0 GW not yet operating.
How does CyrusOne compare with other data center operators?
It ranks number 5 of the 65 largest named operators by sites tracked. The largest is Digital Realty with 118.
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data