Fleet Storey County Campus is an under construction data center in Sparks, Nevada, listed under Fleet Data Centers. Planned capacity is 230 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Nevada has 17 data centers on record in Real Assets, with 1 GW reported as operating and 4.58 GW not yet operating. Fleet Storey County Campus is one of them.
Fleet Data Centers has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Fleet Storey County Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Fleet Storey County Campus is recorded under Fleet Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
In Sparks, Nevada. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
230 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 2 linked pages by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.