AnalystAIReal Assets Start free trial

← United States data centers · All sites · Arizona

Sourced site record, every fact links to its page

CyrusOne:data center in Mesa, Arizona.

CyrusOne is a planned data center in Mesa, Arizona, listed under CyrusOne. Planned capacity is 198 MW according to Area Development. Real Assets links 3 source pages, including Area Development, DatacenterDynamics.

Open this site on the map Start a 7-day trial
198 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCyrusOne
  • City and stateMesa, Arizona
  • Statusplanned
  • Planned capacity198 MW, as stated by Area Development
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Arizona has 33 data centers on record in Real Assets, with 1.79 GW reported as operating and 7.87 GW not yet operating. CyrusOne is one of them.

CyrusOne has 65 data centers on record in the United States: 49 operating and 16 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More CyrusOne data centers in Arizona

CyrusOne data centers in other states

Other data centers in Arizona

Full market dataset & site-level records

Open CyrusOne and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see CyrusOne on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates CyrusOne?

CyrusOne is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CyrusOne?

In Mesa, Arizona. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CyrusOne have?

198 MW, as stated by Area Development. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Area Development, DatacenterDynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.