AnalystAIReal Assets Start free trial

← United States data centers · All sites · Ohio

Sourced site record, every fact links to its page

Meta Bowling Green:data center in Bowling Green, Ohio.

Meta Bowling Green is an under construction data center in Bowling Green, Ohio, listed under Meta. Planned capacity is 570 MW according to Epoch AI Frontier Data Centers. Real Assets links 5 source pages, including Archive Official Source, Epoch AI Frontier Data Centers, Drive Official Source.

Open this site on the map Start a 7-day trial
570 MWplanned capacity
Under constructionstatus
5source pages linked
2028-01-01expected completion

Facts on record

  • OperatorMeta
  • City and stateBowling Green, Ohio
  • Statusunder construction
  • Planned capacity570 MW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completion2028-01-01
  • Sources linked5 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. Meta Bowling Green is one of them.

Meta has 29 data centers on record in the United States: 23 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

5 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Meta data centers in Ohio

Meta data centers in other states

Other data centers in Ohio

Full market dataset & site-level records

Open Meta Bowling Green and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Meta Bowling Green on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Meta Bowling Green?

Meta Bowling Green is recorded under Meta. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Meta Bowling Green?

In Bowling Green, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Meta Bowling Green have?

570 MW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 5 linked pages by Archive Official Source, Epoch AI Frontier Data Centers, Drive Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.