CleanArc VA1 Campus is an under construction data center in Ruther Glen, Virginia, listed under CleanArc Data Centers. Planned capacity is 900 MW according to Data Center Dynamics. Real Assets links 3 source pages, including WRIC ABC 8News, Fredericksburg Free Press, Data Center Dynamics.

Open this site on the map Start a 7-day trial
900 MWplanned capacity
Under constructionstatus
3source pages linked
2027expected completion

Facts on record

  • OperatorCleanArc Data Centers
  • City and stateRuther Glen, Virginia
  • Statusunder construction
  • Planned capacity900 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land area263.1 hectares (about 650 acres)
  • Building floor areaNot recorded
  • Expected completion2027
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Virginia has 119 data centers on record in Real Assets, with 3.75 GW reported as operating and 20.18 GW not yet operating. CleanArc VA1 Campus is one of them.

CleanArc Data Centers has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Virginia

Full market dataset & site-level records

Open CleanArc VA1 Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see CleanArc VA1 Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates CleanArc VA1 Campus?

CleanArc VA1 Campus is recorded under CleanArc Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CleanArc VA1 Campus?

In Ruther Glen, Virginia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CleanArc VA1 Campus have?

900 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by WRIC ABC 8News, Fredericksburg Free Press, Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.