AnalystAIReal Assets Start free trial

← United States data centers · All comparisons · All operators · Equinix (108) · CyrusOne (61)

Head-to-head operator comparison, sourced from primary filings

Equinix vs CyrusOne:108 vs 61 data center sites.

As of 11 November 2026, Real Assets tracks 108 data center sites under Equinix (88 operating, 20 planned) vs 61 under CyrusOne (45 operating, 16 planned) in the United States. Reported power capacity: Equinix has 240 MW planned, while CyrusOne has 320 MW operating, 2.0 GW planned. Both operators overlap in 7 states, led by Texas (10 vs 23), Virginia (23 vs 9), California (23 vs 2).

Unlock all 169 Equinix & CyrusOne sites
Equinix vs CyrusOneUnited States data center
108 vs 61

#2 vs #5 by sites tracked · 88 vs 45 operating

  • Equinix: 108 sites
  • CyrusOne: 61 sites
  • 7 shared states
🔒Site names, capacity & coordinates locked · Unlock both footprints

Mapped Equinix and CyrusOne site positions in United States (exact coordinates require sign-in)

Instant code or 1-click sign-in:
108 vs 61sites tracked (#2 vs #5)
88 vs 45operating sites
20 vs 16planned or under construction
7shared states (13 vs 13 active)

Equinix vs CyrusOne: side-by-side summary

Head-to-head comparison of Equinix and CyrusOne across the United States as of 11 November 2026.
#MetricEquinixCyrusOne
1Rank by sites tracked in United States#2 of 174#5 of 174
2Total sites tracked108 (8% of market)61 (4% of market)
3Operating sites8845
4Planned or under construction2016
5Power capacity operatingnot reported320 MW
6Power capacity planned240 MW2.0 GW
7Active states1313
8Largest stateCalifornia (23)Texas (23)

Footprint by state: Equinix vs CyrusOne

States in the United States where Equinix or CyrusOne has tracked data center sites.
#StateEquinix sitesCyrusOne sitesCombined
1Texas102333
2Virginia23932
3California23225
4Illinois12719
5Georgia11011
6New Jersey8210
7Florida505
8Washington415
9Ohio055
10New York314
11Arizona044
12Colorado303
13Massachusetts303
14North Carolina033
15Pennsylvania202

Equinix & CyrusOne: SEC filings, annual reports and disclosed figures

Primary regulatory filings and annual reports on record for Equinix and CyrusOne.

  • EQUINIX INC 8-K 2026-11-09: Other Events (8.01) (8-K · filed 9 November 2026)
    On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150% Senior Notes due 2028, €700,000,000 of 4.800% Senior Notes due 2033, €500,000,000 of 5.100% Senior Notes due 2035, and €650,000,000 of 5.450% Senior Notes due 2038. E
    8-K ↗
  • Equinix Form 8-K, filed 2026-10-28 (8-K · filed 28 October 2026)
    Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for the quarter reached $2.571 billion, while net income attributable to common stockholders came in at $489 million, or $4.93 per share. For the full year of 2026, t
    8-K ↗
  • Equinix Form 10-Q (2026-10-28) (10-Q · filed 30 September 2026)
    Equinix (Equinix Form 10-Q (2026-10-28)) reported in its financial statements: Gross Revenue: $ 2,571 USD (millions) (Q3 2026), Ebitda: $600 USD (millions) (Q3 2026), Net Income: $489 USD (millions) (Q3 2026).
    10-Q ↗
  • Equinix Form 8-K, Item 2.02: second quarter 2026 results (8-K / Earnings Release · Q2 2026 · filed 29 July 2026)
    Equinix Q2 2026 Form 8-K (Item 2.02): Reports Q2 2026 revenue of $2.625 billion (up 16%), adjusted EBITDA of $1.396 billion (53% margin), AFFO of $1.168 billion, $424 million of annualized gross bookings, 9,700 net interconnections added, 52 major projects underway across 33 markets, and FY 2026 guided capital expenditures of $5.000 to $6.000 billion.
    8-K / Earnings Release ↗
  • Equinix Form 10-Q (2026-07-29) (10-Q · filed 30 June 2026)
    Equinix (Equinix Form 10-Q (2026-07-29)) reported in its financial statements: Gross Revenue: $ 2,625 USD (millions) (Q2 2026), Ebitda: $665 USD (millions) (Q2 2026), Net Income: $477 USD (millions) (Q2 2026).
    10-Q ↗
  • Equinix Form 10-Q for quarter ended 2026-03-31 (10-Q · 2026-03-31 · filed 29 April 2026)
    Equinix Q1 2026 Form 10-Q: Reports 281 data centers across 77 markets globally (including 23 xScale hyperscale data centers), Q1 2026 revenue of $2.444 billion, adjusted EBITDA of $1.245 billion, AFFO of $1.065 billion, $1.256 billion in Q1 capital expenditures ($705 million Americas, $329 million EMEA, $222 million Asia-Pacific), and $22.08 billion in total debt principal outstanding.
    10-Q ↗
  • CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio Report (Annual Report · 2025 · filed 10 June 2025)
    Details CyrusOne's 55+ operational and under-development hyperscale data centers across North America (Northern Virginia, Dallas-Fort Worth, Phoenix, San Antonio, Chicago, Aurora), Europe (Frankfurt FRA1-FRA7, London, Amsterdam, Madrid, Milan), and Japan (Osaka OSK1), supported by $9.7B in green warehouse and ABS debt facilities.
    Annual Report ↗
  • Unlock all Equinix and CyrusOne filings and extracted figures →

Cite or link to this benchmark

Analysts, journalists, and investor relations teams can reference this Equinix vs CyrusOne benchmark using the citation or HTML attribution link below.

Plain-text citation:

Equinix (108 sites: 88 operating, 20 planned) vs CyrusOne (61 sites: 45 operating, 16 planned) in the United States, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/us-data-centers/compare/equinix-vs-cyrusone)

HTML attribution link:

<a href="https://realassets.analystai.ai/us-data-centers/compare/equinix-vs-cyrusone">Equinix vs CyrusOne: United States data center benchmark (Real Assets)</a>

Full market dataset & site-level records

Unlock all 169 Equinix and CyrusOne data center sites in the United States

Compare every Equinix (108 sites) and CyrusOne (61 sites) facility on the interactive map with site-level capacity, status, and primary source filings.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

How this data is built

Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

How this data is built and what a source line means

Questions

How many data center sites does Equinix have compared with CyrusOne in the United States?

As of 11 November 2026, Equinix has 108 tracked sites (88 operating and 20 planned or under construction, ranked #2), compared with 61 for CyrusOne (45 operating and 16 planned or under construction, ranked #5).

Where do Equinix and CyrusOne overlap in the United States?

Equinix and CyrusOne both have tracked sites in 7 states: Texas (10 vs 23), Virginia (23 vs 9), California (23 vs 2), Illinois (12 vs 7), New Jersey (8 vs 2).

How does reported power capacity compare between Equinix and CyrusOne?

Reported power capacity: Equinix has 240 MW planned, while CyrusOne has 320 MW operating, 2.0 GW planned.

Where does the comparison data come from?

Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.

See every site, operator and source

This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.

Open the data centers data