← United States data centers · Switch (44) · Nevada (41)
Live market record, the source behind every published figure
Switch in Nevada:19 data center sites.
As of 11 November 2026, Real Assets tracks 19 data center sites listed under Switch in Nevada: 15 operating and 4 planned or under construction. Reported power capacity in Nevada: 130 MW operating, 520 MW not yet operating. Nevada accounts for 43% of Switch's 44 tracked sites in the United States, and Switch accounts for 46% of the 41 tracked sites in Nevada.
Unlock all 19 Switch sites in Nevada15 operating · 4 planned · 46% of Nevada
- 43% of Switch in United States
- 130 MW operating
- #1 in Nevada
Mapped Switch sites in Nevada (highlighted) against all Nevada sites
Switch across United States
- Nevada19
- Texas10
- Georgia6
- Michigan4
- Pennsylvania3
- View all 44 Switch sites in United States →
Top operators in Nevada
- Switch19
- Tract5
- Google3
- Copia Power2
- Flexential2
- View all 41 sites in Nevada →
Switch in Nevada: 19 data centers with their own page
- Switch Tahoe Reno (The Citadel Campus)
Reno / McCarran, operating650 MW - Switch Apex Industrial Park
Las Vegas, plannedNot recorded - Switch Armory Bldg1
United States, plannedNot recorded - Switch Armory Bldg2
United States, plannedNot recorded - Switch Armory Bldg3
United States, plannedNot recorded - Switch Edge 1
Las Vegas, operatingNot recorded - Switch EVO AI Factory 1
Las Vegas, operatingNot recorded - Switch EVO AI Factory 2
Las Vegas, operatingNot recorded - Switch Las Vegas 10
Las Vegas, operatingNot recorded - Switch Las Vegas 11
Las Vegas, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded. All 1,305 sites with a page
Locked regional footprint & primary filings
View all 19 Switch sites in Nevada, government permit PDFs & MW timeline - enter work email
Unlock every Switch facility in Nevada on the interactive map with exact parcel coordinates, operating vs. planned MW by phase, and primary regulatory filings.
Switch: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Switch, with disclosed capital expenditure, lease commitments and capacity figures.
- Switch, Inc. (DigitalBridge & IFM Investors) Tier 5 Prime Campus & 100% Renewable Power Report (Annual Report · 2025 · filed 20 May 2025)
Details Switch's five North American Prime hyperscale campus ecosystems: The Core Campus (Las Vegas, Nevada), The Citadel Campus (Tahoe Reno, Nevada), The Rock Campus (Austin and Round Rock, Texas), The Keep Campus (Atlanta, Georgia), and The Pyramid Campus (Grand Rapids, Michigan).Annual Report ↗ - Unlock all Switch filings and extracted figures →
Full market dataset & site-level records
Unlock all 19 Switch data center sites in Nevada
Inspect every Switch facility in Nevada on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Switch have in Nevada?
19 tracked as of 11 November 2026: 15 operating and 4 planned or under construction. That is 43% of Switch's 44 tracked sites in the United States.
How much power capacity does Switch have in Nevada?
Reported power capacity in Nevada: 130 MW operating, 520 MW not yet operating.
How does Switch rank among data center operators in Nevada?
Switch ranks number 1 in Nevada by sites tracked, with 19 of the 41 sites recorded in Nevada (46%).
Where else does Switch operate in the United States?
Switch has 44 tracked sites across the United States: Nevada (19), Texas (10), Georgia (6), Michigan (4), Pennsylvania (3).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data