← United States data centers · Cipher Digital (8) · Texas (170)
Live market record, the source behind every published figure
Cipher Digital in Texas:7 data center sites.
As of 30 October 2026, Real Assets tracks 7 data center sites listed under Cipher Digital in Texas: 2 operating and 5 planned or under construction. Reported power capacity in Texas: 507 MW operating, 900 MW not yet operating. Texas accounts for 88% of Cipher Digital's 8 tracked sites in the United States, and Cipher Digital accounts for 4% of the 170 tracked sites in Texas.
Unlock all 7 Cipher Digital sites in Texas2 operating · 5 planned · 4% of Texas
- 88% of Cipher Digital in United States
- 507 MW operating
- #4 in Texas
Mapped Cipher Digital sites in Texas (highlighted) against all Texas sites
Cipher Digital across United States
Top operators in Texas
- CyrusOne23
- Digital Realty15
- Google8
- Cipher Digital7
- Crusoe6
- View all 170 sites in Texas →
Cipher Digital in Texas: 7 data centers with their own page
- Cipher Mikeska
Doole, planned500 MW - Black Pearl Facility
Wink, operating300 MW - Cipher Digital Barber Lake Campus
Colorado City, under construction300 MW - Odessa Facility
Odessa, operating207 MW - Cipher Stingray
Andrews, planned100 MW - McLennan
Riesel, plannedNot recorded - Reveille
Cotulla, plannedNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Cipher Digital: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Cipher Digital, with disclosed capital expenditure, lease commitments and capacity figures.
- Cipher Digital 8-K 2026-10-14 (8-K · 2026 · filed 14 October 2026)
Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-14 (2026, United States):8-K ↗ - Cipher Digital 8-K 2026-10-13 (8-K · 2026 · filed 13 October 2026)
Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-13 (2026, United States):8-K ↗ - Cipher Digital 8-K 2026-10-16 (8-K · 2026 · filed 13 October 2026)
Cipher Digital (SEC EDGAR) Cipher Digital 8-K 2026-10-16 (2026, United States):8-K ↗ - Cipher Digital Inc. Form 10-K, fiscal year 2025 (10-K · FY 2025 · filed 31 December 2025)
Cipher Digital FY 2025 Form 10-K: Discloses 600 MW of HPC data centers under development across two Texas campuses (300 MW gross capacity at Barber Lake leased to Fluidstack/Google and 300 MW gross capacity at Black Pearl in Wink, Texas under a 15-year lease with Amazon Web Services), 207 MW operating at Odessa, Texas, a 200 MW site in Ohio (Ulysses), and 1.67 GW of ERCOT pipeline sites (Stingray, Reveille, McLennan, Mikeska, and Milsing).10-K ↗ - Cipher Digital Expands Barber Lake Lease Term to 20 Years, Increasing Revenue to Over $9 Billion (8-K Ex. 99.1) (8-K · 2026 · filed 31 December 2026)8-K ↗
- Cipher Digital Form 10-Q (2026-08-04) (10-Q · filed 30 June 2026)10-Q ↗
- Unlock all Cipher Digital filings and extracted figures →
Full market dataset & site-level records
Unlock all 7 Cipher Digital data center sites in Texas
Inspect every Cipher Digital facility in Texas on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 14:06 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Cipher Digital have in Texas?
7 tracked as of 30 October 2026: 2 operating and 5 planned or under construction. That is 88% of Cipher Digital's 8 tracked sites in the United States.
How much power capacity does Cipher Digital have in Texas?
Reported power capacity in Texas: 507 MW operating, 900 MW not yet operating.
How does Cipher Digital rank among data center operators in Texas?
Cipher Digital ranks number 4 in Texas by sites tracked, with 7 of the 170 sites recorded in Texas (4%).
Where else does Cipher Digital operate in the United States?
Cipher Digital has 8 tracked sites across the United States: Texas (7), Ohio (1).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data