Polaris Forge 2 Campus:data center in Harwood, North Dakota.

Polaris Forge 2 Campus is an under construction data center in Harwood, North Dakota, listed under Applied Digital. Planned capacity is 300 MW. Real Assets links 2 source pages, including Applied Digital, new.abb.com.

Open this site on the map Start a 7-day trial
300 MWplanned capacity
Under constructionstatus
2source pages linked
2026expected completion

Facts on record

  • OperatorApplied Digital
  • City and stateHarwood, North Dakota
  • Statusunder construction
  • Planned capacity300 MW
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completion2026
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 9 data centers in North Dakota that have a page.

Applied Digital has 10 data centers on record in the United States: 4 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Applied Digital data centers in North Dakota

Applied Digital data centers in other states

Other data centers in North Dakota

Full market dataset & site-level records

Open Polaris Forge 2 Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Polaris Forge 2 Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Polaris Forge 2 Campus?

Polaris Forge 2 Campus is recorded under Applied Digital. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Polaris Forge 2 Campus?

In Harwood, North Dakota. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Polaris Forge 2 Campus have?

300 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Applied Digital, new.abb.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.