AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

xAI Colossus Cluster 1 (Lowry Road):data center in Memphis, Tennessee.

xAI Colossus Cluster 1 (Lowry Road) is an operating data center in Memphis, Tennessee, listed under xAI. Capacity is 1 GW according to Epoch AI Frontier Data Centers. Real Assets links 50 source pages, including Archive Official Source, Cdn Official Source, DatacenterHawk Market Research.

Open this site on the map Start a 7-day trial
1 GWcapacity
Operatingstatus
50source pages linked
Not recordedexpected completion

Facts on record

  • OperatorxAI
  • City and stateMemphis, Tennessee
  • Statusoperating
  • Capacity1 GW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today340 MW
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked50 from 6 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 5 data centers in Tennessee that have a page.

xAI has 3 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

50 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

More xAI data centers in Tennessee

xAI data centers in other states

Other data centers in Tennessee

Full market dataset & site-level records

Open xAI Colossus Cluster 1 (Lowry Road) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see xAI Colossus Cluster 1 (Lowry Road) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates xAI Colossus Cluster 1 (Lowry Road)?

xAI Colossus Cluster 1 (Lowry Road) is recorded under xAI. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is xAI Colossus Cluster 1 (Lowry Road)?

In Memphis, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does xAI Colossus Cluster 1 (Lowry Road) have?

1 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 340 MW.

Where does this information come from?

From 50 linked pages by Archive Official Source, Cdn Official Source, DatacenterHawk Market Research, Epoch AI Frontier Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.