AnalystAIReal Assets Start the 3-day preview

← United States data centers · All sites · Memphis

Sourced site record, every fact links to its page

xAI Colossus Cluster 2 / Macrohard (Tulane Road):data center in Memphis, Tennessee.

xAI Colossus Cluster 2 / Macrohard (Tulane Road) is an operating data center in Memphis, Tennessee, listed under SpaceXAI. Capacity is 2.07 GW according to Epoch AI Frontier Data Centers. 2024 to 2026 satellite: filling (+4 to +12 pts). Real Assets links 33 source pages, including Chips and Cheese Hardware Research, Epoch AI Frontier Data Centers.

Open this site on the map View the full site record
Memphis, TennesseeSpaceXAI
2.07 GW

operating data center · 33 linked sources

  • SpaceXAI
  • Memphis
  • Tennessee
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Tennessee peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
2.07 GWcapacity
Operatingstatus
33source pages linked
2027-02-25expected completion

Facts on record

  • OperatorSpaceXAI
  • City and stateMemphis, Tennessee
  • Statusoperating
  • Capacity2.07 GW, as stated by Epoch AI Frontier Data Centers
  • Expected completion2027-02-25
  • 2024 vs 2026 satelliteRoofed share filling, (+4 to +12 pts, 2024 to 2026), 30 January 2024 to 15 November 2026
  • Sources linked33 from 2 publishers
  • Record updated20 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map
  • Sourced figures, each with its page and quote🔒 26 figures
  • Deals recorded on this site🔒 1 deal

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 18 data centers in Tennessee that have a page.

SpaceXAI has 9 data centers on record in the United States: 3 operating and 6 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

33 sources on record; 2 shown above and 31 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open xAI Colossus Cluster 2 / Macrohard (Tulane Road)'s record: 33 source pages, 26 sourced figures and 1 recorded deal - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), xAI Colossus Cluster 2 / Macrohard (Tulane Road) shows active roof growth (filling) with a roofed-share shift of +4 to +12 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites

More SpaceXAI data centers in Tennessee

SpaceXAI data centers in other states

Other data centers in Tennessee

Full site dossier & United States dataset

Open xAI Colossus Cluster 2 / Macrohard (Tulane Road) and 1,276 other data centers

This page is the public summary for xAI Colossus Cluster 2 / Macrohard (Tulane Road) in Memphis, Tennessee. Sign in to see its full record: 33 source pages, 26 sourced figures and 1 recorded deal.

  • xAI Colossus Cluster 2 / Macrohard (Tulane Road) on the interactive map, with the sites around it
  • All 33 linked source pages
  • 26 sourced figures, each with its page and quote
  • 1 recorded deal on this site

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates xAI Colossus Cluster 2 / Macrohard (Tulane Road)?

xAI Colossus Cluster 2 / Macrohard (Tulane Road) is recorded under SpaceXAI. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is xAI Colossus Cluster 2 / Macrohard (Tulane Road)?

In Memphis, Tennessee. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does xAI Colossus Cluster 2 / Macrohard (Tulane Road) have?

2.07 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today is not recorded.

Is xAI Colossus Cluster 2 / Macrohard (Tulane Road) under construction or growing on satellite imagery?

Comparing clear 10 m satellite passes across 2024 to 2026 (30 January 2024 to 15 November 2026), xAI Colossus Cluster 2 / Macrohard (Tulane Road) shows active roof growth (filling) with a roofed-share shift of +4 to +12 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Where does this information come from?

From 33 linked pages by Chips and Cheese Hardware Research, Epoch AI Frontier Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.