CyrusOne Mesa:data center in Mesa, Arizona.

CyrusOne Mesa is a planned data center in Mesa, Arizona, listed under CyrusOne. Planned capacity is 198 MW according to Area Development. 2024 to 2026 satellite: little change (-4 to +4 pts). Real Assets links 3 source pages, including DatacenterDynamics.

Open this site on the map View the full site record
Mesa, ArizonaCyrusOne
198 MW

planned data center · 3 linked sources

  • CyrusOne
  • Mesa
  • Arizona
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Arizona peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
198 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCyrusOne
  • City and stateMesa, Arizona
  • Statusplanned
  • Planned capacity198 MW, as stated by Area Development
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteLittle roof change, (-4 to +4 pts, 2024 to 2026), 21 April 2024 to 12 November 2026
  • Sources linked3 from 1 publisher
  • Record updated20 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map
  • Sourced figures, each with its page and quote🔒 7 figures

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Arizona has 58 data centers on record in Real Assets, with 1.53 GW reported as operating and 14.34 GW not yet operating. CyrusOne Mesa is one of them.

CyrusOne has 57 data centers on record in the United States: 42 operating and 15 planned or under construction. See CyrusOne in Arizona (3 sites). Compare Digital Realty vs CyrusOne.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open CyrusOne Mesa's record: 3 source pages and 7 sourced figures - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Comparing clear 10 m satellite passes across 2024 to 2026 (21 April 2024 to 12 November 2026), CyrusOne Mesa shows little change in roofed area with a roofed-share shift of -4 to +4 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites

More CyrusOne data centers in Arizona

CyrusOne data centers in other states

Other data centers in Arizona

Full site dossier & United States dataset

Open CyrusOne Mesa and 1,276 other data centers

This page is the public summary for CyrusOne Mesa in Mesa, Arizona. Sign in to see its full record: 3 source pages and 7 sourced figures.

  • CyrusOne Mesa on the interactive map, with the sites around it
  • All 3 linked source pages
  • 7 sourced figures, each with its page and quote

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates CyrusOne Mesa?

CyrusOne Mesa is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CyrusOne Mesa?

In Mesa, Arizona. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CyrusOne Mesa have?

198 MW, as stated by Area Development. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Is CyrusOne Mesa under construction or growing on satellite imagery?

Comparing clear 10 m satellite passes across 2024 to 2026 (21 April 2024 to 12 November 2026), CyrusOne Mesa shows little change in roofed area with a roofed-share shift of -4 to +4 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Where does this information come from?

From 3 linked pages by DatacenterDynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.