AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas

Sourced site record, every fact links to its page

Black Pearl Facility:data center in Wink, Texas.

Black Pearl Facility is an operating data center in Wink, Texas, listed under Cipher Digital. Capacity is 300 MW according to Cipher Digital. Real Assets links 3 source pages, including Cipher Digital, Cipher Digital Inc. Form 10-K for fiscal year ended December 31, 2025.

Open this site on the map Start a 7-day trial
300 MWcapacity
Operatingstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCipher Digital
  • City and stateWink, Texas
  • Statusoperating
  • Capacity300 MW, as stated by Cipher Digital
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Black Pearl Facility is one of them.

Cipher Digital has 9 data centers on record in the United States: 3 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Cipher Digital data centers in Texas

Cipher Digital data centers in other states

  • Ulysses
    Piketon, Ohio, planned
    200 MW

Other data centers in Texas

Full market dataset & site-level records

Open Black Pearl Facility and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Black Pearl Facility on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Black Pearl Facility?

Black Pearl Facility is recorded under Cipher Digital. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Black Pearl Facility?

In Wink, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Black Pearl Facility have?

300 MW, as stated by Cipher Digital. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Cipher Digital, Cipher Digital Inc. Form 10-K for fiscal year ended December 31, 2025. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.