AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Google Project Mica Campus:data center in Kansas City, Missouri.

Google Project Mica Campus is an operating data center in Kansas City, Missouri, listed under Google. Capacity is 700 MW according to Epoch AI Frontier Data Centers. Real Assets links 7 source pages, including Epoch AI Frontier Data Centers, Huntmidwest Official Source, Data Center Dynamics.

Open this site on the map Start a 7-day trial
700 MWcapacity
Operatingstatus
7source pages linked
Initial phase reported at approximately 18 months from 2026 startexpected completion

Facts on record

  • OperatorGoogle
  • City and stateKansas City, Missouri
  • Statusoperating
  • Capacity700 MW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today105 MW
  • Land area202.3 hectares (about 500 acres)
  • Building floor areaNot recorded
  • Expected completionInitial phase reported at approximately 18 months from 2026 start
  • Sources linked7 from 5 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 7 data centers in Missouri that have a page.

Google has 76 data centers on record in the United States: 45 operating and 31 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

7 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Google data centers in Missouri

Google data centers in other states

Other data centers in Missouri

Full market dataset & site-level records

Open Google Project Mica Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Google Project Mica Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Google Project Mica Campus?

Google Project Mica Campus is recorded under Google. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Google Project Mica Campus?

In Kansas City, Missouri. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Google Project Mica Campus have?

700 MW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 105 MW.

Where does this information come from?

From 7 linked pages by Epoch AI Frontier Data Centers, Huntmidwest Official Source, Data Center Dynamics, Google. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.