AnalystAIReal Assets
Start free trial← United States data centers · All operators · All states
Live market record, the source behind every published figure
As of 20 October 2026, Real Assets tracks 17 data center sites in Nevada, 2% of the 864 tracked in the United States. Power capacity: 1.3 GW operating, 8.7 GW planned or under construction (reported for 14 of 17 sites). Most sites: Tract (5), Google (4), Vantage Data Centers (2).
Unlock all 17 Nevada sitesFull market dataset & site-level records
This page previews the top 3 operators in Nevada. Sign in or start a trial to view all 17 individual facilities in Nevada, exact locations, capacity figures, and source links.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 20 October 2026.
17 as of 20 October 2026, 2% of the 864 tracked in the United States. This is what we have recorded, not a full census.
By sites tracked: Tract (5), Google (4), Vantage Data Centers (2).
Power capacity: 1.3 GW operating, 8.7 GW planned or under construction (reported for 14 of 17 sites).
Nevada ranks number 12 of the 15 largest states by sites tracked. The largest is Texas with 164.
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data