AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Meta Gallatin Mega-Campus:data center in Gallatin, Tennessee.

Meta Gallatin Mega-Campus is an operating data center in Gallatin, Tennessee, listed under Meta. Capacity is 400 MW according to Epoch AI Frontier Data Centers. Real Assets links 6 source pages, including Meta Data Centers Official, Epoch AI Frontier Data Centers, Epoch AI Frontier Research.

Open this site on the map Start a 7-day trial
400 MWcapacity
Operatingstatus
6source pages linked
Not recordedexpected completion

Facts on record

  • OperatorMeta
  • City and stateGallatin, Tennessee
  • Statusoperating
  • Capacity400 MW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today87 MW
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked6 from 6 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 5 data centers in Tennessee that have a page.

Meta has 29 data centers on record in the United States: 23 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

6 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Meta data centers in other states

Other data centers in Tennessee

Full market dataset & site-level records

Open Meta Gallatin Mega-Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Meta Gallatin Mega-Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Meta Gallatin Mega-Campus?

Meta Gallatin Mega-Campus is recorded under Meta. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Meta Gallatin Mega-Campus?

In Gallatin, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Meta Gallatin Mega-Campus have?

400 MW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 87 MW.

Where does this information come from?

From 6 linked pages by Meta Data Centers Official, Epoch AI Frontier Data Centers, Epoch AI Frontier Research, Gallatingetsit Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.