AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

High Performance Compute Data Center Campus:data center in Millard, Utah.

High Performance Compute Data Center Campus is a planned data center in Millard, Utah, listed under Joule Capital Partners. Planned capacity is 4 GW according to Microgrid Knowledge. Real Assets links 3 source pages, including Microgrid Knowledge, enr.com.

Open this site on the map Start a 7-day trial
4 GWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorJoule Capital Partners
  • City and stateMillard, Utah
  • Statusplanned
  • Planned capacity4 GW, as stated by Microgrid Knowledge
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated27 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 2 data centers in Utah that have a page.

Joule Capital Partners has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 08:14 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

3 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Utah

Full market dataset & site-level records

Open High Performance Compute Data Center Campus and 23 other data centers

This page is the public summary. Start a 7-day trial or sign in to see High Performance Compute Data Center Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates High Performance Compute Data Center Campus?

High Performance Compute Data Center Campus is recorded under Joule Capital Partners. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is High Performance Compute Data Center Campus?

In Millard, Utah. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does High Performance Compute Data Center Campus have?

4 GW, as stated by Microgrid Knowledge. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Microgrid Knowledge, enr.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.