← United States data centers · Hut 8 (6) · Texas (170)
Live market record, the source behind every published figure
Hut 8 in Texas:3 data center sites.
As of 30 October 2026, Real Assets tracks 3 data center sites listed under Hut 8 in Texas: 2 operating and 1 planned or under construction. Reported power capacity in Texas: 280 MW operating. Texas accounts for 50% of Hut 8's 6 tracked sites in the United States, and Hut 8 accounts for 2% of the 170 tracked sites in Texas.
Unlock all 3 Hut 8 sites in Texas2 operating · 1 planned · 2% of Texas
- 50% of Hut 8 in United States
- 280 MW operating
- #1 in Texas
Mapped Hut 8 sites in Texas (highlighted) against all Texas sites
Hut 8 across United States
- Texas3
- Illinois2
- Louisiana1
- View all 6 Hut 8 sites in United States →
Top operators in Texas
Hut 8 in Texas: 3 data centers with their own page
- King Mountain JV
McCamey, operating280 MW - Hut 8 Beacon Point Gigawatt AI Campus
Robstown, under constructionNot recorded - Hut 8 Vega High-Density AI Facility
Vega, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Hut 8: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Hut 8, with disclosed capital expenditure, lease commitments and capacity figures.
- Hut 8 Corp. (NASDAQ: HUT) FY 2024 Form 10-K Annual Report (1,020 MW Energy Capacity & River Bend AI Campus) (10-K · FY 2024 · filed 5 March 2025)
Reports 1,020 MW of Energy Capacity Under Management across 15 sites in the United States and Canada (including Vega 205 MW in Texas, Salt Creek, King Mountain, and 5 colocation data centers) plus a 12,300 MW development pipeline anchored by the 300 MW River Bend AI data center campus in Louisiana.10-K ↗ - Unlock all Hut 8 filings and extracted figures →
Full market dataset & site-level records
Unlock all 3 Hut 8 data center sites in Texas
Inspect every Hut 8 facility in Texas on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 14:06 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Hut 8 have in Texas?
3 tracked as of 30 October 2026: 2 operating and 1 planned or under construction. That is 50% of Hut 8's 6 tracked sites in the United States.
How much power capacity does Hut 8 have in Texas?
Reported power capacity in Texas: 280 MW operating.
How does Hut 8 rank among data center operators in Texas?
Hut 8 ranks number 1 in Texas by sites tracked, with 3 of the 170 sites recorded in Texas (2%).
Where else does Hut 8 operate in the United States?
Hut 8 has 6 tracked sites across the United States: Texas (3), Illinois (2), Louisiana (1).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data