AnalystAIReal Assets
Start free trial← United States data centers · All sites
Sourced site record, every fact links to its page
xAI Colossus Cluster 2 / Macrohard (Tulane Road) is an operating data center in Memphis / Whitehaven, Tennessee, listed under xAI. Capacity is 2.07 GW according to Epoch AI Frontier Data Centers. Real Assets links 41 source pages, including Chips and Cheese Hardware Research, Epoch AI Frontier Data Centers, Epoch AI Frontier Research.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Real Assets records 5 data centers in Tennessee that have a page.
xAI has 3 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
41 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see xAI Colossus Cluster 2 / Macrohard (Tulane Road) on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
xAI Colossus Cluster 2 / Macrohard (Tulane Road) is recorded under xAI. The operator is the name its sources give, which can differ from the owner or the tenant.
In Memphis / Whitehaven, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
2.07 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 946 MW.
From 41 linked pages by Chips and Cheese Hardware Research, Epoch AI Frontier Data Centers, Epoch AI Frontier Research. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.