AnalystAIReal Assets
Start free trial← United States data centers · All sites
Sourced site record, every fact links to its page
Amazon AWS Madison County Mega-Campus is an operating data center in Canton, Mississippi, listed under Amazon. Capacity is 2.2 GW according to Epoch AI Frontier Data Centers. Real Assets links 7 source pages, including Epoch AI Frontier Data Centers, State Air Quality & Regulatory Permit, SemiAnalysis Datacenter Research.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Real Assets records 8 data centers in Mississippi that have a page.
Amazon has 30 data centers on record in the United States: 10 operating and 19 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 28 October 2026; this page was built on 27 October 2026 at 17:34 UTC, so the live app can show a few more or fewer sites and deals.
7 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Amazon AWS Madison County Mega-Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Amazon AWS Madison County Mega-Campus is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.
In Canton, Mississippi. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
2.2 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 284 MW.
From 7 linked pages by Epoch AI Frontier Data Centers, State Air Quality & Regulatory Permit, SemiAnalysis Datacenter Research, Cat Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.