xAI Colossus Cluster 2 / Macrohard (Tulane Road):data center in Memphis, Tennessee.
xAI Colossus Cluster 2 / Macrohard (Tulane Road) is an operating data center in Memphis, Tennessee, listed under SpaceXAI. Capacity is 2.07 GW according to Epoch AI Frontier Data Centers. 2024 to 2026 satellite: filling (+4 to +12 pts). Real Assets links 33 source pages, including Chips and Cheese Hardware Research, Epoch AI Frontier Data Centers.
Open this site on the map View the full site recordoperating data center · 33 linked sources
- SpaceXAI
- Memphis
- Tennessee
Approximate position and Tennessee peer sites (the exact position needs sign-in)
Facts on record
- OperatorSpaceXAI
- City and stateMemphis, Tennessee
- Statusoperating
- Capacity2.07 GW, as stated by Epoch AI Frontier Data Centers
- Expected completion2027-02-25
- 2024 vs 2026 satelliteRoofed share filling, (+4 to +12 pts, 2024 to 2026), 30 January 2024 to 15 November 2026
- Sources linked33 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 26 figures
- Deals recorded on this site🔒 1 deal
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 18 data centers in Tennessee that have a page.
SpaceXAI has 9 data centers on record in the United States: 3 operating and 6 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- TOP500 at ISC’26: We have a New Number 1
Chips and Cheese Hardware Research, chipsandcheese.com, published 19 October 2026Web page - Epoch AI Frontier Data Centers Dossier: Colossus 2
Epoch AI Frontier Data Centers, docs.google.com, published 19 October 2026Web page - 31 additional source filings & extracted fact citations for xAI Colossus Cluster 2 / Macrohard (Tulane Road)
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
33 sources on record; 2 shown above and 31 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open xAI Colossus Cluster 2 / Macrohard (Tulane Road)'s record: 33 source pages, 26 sourced figures and 1 recorded deal - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), xAI Colossus Cluster 2 / Macrohard (Tulane Road) shows active roof growth (filling) with a roofed-share shift of +4 to +12 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
More SpaceXAI data centers in Tennessee
- xAI Colossus Cluster 1 (Lowry Road)
Memphis, Tennessee, operating1 GW - Minihard
Memphis, Tennessee, under constructionNot recorded
SpaceXAI data centers in other states
- SpaceXAI, Cochise County
Cochise County, Arizona, planned6 GW - xAI Macrohardrr
Southaven, Mississippi, under construction2 GW - Macroharder
Southaven, Mississippi, operatingNot recorded - SpaceX’s planned data center
Brownsville, Texas, plannedNot recorded - Starbase data center campus (444 acres)
Starbase, Texas, plannedNot recorded - xAI 51-acre parcel - Southaven
Southaven, Mississippi, plannedNot recorded
Other data centers in Tennessee
- Meta Gallatin Mega-Campus
Gallatin, Tennessee, operating400 MW - Centersquare Nashville
Gallatin, Tennessee, under construction100 MW - MEM01 data center at 4300 Getwell Road
Memphis, Tennessee, operating84 MW - SCDC Memphis - MEM01
Memphis, Tennessee, planned60 MW - Centersquare Gallatin (NAS)
Nashville, Tennessee, operatingNot recorded - DataBank Memphis-7620 Appling Center
Memphis, Tennessee, operatingNot recorded
Full site dossier & United States dataset
Open xAI Colossus Cluster 2 / Macrohard (Tulane Road) and 1,276 other data centers
This page is the public summary for xAI Colossus Cluster 2 / Macrohard (Tulane Road) in Memphis, Tennessee. Sign in to see its full record: 33 source pages, 26 sourced figures and 1 recorded deal.
- xAI Colossus Cluster 2 / Macrohard (Tulane Road) on the interactive map, with the sites around it
- All 33 linked source pages
- 26 sourced figures, each with its page and quote
- 1 recorded deal on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates xAI Colossus Cluster 2 / Macrohard (Tulane Road)?
xAI Colossus Cluster 2 / Macrohard (Tulane Road) is recorded under SpaceXAI. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is xAI Colossus Cluster 2 / Macrohard (Tulane Road)?
In Memphis, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does xAI Colossus Cluster 2 / Macrohard (Tulane Road) have?
2.07 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today is not recorded.
Is xAI Colossus Cluster 2 / Macrohard (Tulane Road) under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), xAI Colossus Cluster 2 / Macrohard (Tulane Road) shows active roof growth (filling) with a roofed-share shift of +4 to +12 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 33 linked pages by Chips and Cheese Hardware Research, Epoch AI Frontier Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.