AnalystAIReal Assets Start the 3-day preview

← United States data centers · All sites · Memphis

Sourced site record, every fact links to its page

Minihard:data center in Memphis, Tennessee.

Minihard is an under construction data center in Memphis, Tennessee, listed under SpaceXAI. Capacity is not recorded. 2024 to 2026 satellite: filling (+3 to +11 pts). Real Assets links 2 source pages, including SemiAnalysis, datacenterdynamics.com.

Open this site on the map View the full site record
Memphis, TennesseeSpaceXAI
Under construction

under construction data center · 2 linked sources

  • SpaceXAI
  • Memphis
  • Tennessee
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Tennessee peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
Not recordedplanned capacity
Under constructionstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorSpaceXAI
  • City and stateMemphis, Tennessee
  • Statusunder construction
  • Planned capacityNot recorded
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteRoofed share filling, (+3 to +11 pts, 2024 to 2026), 30 January 2024 to 15 November 2026
  • Sources linked2 from 2 publishers
  • Record updated17 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 18 data centers in Tennessee that have a page.

SpaceXAI has 9 data centers on record in the United States: 3 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Minihard's record: 2 source pages - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), Minihard shows active roof growth (filling) with a roofed-share shift of +3 to +11 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites

More SpaceXAI data centers in Tennessee

SpaceXAI data centers in other states

Other data centers in Tennessee

Full site dossier & United States dataset

Open Minihard and 1,276 other data centers

This page is the public summary for Minihard in Memphis, Tennessee. Sign in to see its full record: 2 source pages.

  • Minihard on the interactive map, with the sites around it
  • All 2 linked source pages

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Minihard?

Minihard is recorded under SpaceXAI. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Minihard?

In Memphis, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Minihard have?

No capacity figure is recorded for this site. Real Assets does not estimate one.

Is Minihard under construction or growing on satellite imagery?

Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), Minihard shows active roof growth (filling) with a roofed-share shift of +3 to +11 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Where does this information come from?

From 2 linked pages by SemiAnalysis, datacenterdynamics.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.