← United States data centers · All comparisons · All operators · Digital Realty (119) · Equinix (108)
Head-to-head operator comparison, sourced from primary filings
Digital Realty vs Equinix:119 vs 108 data center sites.
As of 11 November 2026, Real Assets tracks 119 data center sites under Digital Realty (113 operating, 6 planned) vs 108 under Equinix (88 operating, 20 planned) in the United States. Reported power capacity: Digital Realty has 950 MW operating, 1.8 GW planned, while Equinix has 240 MW planned. Both operators overlap in 9 states, led by Virginia (34 vs 23), California (20 vs 23), Texas (22 vs 10).
Unlock all 227 Digital Realty & Equinix sites#1 vs #2 by sites tracked · 113 vs 88 operating
- Digital Realty: 119 sites
- Equinix: 108 sites
- 9 shared states
Mapped Digital Realty and Equinix site positions in United States (exact coordinates require sign-in)
Digital Realty vs Equinix: side-by-side summary
| # | Metric | Digital Realty | Equinix |
|---|---|---|---|
| 1 | Rank by sites tracked in United States | #1 of 174 | #2 of 174 |
| 2 | Total sites tracked | 119 (8% of market) | 108 (8% of market) |
| 3 | Operating sites | 113 | 88 |
| 4 | Planned or under construction | 6 | 20 |
| 5 | Power capacity operating | 950 MW | not reported |
| 6 | Power capacity planned | 1.8 GW | 240 MW |
| 7 | Active states | 15 | 13 |
| 8 | Largest state | Virginia (34) | California (23) |
Footprint by state: Digital Realty vs Equinix
| # | State | Digital Realty sites | Equinix sites | Combined |
|---|---|---|---|---|
| 1 | Virginia | 34 | 23 | 57 |
| 2 | California | 20 | 23 | 43 |
| 3 | Texas | 22 | 10 | 32 |
| 4 | Illinois | 10 | 12 | 22 |
| 5 | Georgia | 5 | 11 | 16 |
| 6 | New Jersey | 6 | 8 | 14 |
| 7 | Massachusetts | 4 | 3 | 7 |
| 8 | New York | 3 | 3 | 6 |
| 9 | Florida | 1 | 5 | 6 |
| 10 | Arizona | 4 | 0 | 4 |
| 11 | Washington | 0 | 4 | 4 |
| 12 | North Carolina | 3 | 0 | 3 |
| 13 | Oregon | 3 | 0 | 3 |
| 14 | Colorado | 0 | 3 | 3 |
| 15 | Pennsylvania | 0 | 2 | 2 |
Digital Realty & Equinix: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Digital Realty and Equinix.
- DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01) (8-K · filed 30 October 2026)
In connection with Digital Realty Trust, Inc.’s (the “Company”) previously-disclosed acquisition on October 19, 2026 of approximately 16% of the interests in the company’s Teraco joint venture, pursuant to a put right exercised by certain of the joint venture’s third party partners, the Company is...8-K ↗ - Digital Realty Form 8-K, filed 2026-10-29 (8-K · filed 29 October 2026)
Digital Realty Trust, Inc. owns, acquires, develops, and operates data centers through its operating partnership subsidiary, Digital Realty Trust, L.P. As of September 30, 2026, the company's 311 data centers contain applications and operations critical to customer operations. The portfolio includes approximately 3.2 gigawatts of IT capacity, along with appr8-K ↗ - Digital Realty Form 8-K, filed 2026-07-23 (8-K · filed 23 July 2026)
The company is focused on providing data center, colocation, and interconnection solutions for domestic and international customers across a variety of industry verticals ranging from cloud and information technology services, communications and social networking to financial services...8-K ↗ - Digital Realty Form 10-Q (2026-07-31) (10-Q · filed 30 June 2026)
Digital Realty (Digital Realty Form 10-Q (2026-07-31)) reported in its financial statements: Portfolio Value: $ 32,857,401 USD (thousands) (2026-06-30), Gross Revenue: $ 1,924,040 USD (thousands) (Q2 2026), Debt Amount: $709,756 USD (thousands) (2026-06-30), Ebitda: $467,245 USD (thousands) (Q2 2026), Net Income: $457,607 USD (thousands) (Q2 2026).10-Q ↗ - Digital Realty Form 8-K, filed 2026-06-22 (8-K · filed 22 June 2026)
Digital Realty Form 8-K: Announces acquisition of the 1,440-acre Astra Enterprise Park development site near Charlotte, North Carolina, supporting up to 2 GW of potential data center capacity.8-K ↗ - Digital Realty to buy Blackstone blended 64% interest in Digital Carver Dulles 9 and Brickyard JVs (three Northern Virginia hyperscale data centers) (8-K · 2026 · filed 29 June 2026)
Digital Realty Form 8-K (June 29, 2026): Agrees to acquire Blackstone's blended 64% interest in four hyperscale data center campuses across Frankfurt, Paris, and Northern Virginia for approximately $1.55 billion, spanning 10 facilities with 413 MW of planned IT load (234 MW operating and 179 MW under construction or planned).8-K ↗ - EQUINIX INC 8-K 2026-11-09: Other Events (8.01) (8-K · filed 9 November 2026)
On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150% Senior Notes due 2028, €700,000,000 of 4.800% Senior Notes due 2033, €500,000,000 of 5.100% Senior Notes due 2035, and €650,000,000 of 5.450% Senior Notes due 2038. E8-K ↗ - Equinix Form 8-K, filed 2026-10-28 (8-K · filed 28 October 2026)
Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for the quarter reached $2.571 billion, while net income attributable to common stockholders came in at $489 million, or $4.93 per share. For the full year of 2026, t8-K ↗ - Equinix Form 10-Q (2026-10-28) (10-Q · filed 30 September 2026)
Equinix (Equinix Form 10-Q (2026-10-28)) reported in its financial statements: Gross Revenue: $ 2,571 USD (millions) (Q3 2026), Ebitda: $600 USD (millions) (Q3 2026), Net Income: $489 USD (millions) (Q3 2026).10-Q ↗ - Equinix Form 8-K, Item 2.02: second quarter 2026 results (8-K / Earnings Release · Q2 2026 · filed 29 July 2026)
Equinix Q2 2026 Form 8-K (Item 2.02): Reports Q2 2026 revenue of $2.625 billion (up 16%), adjusted EBITDA of $1.396 billion (53% margin), AFFO of $1.168 billion, $424 million of annualized gross bookings, 9,700 net interconnections added, 52 major projects underway across 33 markets, and FY 2026 guided capital expenditures of $5.000 to $6.000 billion.8-K / Earnings Release ↗ - Equinix Form 10-Q (2026-07-29) (10-Q · filed 30 June 2026)
Equinix (Equinix Form 10-Q (2026-07-29)) reported in its financial statements: Gross Revenue: $ 2,625 USD (millions) (Q2 2026), Ebitda: $665 USD (millions) (Q2 2026), Net Income: $477 USD (millions) (Q2 2026).10-Q ↗ - Equinix Form 10-Q for quarter ended 2026-03-31 (10-Q · 2026-03-31 · filed 29 April 2026)
Equinix Q1 2026 Form 10-Q: Reports 281 data centers across 77 markets globally (including 23 xScale hyperscale data centers), Q1 2026 revenue of $2.444 billion, adjusted EBITDA of $1.245 billion, AFFO of $1.065 billion, $1.256 billion in Q1 capital expenditures ($705 million Americas, $329 million EMEA, $222 million Asia-Pacific), and $22.08 billion in total debt principal outstanding.10-Q ↗ - Unlock all Digital Realty and Equinix filings and extracted figures →
More operator comparisons in United States
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this Digital Realty vs Equinix benchmark using the citation or HTML attribution link below.
Plain-text citation:
Digital Realty (119 sites: 113 operating, 6 planned) vs Equinix (108 sites: 88 operating, 20 planned) in the United States, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/us-data-centers/compare/digital-realty-vs-equinix)
HTML attribution link:
<a href="https://realassets.analystai.ai/us-data-centers/compare/digital-realty-vs-equinix">Digital Realty vs Equinix: United States data center benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 227 Digital Realty and Equinix data center sites in the United States
Compare every Digital Realty (119 sites) and Equinix (108 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Digital Realty have compared with Equinix in the United States?
As of 11 November 2026, Digital Realty has 119 tracked sites (113 operating and 6 planned or under construction, ranked #1), compared with 108 for Equinix (88 operating and 20 planned or under construction, ranked #2).
Where do Digital Realty and Equinix overlap in the United States?
Digital Realty and Equinix both have tracked sites in 9 states: Virginia (34 vs 23), California (20 vs 23), Texas (22 vs 10), Illinois (10 vs 12), Georgia (5 vs 11).
How does reported power capacity compare between Digital Realty and Equinix?
Reported power capacity: Digital Realty has 950 MW operating, 1.8 GW planned, while Equinix has 240 MW planned.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data