AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas

Sourced site record, every fact links to its page

Crusoe & Lancium Abilene Expansion (Microsoft AI Factory):data center in Abilene, Texas.

Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) is an under construction data center in Abilene, Texas, listed under Crusoe. Planned capacity is 900 MW according to DataCenterKnowledge. Real Assets links 3 source pages, including baxtel.com, W.Media, datacenterknowledge.com.

Open this site on the map Start a 7-day trial
900 MWplanned capacity
Under constructionstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCrusoe
  • City and stateAbilene, Texas
  • Statusunder construction
  • Planned capacity900 MW, as stated by DataCenterKnowledge
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) is one of them.

Crusoe has 7 data centers on record in the United States: 1 operating and 5 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Crusoe data centers in Texas

Other data centers in Texas

Full market dataset & site-level records

Open Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Crusoe & Lancium Abilene Expansion (Microsoft AI Factory)?

Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) is recorded under Crusoe. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Crusoe & Lancium Abilene Expansion (Microsoft AI Factory)?

In Abilene, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Crusoe & Lancium Abilene Expansion (Microsoft AI Factory) have?

900 MW, as stated by DataCenterKnowledge. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by baxtel.com, W.Media, datacenterknowledge.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.