AnalystAIReal Assets
Start free trial← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
IREN Sweetwater Mega-Hub (Sweetwater 1 & 2) is an under construction data center in Sweetwater / Nolan County, Texas, listed under IREN (Iris Energy). Planned capacity is 2 GW according to IREN. Real Assets links 2 source pages, including IREN.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. IREN Sweetwater Mega-Hub (Sweetwater 1 & 2) is one of them.
IREN (Iris Energy) has 5 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see IREN Sweetwater Mega-Hub (Sweetwater 1 & 2) on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
IREN Sweetwater Mega-Hub (Sweetwater 1 & 2) is recorded under IREN (Iris Energy). The operator is the name its sources give, which can differ from the owner or the tenant.
In Sweetwater / Nolan County, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
2 GW, as stated by IREN. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 2 linked pages by IREN. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.