AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

QTS Eagle Mountain:data center in Eagle Mountain, Utah.

QTS Eagle Mountain is a planned data center in Eagle Mountain, Utah, listed under QTS Data Centers. Planned capacity is 411 MW according to Epoch AI Frontier Data Centers. Real Assets links 5 source pages, including Daqpermitting Official Source, Epoch AI Frontier Data Centers, Epoch AI Frontier Research.

Open this site on the map Start a 7-day trial
411 MWplanned capacity
Plannedstatus
5source pages linked
2027-07-01expected completion

Facts on record

  • OperatorQTS Data Centers
  • City and stateEagle Mountain, Utah
  • Statusplanned
  • Planned capacity411 MW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completion2027-07-01
  • Sources linked5 from 5 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 6 data centers in Utah that have a page.

QTS Data Centers has 46 data centers on record in the United States: 28 operating and 16 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

5 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

QTS Data Centers data centers in other states

Other data centers in Utah

Full market dataset & site-level records

Open QTS Eagle Mountain and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see QTS Eagle Mountain on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates QTS Eagle Mountain?

QTS Eagle Mountain is recorded under QTS Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is QTS Eagle Mountain?

In Eagle Mountain, Utah. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does QTS Eagle Mountain have?

411 MW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 5 linked pages by Daqpermitting Official Source, Epoch AI Frontier Data Centers, Epoch AI Frontier Research, Q Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.