AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas

Sourced site record, every fact links to its page

CyrusOne DFW10:data center in Bosque, Texas.

CyrusOne DFW10 is an under construction data center in Bosque, Texas, listed under CyrusOne. Planned capacity is 400 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics, Calpine Corporation.

Open this site on the map Start a 7-day trial
400 MWplanned capacity
Under constructionstatus
2source pages linked
2026expected completion

Facts on record

  • OperatorCyrusOne
  • City and stateBosque, Texas
  • Statusunder construction
  • Planned capacity400 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completion2026
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. CyrusOne DFW10 is one of them.

CyrusOne has 65 data centers on record in the United States: 49 operating and 16 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More CyrusOne data centers in Texas

CyrusOne data centers in other states

Other data centers in Texas

Full market dataset & site-level records

Open CyrusOne DFW10 and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see CyrusOne DFW10 on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates CyrusOne DFW10?

CyrusOne DFW10 is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CyrusOne DFW10?

In Bosque, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CyrusOne DFW10 have?

400 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Data Center Dynamics, Calpine Corporation. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.