← United States data centers · All comparisons · All operators · Equinix (108) · DataBank (91)
Head-to-head operator comparison, sourced from primary filings
Equinix vs DataBank:108 vs 91 data center sites.
As of 11 November 2026, Real Assets tracks 108 data center sites under Equinix (88 operating, 20 planned) vs 91 under DataBank (72 operating, 19 planned) in the United States. Reported power capacity: Equinix has 240 MW planned, while DataBank has 133 MW operating, 2.1 GW planned. Both operators overlap in 9 states, led by Texas (10 vs 25), California (23 vs 8), Virginia (23 vs 6).
Unlock all 199 Equinix & DataBank sites#2 vs #3 by sites tracked · 88 vs 72 operating
- Equinix: 108 sites
- DataBank: 91 sites
- 9 shared states
Mapped Equinix and DataBank site positions in United States (exact coordinates require sign-in)
Equinix vs DataBank: side-by-side summary
| # | Metric | Equinix | DataBank |
|---|---|---|---|
| 1 | Rank by sites tracked in United States | #2 of 174 | #3 of 174 |
| 2 | Total sites tracked | 108 (8% of market) | 91 (6% of market) |
| 3 | Operating sites | 88 | 72 |
| 4 | Planned or under construction | 20 | 19 |
| 5 | Power capacity operating | not reported | 133 MW |
| 6 | Power capacity planned | 240 MW | 2.1 GW |
| 7 | Active states | 13 | 15 |
| 8 | Largest state | California (23) | Texas (25) |
Footprint by state: Equinix vs DataBank
| # | State | Equinix sites | DataBank sites | Combined |
|---|---|---|---|---|
| 1 | Texas | 10 | 25 | 35 |
| 2 | California | 23 | 8 | 31 |
| 3 | Virginia | 23 | 6 | 29 |
| 4 | Georgia | 11 | 8 | 19 |
| 5 | Illinois | 12 | 4 | 16 |
| 6 | New Jersey | 8 | 2 | 10 |
| 7 | Colorado | 3 | 5 | 8 |
| 8 | New York | 3 | 4 | 7 |
| 9 | Utah | 0 | 6 | 6 |
| 10 | Florida | 5 | 0 | 5 |
| 11 | Pennsylvania | 2 | 3 | 5 |
| 12 | Minnesota | 0 | 5 | 5 |
| 13 | Washington | 4 | 0 | 4 |
| 14 | Massachusetts | 3 | 0 | 3 |
| 15 | Kansas | 0 | 3 | 3 |
Equinix & DataBank: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Equinix and DataBank.
- EQUINIX INC 8-K 2026-11-09: Other Events (8.01) (8-K · filed 9 November 2026)
On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150% Senior Notes due 2028, €700,000,000 of 4.800% Senior Notes due 2033, €500,000,000 of 5.100% Senior Notes due 2035, and €650,000,000 of 5.450% Senior Notes due 2038. E8-K ↗ - Equinix Form 8-K, filed 2026-10-28 (8-K · filed 28 October 2026)
Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for the quarter reached $2.571 billion, while net income attributable to common stockholders came in at $489 million, or $4.93 per share. For the full year of 2026, t8-K ↗ - Equinix Form 10-Q (2026-10-28) (10-Q · filed 30 September 2026)
Equinix (Equinix Form 10-Q (2026-10-28)) reported in its financial statements: Gross Revenue: $ 2,571 USD (millions) (Q3 2026), Ebitda: $600 USD (millions) (Q3 2026), Net Income: $489 USD (millions) (Q3 2026).10-Q ↗ - Equinix Form 8-K, Item 2.02: second quarter 2026 results (8-K / Earnings Release · Q2 2026 · filed 29 July 2026)
Equinix Q2 2026 Form 8-K (Item 2.02): Reports Q2 2026 revenue of $2.625 billion (up 16%), adjusted EBITDA of $1.396 billion (53% margin), AFFO of $1.168 billion, $424 million of annualized gross bookings, 9,700 net interconnections added, 52 major projects underway across 33 markets, and FY 2026 guided capital expenditures of $5.000 to $6.000 billion.8-K / Earnings Release ↗ - Equinix Form 10-Q (2026-07-29) (10-Q · filed 30 June 2026)
Equinix (Equinix Form 10-Q (2026-07-29)) reported in its financial statements: Gross Revenue: $ 2,625 USD (millions) (Q2 2026), Ebitda: $665 USD (millions) (Q2 2026), Net Income: $477 USD (millions) (Q2 2026).10-Q ↗ - Equinix Form 10-Q for quarter ended 2026-03-31 (10-Q · 2026-03-31 · filed 29 April 2026)
Equinix Q1 2026 Form 10-Q: Reports 281 data centers across 77 markets globally (including 23 xScale hyperscale data centers), Q1 2026 revenue of $2.444 billion, adjusted EBITDA of $1.245 billion, AFFO of $1.065 billion, $1.256 billion in Q1 capital expenditures ($705 million Americas, $329 million EMEA, $222 million Asia-Pacific), and $22.08 billion in total debt principal outstanding.10-Q ↗ - DataBank $2.0B Equity Financing (AustralianSuper & DigitalBridge) & 65+ US Data Center Footprint Report (8-K / Earnings Release · 2025 · filed 8 October 2025)
Discloses $2.0B in new equity capital led by AustralianSuper and DigitalBridge plus $1.1B+ in securitized debt to fund 850+ MW of hyperscale and edge colocation developments across Atlanta (Lithia Springs, South Fulton), Culpeper (Red Cloud), Dallas (Plano), Salt Lake City (Bluffdale), and New York/New Jersey (Orangeburg).8-K / Earnings Release ↗ - DataBank website, home page (read 2026-11-09 04:50 UTC) (Filing · filed 12 April 2022)Filing ↗
- Unlock all Equinix and DataBank filings and extracted figures →
More operator comparisons in United States
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this Equinix vs DataBank benchmark using the citation or HTML attribution link below.
Plain-text citation:
Equinix (108 sites: 88 operating, 20 planned) vs DataBank (91 sites: 72 operating, 19 planned) in the United States, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/us-data-centers/compare/equinix-vs-databank)
HTML attribution link:
<a href="https://realassets.analystai.ai/us-data-centers/compare/equinix-vs-databank">Equinix vs DataBank: United States data center benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 199 Equinix and DataBank data center sites in the United States
Compare every Equinix (108 sites) and DataBank (91 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Equinix have compared with DataBank in the United States?
As of 11 November 2026, Equinix has 108 tracked sites (88 operating and 20 planned or under construction, ranked #2), compared with 91 for DataBank (72 operating and 19 planned or under construction, ranked #3).
Where do Equinix and DataBank overlap in the United States?
Equinix and DataBank both have tracked sites in 9 states: Texas (10 vs 25), California (23 vs 8), Virginia (23 vs 6), Georgia (11 vs 8), Illinois (12 vs 4).
How does reported power capacity compare between Equinix and DataBank?
Reported power capacity: Equinix has 240 MW planned, while DataBank has 133 MW operating, 2.1 GW planned.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data