← United States data centers · CyrusOne (64) · Arizona (35)
Live market record, the source behind every published figure
CyrusOne in Arizona:4 data center sites.
As of 30 October 2026, Real Assets tracks 4 data center sites listed under CyrusOne in Arizona: 3 operating and 1 planned or under construction. Reported power capacity in Arizona: 198 MW not yet operating. Arizona accounts for 6% of CyrusOne's 64 tracked sites in the United States, and CyrusOne accounts for 11% of the 35 tracked sites in Arizona.
Unlock all 4 CyrusOne sites in Arizona3 operating · 1 planned · 11% of Arizona
- 6% of CyrusOne in United States
- #1 in Arizona
Mapped CyrusOne sites in Arizona (highlighted) against all Arizona sites
CyrusOne across United States
Top operators in Arizona
CyrusOne in Arizona: 4 data centers with their own page
- CyrusOne
Mesa, planned198 MW - Chandler, AZ, PHX1-PHX8
Chandler, operatingNot recorded - CyrusOne Chandler Campus
Chandler, operatingNot recorded - PHX1-PHX8 (Phoenix)
Phoenix, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
CyrusOne: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for CyrusOne, with disclosed capital expenditure, lease commitments and capacity figures.
- CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio Report (Annual Report · 2025 · filed 10 June 2025)
Details CyrusOne's 55+ operational and under-development hyperscale data centers across North America (Northern Virginia, Dallas-Fort Worth, Phoenix, San Antonio, Chicago, Aurora), Europe (Frankfurt FRA1-FRA7, London, Amsterdam, Madrid, Milan), and Japan (Osaka OSK1), supported by $9.7B in green warehouse and ABS debt facilities.Annual Report ↗ - Unlock all CyrusOne filings and extracted figures →
Full market dataset & site-level records
Unlock all 4 CyrusOne data center sites in Arizona
Inspect every CyrusOne facility in Arizona on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 14:06 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does CyrusOne have in Arizona?
4 tracked as of 30 October 2026: 3 operating and 1 planned or under construction. That is 6% of CyrusOne's 64 tracked sites in the United States.
How much power capacity does CyrusOne have in Arizona?
Reported power capacity in Arizona: 198 MW not yet operating.
How does CyrusOne rank among data center operators in Arizona?
CyrusOne ranks number 1 in Arizona by sites tracked, with 4 of the 35 sites recorded in Arizona (11%).
Where else does CyrusOne operate in the United States?
CyrusOne has 64 tracked sites across the United States: Texas (23), Virginia (10), Illinois (7), Ohio (5), Arizona (4).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data