AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas

Sourced site record, every fact links to its page

Crusoe Goodnight Campus (Project Llano):data center in Claude, Texas.

Crusoe Goodnight Campus (Project Llano) is an under construction data center in Claude, Texas, listed under Crusoe. Planned capacity is 1 GW according to Epoch AI Frontier Data Centers. Real Assets links 20 source pages, including Epoch AI Frontier Data Centers, Drive Official Source, Epoch AI Frontier Research.

Open this site on the map Start a 7-day trial
1 GWplanned capacity
Under constructionstatus
20source pages linked
2027 (Phase 1 COD)expected completion

Facts on record

  • OperatorCrusoe
  • City and stateClaude, Texas
  • Statusunder construction
  • Planned capacity1 GW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land area141.6 hectares (about 350 acres)
  • Building floor areaNot recorded
  • Expected completion2027 (Phase 1 COD)
  • Sources linked20 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Crusoe Goodnight Campus (Project Llano) is one of them.

Crusoe has 7 data centers on record in the United States: 1 operating and 5 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

20 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

More Crusoe data centers in Texas

Other data centers in Texas

Full market dataset & site-level records

Open Crusoe Goodnight Campus (Project Llano) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Crusoe Goodnight Campus (Project Llano) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Crusoe Goodnight Campus (Project Llano)?

Crusoe Goodnight Campus (Project Llano) is recorded under Crusoe. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Crusoe Goodnight Campus (Project Llano)?

In Claude, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Crusoe Goodnight Campus (Project Llano) have?

1 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 20 linked pages by Epoch AI Frontier Data Centers, Drive Official Source, Epoch AI Frontier Research. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.