AnalystAIReal Assets
Start free trial← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
Taylor Technology Campus (Project Mustang) is a planned data center in Taylor, Texas, listed under PowerHouse Data Centers. Planned capacity is 1 GW according to Data Center Dynamics. Real Assets links 1 source page, including Data Center Dynamics.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Taylor Technology Campus (Project Mustang) is one of them.
PowerHouse Data Centers has 10 data centers on record in the United States: 0 operating and 10 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Taylor Technology Campus (Project Mustang) on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Taylor Technology Campus (Project Mustang) is recorded under PowerHouse Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
In Taylor, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
1 GW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.