AnalystAIReal Assets Start free trial

← United States data centers · All comparisons · All operators · DataBank (91) · CyrusOne (61)

Head-to-head operator comparison, sourced from primary filings

DataBank vs CyrusOne:91 vs 61 data center sites.

As of 11 November 2026, Real Assets tracks 91 data center sites under DataBank (72 operating, 19 planned) vs 61 under CyrusOne (45 operating, 16 planned) in the United States. Reported power capacity: DataBank has 133 MW operating, 2.1 GW planned, while CyrusOne has 320 MW operating, 2.0 GW planned. Both operators overlap in 8 states, led by Texas (25 vs 23), Virginia (6 vs 9), Illinois (4 vs 7).

Unlock all 152 DataBank & CyrusOne sites
DataBank vs CyrusOneUnited States data center
91 vs 61

#3 vs #5 by sites tracked · 72 vs 45 operating

  • DataBank: 91 sites
  • CyrusOne: 61 sites
  • 8 shared states
🔒Site names, capacity & coordinates locked · Unlock both footprints

Mapped DataBank and CyrusOne site positions in United States (exact coordinates require sign-in)

Instant code or 1-click sign-in:
91 vs 61sites tracked (#3 vs #5)
72 vs 45operating sites
19 vs 16planned or under construction
8shared states (15 vs 13 active)

DataBank vs CyrusOne: side-by-side summary

Head-to-head comparison of DataBank and CyrusOne across the United States as of 11 November 2026.
#MetricDataBankCyrusOne
1Rank by sites tracked in United States#3 of 174#5 of 174
2Total sites tracked91 (6% of market)61 (4% of market)
3Operating sites7245
4Planned or under construction1916
5Power capacity operating133 MW320 MW
6Power capacity planned2.1 GW2.0 GW
7Active states1513
8Largest stateTexas (25)Texas (23)

Footprint by state: DataBank vs CyrusOne

States in the United States where DataBank or CyrusOne has tracked data center sites.
#StateDataBank sitesCyrusOne sitesCombined
1Texas252348
2Virginia6915
3Illinois4711
4California8210
5Georgia808
6Ohio257
7Utah606
8Arizona246
9Colorado505
10Minnesota505
11New York415
12New Jersey224
13Kansas303
14Pennsylvania303
15North Carolina033

DataBank & CyrusOne: SEC filings, annual reports and disclosed figures

Primary regulatory filings and annual reports on record for DataBank and CyrusOne.

Cite or link to this benchmark

Analysts, journalists, and investor relations teams can reference this DataBank vs CyrusOne benchmark using the citation or HTML attribution link below.

Plain-text citation:

DataBank (91 sites: 72 operating, 19 planned) vs CyrusOne (61 sites: 45 operating, 16 planned) in the United States, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/us-data-centers/compare/databank-vs-cyrusone)

HTML attribution link:

<a href="https://realassets.analystai.ai/us-data-centers/compare/databank-vs-cyrusone">DataBank vs CyrusOne: United States data center benchmark (Real Assets)</a>

Full market dataset & site-level records

Unlock all 152 DataBank and CyrusOne data center sites in the United States

Compare every DataBank (91 sites) and CyrusOne (61 sites) facility on the interactive map with site-level capacity, status, and primary source filings.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

How this data is built

Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

How this data is built and what a source line means

Questions

How many data center sites does DataBank have compared with CyrusOne in the United States?

As of 11 November 2026, DataBank has 91 tracked sites (72 operating and 19 planned or under construction, ranked #3), compared with 61 for CyrusOne (45 operating and 16 planned or under construction, ranked #5).

Where do DataBank and CyrusOne overlap in the United States?

DataBank and CyrusOne both have tracked sites in 8 states: Texas (25 vs 23), Virginia (6 vs 9), Illinois (4 vs 7), California (8 vs 2), Ohio (2 vs 5).

How does reported power capacity compare between DataBank and CyrusOne?

Reported power capacity: DataBank has 133 MW operating, 2.1 GW planned, while CyrusOne has 320 MW operating, 2.0 GW planned.

Where does the comparison data come from?

Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.

See every site, operator and source

This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.

Open the data centers data