← United States data centers · All sites · Arizona · Mesa
Sourced site record, every fact links to its page
CyrusOne Mesa:data center in Mesa, Arizona.
CyrusOne Mesa is a planned data center in Mesa, Arizona, listed under CyrusOne. Planned capacity is 198 MW according to Area Development. 2024 to 2026 satellite: little change (-4 to +4 pts). Real Assets links 3 source pages, including DatacenterDynamics.
Open this site on the map View the full site recordplanned data center · 3 linked sources
- CyrusOne
- Mesa
- Arizona
Approximate position and Arizona peer sites (the exact position needs sign-in)
Facts on record
- OperatorCyrusOne
- City and stateMesa, Arizona
- Statusplanned
- Planned capacity198 MW, as stated by Area Development
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-4 to +4 pts, 2024 to 2026), 21 April 2024 to 12 November 2026
- Sources linked3 from 1 publisher
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 7 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Arizona has 58 data centers on record in Real Assets, with 1.53 GW reported as operating and 14.34 GW not yet operating. CyrusOne Mesa is one of them.
CyrusOne has 57 data centers on record in the United States: 42 operating and 15 planned or under construction. See CyrusOne in Arizona (3 sites). Compare Digital Realty vs CyrusOne.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- CyrusOne plots second Phoenix campus in Mesa
DatacenterDynamics, datacenterdynamics.com, published 18 September 2026Web page - Mesa planning officials recommend approval for CyrusOne and Pacific Proving data center campuses
DatacenterDynamics, datacenterdynamics.com, published 18 September 2026Web page - 1 additional source filing & extracted fact citations for CyrusOne Mesa
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (21 April 2024 to 12 November 2026), CyrusOne Mesa shows little change in roofed area with a roofed-share shift of -4 to +4 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
More CyrusOne data centers in Arizona
- PHX1-PHX8 (Phoenix)
Chandler, Arizona, operating169 MW - CyrusOne Chandler Campus
Chandler, Arizona, operatingNot recorded
CyrusOne data centers in other states
- CyrusOne - Talkington Township Campus
Talkington Township, Illinois, planned600 MW - CyrusOne DFW10
Whitney, Texas, under construction400 MW - CyrusOne DFW - Fairfield
Fairfield, Texas, under construction380 MW - CHI1 (Chicago)
Chicago, Illinois, operating140 MW - Ameresco NAS Lemoore Data Center
Kings, California, planned100 MW - CyrusOne DFW7
Fort Worth, Texas, under construction70 MW
Other data centers in Arizona
- SpaceXAI, Cochise County
Cochise County, Arizona, planned6 GW - Tract Phoenix
Maricopa, Arizona, planned1.8 GW - Hassayampa Ranch Data Center
Buckeye, Arizona, planned1.5 GW - QTS Phoenix 3 Campus
Litchfield Park, Arizona, planned750 MW - Davis-Monthan AFB Data Center
Tucson, Arizona, planned500 MW - Google Mesa Redhawk Campus
Mesa, Arizona, operating400 MW
Full site dossier & United States dataset
Open CyrusOne Mesa and 1,276 other data centers
This page is the public summary for CyrusOne Mesa in Mesa, Arizona. Sign in to see its full record: 3 source pages and 7 sourced figures.
- CyrusOne Mesa on the interactive map, with the sites around it
- All 3 linked source pages
- 7 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates CyrusOne Mesa?
CyrusOne Mesa is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is CyrusOne Mesa?
In Mesa, Arizona. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does CyrusOne Mesa have?
198 MW, as stated by Area Development. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is CyrusOne Mesa under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (21 April 2024 to 12 November 2026), CyrusOne Mesa shows little change in roofed area with a roofed-share shift of -4 to +4 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 3 linked pages by DatacenterDynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.