AnalystAIReal Assets
Start free trial← United States data centers · All sites · Nevada
Sourced site record, every fact links to its page
PowerHouse Reno Campus is an under construction data center in Sparks, Nevada, listed under PowerHouse Data Centers. Planned capacity is 200 MW. Real Assets links 2 source pages, including Baxtel, datacenterHawk.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Nevada has 17 data centers on record in Real Assets, with 1 GW reported as operating and 4.58 GW not yet operating. PowerHouse Reno Campus is one of them.
PowerHouse Data Centers has 10 data centers on record in the United States: 0 operating and 10 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see PowerHouse Reno Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
PowerHouse Reno Campus is recorded under PowerHouse Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
In Sparks, Nevada. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
200 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 2 linked pages by Baxtel, datacenterHawk. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.