Crusoe Jayton Data Center Campus (Project Hyper):data center in Jayton, Texas.

Crusoe Jayton Data Center Campus (Project Hyper) is a planned data center in Jayton, Texas, listed under Crusoe Energy Systems. Capacity is not recorded. Real Assets links 1 source page, including Data Center Dynamics.

Open this site on the map Start a 7-day trial
Not recordedplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorCrusoe Energy Systems
  • City and stateJayton, Texas
  • Statusplanned
  • Planned capacityNot recorded
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor area141,068 square metres (about 1,518,456 square feet)
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated24 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Crusoe Jayton Data Center Campus (Project Hyper) is one of them.

Crusoe Energy Systems has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Texas

Full market dataset & site-level records

Open Crusoe Jayton Data Center Campus (Project Hyper) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Crusoe Jayton Data Center Campus (Project Hyper) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Crusoe Jayton Data Center Campus (Project Hyper)?

Crusoe Jayton Data Center Campus (Project Hyper) is recorded under Crusoe Energy Systems. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Crusoe Jayton Data Center Campus (Project Hyper)?

In Jayton, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Crusoe Jayton Data Center Campus (Project Hyper) have?

No capacity figure is recorded for this site. Real Assets does not estimate one.

Where does this information come from?

From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.