QTS Cedar Rapids:data center in Fairfax, Iowa.
QTS Cedar Rapids is a planned data center in Fairfax, Iowa, listed under QTS Data Centers. Planned capacity is 1.59 GW according to Epoch AI Frontier Data Centers. 2024 to 2026 satellite: filling (+22 to +30 pts). Real Assets links 12 source pages, including cdn.misoenergy.org, corridorbusiness.com.
Open this site on the map View the full site recordplanned data center · 12 linked sources
- QTS Data Centers
- Fairfax
- Iowa
Approximate position and Iowa peer sites (the exact position needs sign-in)
Facts on record
- OperatorQTS Data Centers
- City and stateFairfax, Iowa
- Statusplanned
- Planned capacity1.59 GW, as stated by Epoch AI Frontier Data Centers
- Expected completion2027-11-15
- 2024 vs 2026 satelliteRoofed share filling, (+22 to +30 pts, 2024 to 2026), 10 February 2024 to 15 November 2026
- Sources linked12 from 2 publishers
- Record updated17 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 11 figures
- Deals recorded on this site🔒 1 deal
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 18 data centers in Iowa that have a page.
QTS Data Centers has 45 data centers on record in the United States: 28 operating and 15 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Microsoft Fairwater Wisconsin - planning
cdn.misoenergy.org, published 19 October 2026Web page - QTS Cedar Rapids - Article by Corridor Business Journal
corridorbusiness.com, published 19 October 2026Web page - 10 additional source filings & extracted fact citations for QTS Cedar Rapids
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
12 sources on record; 2 shown above and 10 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open QTS Cedar Rapids's record: 12 source pages, 11 sourced figures and 1 recorded deal - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (10 February 2024 to 15 November 2026), QTS Cedar Rapids shows active roof growth (filling) with a roofed-share shift of +22 to +30 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
QTS Data Centers data centers in other states
- QTS Blakely
Blakely, Georgia, planned1.5 GW - QTS Phoenix 3 Campus
Litchfield Park, Arizona, planned750 MW - Van Wert Data Center
Van Wert, Ohio, planned500 MW - QTS Eagle Mountain
Eagle Mountain, Utah, planned411 MW - QTS Richmond 3
Sandston, Virginia, operating336 MW - QTS Atlanta 1
Atlanta, Georgia, operating278 MW
Other data centers in Iowa
- COPT Van Meter Campus
Van Meter, Iowa, planned1 GW - Microsoft West Des Moines Cloud Cluster (Ginger & Osmium)
West Des Moines, Iowa, operating1 GW - Tract Des Moines
Altoona, Iowa, planned1 GW - Google Cedar Rapids Data Center
Cedar Rapids, Iowa, planned600 MW - Google Council Bluffs Mega-Campus
Council Bluffs, Iowa, operating400 MW - Applied Digital Adair
Adair, Iowa, planned200 MW
Full site dossier & United States dataset
Open QTS Cedar Rapids and 1,276 other data centers
This page is the public summary for QTS Cedar Rapids in Fairfax, Iowa. Sign in to see its full record: 12 source pages, 11 sourced figures and 1 recorded deal.
- QTS Cedar Rapids on the interactive map, with the sites around it
- All 12 linked source pages
- 11 sourced figures, each with its page and quote
- 1 recorded deal on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates QTS Cedar Rapids?
QTS Cedar Rapids is recorded under QTS Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is QTS Cedar Rapids?
In Fairfax, Iowa. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does QTS Cedar Rapids have?
1.59 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is QTS Cedar Rapids under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (10 February 2024 to 15 November 2026), QTS Cedar Rapids shows active roof growth (filling) with a roofed-share shift of +22 to +30 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 12 linked pages by cdn.misoenergy.org, corridorbusiness.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.