← United States data centers · All sites
Sourced site record, every fact links to its page
Stratos Hyperscale Campus:data center in Snowville, Utah.
Stratos Hyperscale Campus is a planned data center in Snowville, Utah, listed under Bitzero Blockchain Inc.. Planned capacity is 9 GW according to Grist. Real Assets links 2 source pages, including Grist, MIDA (Military Installation Development Authority), via Utah Business.
Open this site on the map Start a 7-day trialFacts on record
- OperatorBitzero Blockchain Inc.
- City and stateSnowville, Utah
- Statusplanned
- Planned capacity9 GW, as stated by Grist
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated30 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 2 data centers in Utah that have a page.
Bitzero Blockchain Inc. has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 08:14 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Utah's fragile desert could feel like the Sahara if America's biggest data center gets built
Grist, grist.org, published 18 May 2026Web page - utahbusiness.com
MIDA (Military Installation Development Authority), via Utah Business, utahbusiness.com, published 8 May 2026Web page
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Other data centers in Utah
- High Performance Compute Data Center Campus
Millard, Utah, planned4 GW
Full market dataset & site-level records
Open Stratos Hyperscale Campus and 23 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Stratos Hyperscale Campus on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Stratos Hyperscale Campus?
Stratos Hyperscale Campus is recorded under Bitzero Blockchain Inc.. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Stratos Hyperscale Campus?
In Snowville, Utah. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Stratos Hyperscale Campus have?
9 GW, as stated by Grist. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Grist, MIDA (Military Installation Development Authority), via Utah Business. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.