← United States data centers · All operators · All states
Live market record, the source behind every published figure
Crusoe:7 data center sites in United States.
As of 30 October 2026, Real Assets tracks 7 data center sites listed under Crusoe in the United States: 1 operating and 5 planned or under construction. Reported power capacity: 421 MW operating, 5.2 GW not yet operating. It ranks number 21 by sites among 173 named operators, with 1% of the 853 sites tracked. Largest states: Texas (6), Virginia (1).
Unlock all 7 Crusoe sites1 operating · 5 planned or under construction · #21 operator
- Texas (6)
- Virginia (1)
Mapped Crusoe footprint in United States (site-level details require sign-in)
Where Crusoe is
Largest operators in United States
Crusoe: 6 data centers with their own page
- Crusoe Port of Victoria Campus
Victoria, Texas1.5 GW - Lancium & Crusoe Clean AI Campus
Abilene, Texas1.2 GW - Crusoe & Lancium Childress Clean AI Campus
Childress, Texas1 GW - Crusoe Goodnight Campus (Project Llano)
Claude, Texas1 GW - Crusoe & Lancium Abilene Expansion (Microsoft AI Factory)
Abilene, Texas900 MW - Crusoe Armstrong County AI Campus (Google)
Claude, TexasNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Crusoe by state
Regional breakdown pages where Crusoe has at least 3 tracked data center sites.
Crusoe: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Crusoe, with disclosed capital expenditure, lease commitments and capacity figures.
- Crusoe Energy Systems & Blue Owl $15B Abilene Texas Lancium Clean Campus AI Data Center Report (8-K / Earnings Release · 2025 · filed 22 May 2025)
Details the 1.2 GW Abilene, Texas Lancium Clean Campus (Phase 1 200 MW + Phase 2 1,000 MW across 8 buildings backed by $15B in project debt and equity with Blue Owl and Primary Digital Infrastructure) alongside clean-compute deployments in Wyoming and Iceland.8-K / Earnings Release ↗ - Unlock all Crusoe filings and extracted figures →
Full market dataset & site-level records
Unlock all 7 Crusoe data center sites in the United States
This page previews Crusoe's top footprint. Sign in or start a trial to inspect all 7 individual Crusoe facilities, site-by-site capacity, status, and source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 13:25 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Crusoe have in the United States?
7 tracked as of 30 October 2026: 1 operating and 5 planned or under construction. This is what we have recorded, not a full census.
Where are Crusoe's data center sites?
Largest states by sites: Texas (6), Virginia (1).
How much power capacity does Crusoe have?
Reported power capacity: 421 MW operating, 5.2 GW not yet operating.
How does Crusoe compare with other data center operators?
It ranks number 21 of the 65 largest named operators by sites tracked. The largest is Digital Realty with 84.
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data