← United States data centers · All sites · Nevada · Sparks
Sourced site record, every fact links to its page
Crusoe and Redwood Materials' operating datacenter microgrid:data center in Sparks, Nevada.
Crusoe and Redwood Materials' operating datacenter microgrid is an operating data center in Sparks, Nevada, listed under Crusoe. Capacity is 12 MW according to SemiAnalysis Datacenter Research. Real Assets links 1 source page, including SemiAnalysis Datacenter Research.
Open this site on the map Start a 7-day trialoperating data center · 1 linked source
- Crusoe
- Sparks
- Nevada
Approximate metro position & Nevada peer sites (exact coordinates require sign-in)
Facts on record
- OperatorCrusoe
- City and stateSparks, Nevada
- Statusoperating
- Capacity12 MW, as stated by SemiAnalysis Datacenter Research
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated31 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Nevada has 17 data centers on record in Real Assets, with 811 MW reported as operating and 4.77 GW not yet operating. Crusoe and Redwood Materials' operating datacenter microgrid is one of them.
Crusoe has 7 data centers on record in the United States: 1 operating and 5 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 31 October 2026 at 05:24 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- What is So Hard About Behind-The-Meter Power For Datacenters? Part 1
SemiAnalysis Datacenter Research, newsletter.semianalysis.com, published 19 October 2026Web page
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
Crusoe data centers in other states
- Crusoe Port of Victoria Campus
Victoria, Texas, planned1.5 GW - Lancium & Crusoe Clean AI Campus
Abilene, Texas, operating1.2 GW - Crusoe & Lancium Childress Clean AI Campus
Childress, Texas, planned1 GW - Crusoe Goodnight Campus (Project Llano)
Claude, Texas, under construction1 GW - Crusoe & Lancium Abilene Expansion (Microsoft AI Factory)
Abilene, Texas, under construction900 MW - Crusoe Armstrong County AI Campus (Google)
Claude, Texas, plannedNot recorded
Other data centers in Nevada
- South Valley Technology Park
Sparks, Nevada, planned1.2 GW - Monarch Data Center
Yerington, Nevada, planned1 GW - Peru Shelf Technology Park
Sparks, Nevada, under construction810 MW - Tract Silver Springs
Silver Springs, Nevada, planned700 MW - Switch Tahoe Reno (The Citadel Campus)
Reno / McCarran, Nevada, operating650 MW - Google Tahoe Reno Industrial Center Campus
McCarran, Nevada, operating350 MW
Full market dataset & site-level records
Open Crusoe and Redwood Materials' operating datacenter microgrid and 830 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Crusoe and Redwood Materials' operating datacenter microgrid on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Crusoe and Redwood Materials' operating datacenter microgrid?
Crusoe and Redwood Materials' operating datacenter microgrid is recorded under Crusoe. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Crusoe and Redwood Materials' operating datacenter microgrid?
In Sparks, Nevada. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Crusoe and Redwood Materials' operating datacenter microgrid have?
12 MW, as stated by SemiAnalysis Datacenter Research. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by SemiAnalysis Datacenter Research. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.