AnalystAIReal Assets
Start free trial← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
Cipher Digital Barber Lake Campus is an under construction data center in Colorado City, Texas, listed under Cipher Digital. Planned capacity is 300 MW according to Epoch AI Frontier Data Centers. Real Assets links 11 source pages, including Epoch AI Frontier Data Centers, State Air Quality & Regulatory Permit, Anthropic Official Source.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Texas has 163 data centers on record in Real Assets, with 5.09 GW reported as operating and 73.02 GW not yet operating. Cipher Digital Barber Lake Campus is one of them.
Cipher Digital has 8 data centers on record in the United States: 2 operating and 6 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 28 October 2026; this page was built on 27 October 2026 at 17:34 UTC, so the live app can show a few more or fewer sites and deals.
11 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Cipher Digital Barber Lake Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Cipher Digital Barber Lake Campus is recorded under Cipher Digital. The operator is the name its sources give, which can differ from the owner or the tenant.
In Colorado City, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
300 MW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.
From 11 linked pages by Epoch AI Frontier Data Centers, State Air Quality & Regulatory Permit, Anthropic Official Source, Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.