← United States data centers · All sites · Texas · Fort Worth
Sourced site record, every fact links to its page
CyrusOne DFW7:data center in Fort Worth, Texas.
CyrusOne DFW7 is an under construction data center in Fort Worth, Texas, listed under CyrusOne. Planned capacity is 70 MW according to CyrusOne. Real Assets links 2 source pages, including Data Center Dynamics, CyrusOne.
Open this site on the map View the full site recordunder construction data center · 2 linked sources
- CyrusOne
- Fort Worth
- Texas
Approximate position and Texas peer sites (the exact position needs sign-in)
Facts on record
- OperatorCyrusOne
- City and stateFort Worth, Texas
- Statusunder construction
- Planned capacity70 MW, as stated by CyrusOne
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated21 November 2026
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 5 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Texas has 245 data centers on record in Real Assets, with 5.19 GW reported as operating and 75.92 GW not yet operating. CyrusOne DFW7 is one of them.
CyrusOne has 57 data centers on record in the United States: 42 operating and 15 planned or under construction. See CyrusOne in Texas (22 sites). Compare Digital Realty vs CyrusOne.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- CyrusOne breaks ground on Fort Worth data center campus in Texas
Data Center Dynamics, datacenterdynamics.com, published 18 September 2026Web page - CyrusOne Breaks Ground on New Fort Worth Data Center Campus
CyrusOne, cyrusone.com, published 4 April 2025Web page
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
More CyrusOne data centers in Texas
- CyrusOne DFW10
Whitney, Texas, under construction400 MW - CyrusOne DFW - Fairfield
Fairfield, Texas, under construction380 MW - CyrusOne Fort Worth
Fort Worth, Texas, under construction70 MW - Allen, TX, DFW3-DFW5
Allen, Texas, operatingNot recorded - AUS2 (Austin)
Austin, Texas, operatingNot recorded - AUS3 (Austin)
Austin, Texas, operatingNot recorded
CyrusOne data centers in other states
- CyrusOne - Talkington Township Campus
Talkington Township, Illinois, planned600 MW - CyrusOne Mesa
Mesa, Arizona, planned198 MW - PHX1-PHX8 (Phoenix)
Chandler, Arizona, operating169 MW - CHI1 (Chicago)
Chicago, Illinois, operating140 MW - Ameresco NAS Lemoore Data Center
Kings, California, planned100 MW - CyrusOne NVA4
Sterling, Virginia, operating11 MW
Other data centers in Texas
- Project Matador
Panhandle, Texas, under construction17 GW - GridFree AI South Dallas One
Dallas, Texas, planned5 GW - Sailfish Comanche Circle
Tolar, Texas, planned5 GW - Prometheus Pecos Project
Pecos, Texas, planned2.5 GW - Amp Energy East Texas
Lufkin, Texas, planned2.1 GW - IREN Sweetwater Mega-Hub (Sweetwater 1 & 2)
Sweetwater, Texas, under construction2 GW
Full site dossier & United States dataset
Open CyrusOne DFW7 and 1,276 other data centers
This page is the public summary for CyrusOne DFW7 in Fort Worth, Texas. Sign in to see its full record: 2 source pages and 5 sourced figures.
- CyrusOne DFW7 on the interactive map, with the sites around it
- All 2 linked source pages
- 5 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates CyrusOne DFW7?
CyrusOne DFW7 is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is CyrusOne DFW7?
In Fort Worth, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does CyrusOne DFW7 have?
70 MW, as stated by CyrusOne. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Data Center Dynamics, CyrusOne. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.