← United States data centers · All operators · All states
Live market record, the source behind every published figure
Hut 8:6 data center sites in United States.
As of 30 October 2026, Real Assets tracks 6 data center sites listed under Hut 8 in the United States: 2 operating and 4 planned or under construction. Reported power capacity: 280 MW operating, 750 MW not yet operating. It ranks number 28 by sites among 173 named operators, with 1% of the 853 sites tracked. Largest states: Texas (3), Illinois (2), Louisiana (1).
Unlock all 6 Hut 8 sites2 operating · 4 planned or under construction · #28 operator
- Texas (3)
- Illinois (2)
- Louisiana (1)
Mapped Hut 8 footprint in United States (site-level details require sign-in)
Where Hut 8 is
- Texas3
- Illinois2
- Louisiana1
- Unlock all 6 Hut 8 site locations →
Largest operators in United States
Hut 8: 6 data centers with their own page
- Hut 8 Latham Data Center
Logan, Illinois500 MW - King Mountain JV
McCamey, Texas280 MW - Hut 8 River Bend Campus
West Feliciana Parish, Louisiana200 MW - Hut 8 Project 4
Kane, Illinois50 MW - Hut 8 Beacon Point Gigawatt AI Campus
Robstown, TexasNot recorded - Hut 8 Vega High-Density AI Facility
Vega, TexasNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Hut 8 by state
Regional breakdown pages where Hut 8 has at least 3 tracked data center sites.
Hut 8: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Hut 8, with disclosed capital expenditure, lease commitments and capacity figures.
- Hut 8 Corp. (NASDAQ: HUT) FY 2024 Form 10-K Annual Report (1,020 MW Energy Capacity & River Bend AI Campus) (10-K · FY 2024 · filed 5 March 2025)
Reports 1,020 MW of Energy Capacity Under Management across 15 sites in the United States and Canada (including Vega 205 MW in Texas, Salt Creek, King Mountain, and 5 colocation data centers) plus a 12,300 MW development pipeline anchored by the 300 MW River Bend AI data center campus in Louisiana.10-K ↗ - Unlock all Hut 8 filings and extracted figures →
Full market dataset & site-level records
Unlock all 6 Hut 8 data center sites in the United States
This page previews Hut 8's top footprint. Sign in or start a trial to inspect all 6 individual Hut 8 facilities, site-by-site capacity, status, and source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 13:25 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Hut 8 have in the United States?
6 tracked as of 30 October 2026: 2 operating and 4 planned or under construction. This is what we have recorded, not a full census.
Where are Hut 8's data center sites?
Largest states by sites: Texas (3), Illinois (2), Louisiana (1).
How much power capacity does Hut 8 have?
Reported power capacity: 280 MW operating, 750 MW not yet operating.
How does Hut 8 compare with other data center operators?
It ranks number 28 of the 65 largest named operators by sites tracked. The largest is Digital Realty with 84.
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data