← United States data centers · All sites · Memphis
Sourced site record, every fact links to its page
Minihard:data center in Memphis, Tennessee.
Minihard is an under construction data center in Memphis, Tennessee, listed under SpaceXAI. Capacity is not recorded. 2024 to 2026 satellite: filling (+3 to +11 pts). Real Assets links 2 source pages, including SemiAnalysis, datacenterdynamics.com.
Open this site on the map View the full site recordunder construction data center · 2 linked sources
- SpaceXAI
- Memphis
- Tennessee
Approximate position and Tennessee peer sites (the exact position needs sign-in)
Facts on record
- OperatorSpaceXAI
- City and stateMemphis, Tennessee
- Statusunder construction
- Planned capacityNot recorded
- Expected completionNot recorded
- 2024 vs 2026 satelliteRoofed share filling, (+3 to +11 pts, 2024 to 2026), 30 January 2024 to 15 November 2026
- Sources linked2 from 2 publishers
- Record updated17 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 18 data centers in Tennessee that have a page.
SpaceXAI has 9 data centers on record in the United States: 3 operating and 6 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Elon Is Doing It Again: SpaceX Will Be The World’s Biggest AI Cloud
SemiAnalysis, newsletter.semianalysis.com, published 3 November 2026Web page - Elon Musk's SpaceXAI facing $6.1m fine in Mississippi for building data centers without securing correct permits - DCD
datacenterdynamics.com, published 15 October 2026Web page
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), Minihard shows active roof growth (filling) with a roofed-share shift of +3 to +11 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
More SpaceXAI data centers in Tennessee
- xAI Colossus Cluster 2 / Macrohard (Tulane Road)
Memphis, Tennessee, operating2.07 GW - xAI Colossus Cluster 1 (Lowry Road)
Memphis, Tennessee, operating1 GW
SpaceXAI data centers in other states
- SpaceXAI, Cochise County
Cochise County, Arizona, planned6 GW - xAI Macrohardrr
Southaven, Mississippi, under construction2 GW - Macroharder
Southaven, Mississippi, operatingNot recorded - SpaceX’s planned data center
Brownsville, Texas, plannedNot recorded - Starbase data center campus (444 acres)
Starbase, Texas, plannedNot recorded - xAI 51-acre parcel - Southaven
Southaven, Mississippi, plannedNot recorded
Other data centers in Tennessee
- Meta Gallatin Mega-Campus
Gallatin, Tennessee, operating400 MW - Centersquare Nashville
Gallatin, Tennessee, under construction100 MW - MEM01 data center at 4300 Getwell Road
Memphis, Tennessee, operating84 MW - SCDC Memphis - MEM01
Memphis, Tennessee, planned60 MW - Centersquare Gallatin (NAS)
Nashville, Tennessee, operatingNot recorded - DataBank Memphis-7620 Appling Center
Memphis, Tennessee, operatingNot recorded
Full site dossier & United States dataset
Open Minihard and 1,276 other data centers
This page is the public summary for Minihard in Memphis, Tennessee. Sign in to see its full record: 2 source pages.
- Minihard on the interactive map, with the sites around it
- All 2 linked source pages
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Minihard?
Minihard is recorded under SpaceXAI. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Minihard?
In Memphis, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Minihard have?
No capacity figure is recorded for this site. Real Assets does not estimate one.
Is Minihard under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), Minihard shows active roof growth (filling) with a roofed-share shift of +3 to +11 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 2 linked pages by SemiAnalysis, datacenterdynamics.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.