AnalystAIReal Assets Start the 3-day preview

← United States data centers · All sites · Arizona

Sourced site record, every fact links to its page

QTS Phoenix 3 Campus:data center in Litchfield Park, Arizona.

QTS Phoenix 3 Campus is a planned data center in Litchfield Park, Arizona, listed under QTS Data Centers. Planned capacity is 750 MW according to Data Center Dynamics. Real Assets links 3 source pages, including QTS Data Centers (Blackstone), Data Center Dynamics.

Open this site on the map View the full site record
Litchfield Park, ArizonaQTS Data Centers
750 MW

planned data center · 3 linked sources

  • QTS Data Centers
  • Litchfield Park
  • Arizona
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Arizona peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
750 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorQTS Data Centers
  • City and stateLitchfield Park, Arizona
  • Statusplanned
  • Planned capacity750 MW, as stated by Data Center Dynamics
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated21 November 2026
  • Exact location on the map🔒 View on the map
  • Sourced figures, each with its page and quote🔒 6 figures

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Arizona has 58 data centers on record in Real Assets, with 1.53 GW reported as operating and 14.34 GW not yet operating. QTS Phoenix 3 Campus is one of them.

QTS Data Centers has 45 data centers on record in the United States: 28 operating and 15 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open QTS Phoenix 3 Campus's record: 3 source pages and 6 sourced figures - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

More QTS Data Centers data centers in Arizona

QTS Data Centers data centers in other states

Other data centers in Arizona

Full site dossier & United States dataset

Open QTS Phoenix 3 Campus and 1,276 other data centers

This page is the public summary for QTS Phoenix 3 Campus in Litchfield Park, Arizona. Sign in to see its full record: 3 source pages and 6 sourced figures.

  • QTS Phoenix 3 Campus on the interactive map, with the sites around it
  • All 3 linked source pages
  • 6 sourced figures, each with its page and quote

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates QTS Phoenix 3 Campus?

QTS Phoenix 3 Campus is recorded under QTS Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is QTS Phoenix 3 Campus?

In Litchfield Park, Arizona. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does QTS Phoenix 3 Campus have?

750 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by QTS Data Centers (Blackstone), Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.