AnalystAIReal Assets
Start free trial← United States data centers · All sites
Sourced site record, every fact links to its page
Nebius AI Flagship Campus (Independence) is an under construction data center in Independence / Kansas City, Missouri, listed under Nebius. Capacity is not recorded. Real Assets links 4 source pages, including ARCO National Construction, Data Center Dynamics, City of Independence, MO.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Real Assets records 7 data centers in Missouri that have a page.
Nebius has 5 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
4 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Nebius AI Flagship Campus (Independence) on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Nebius AI Flagship Campus (Independence) is recorded under Nebius. The operator is the name its sources give, which can differ from the owner or the tenant.
In Independence / Kansas City, Missouri. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
No capacity figure is recorded for this site. Real Assets does not estimate one.
From 4 linked pages by ARCO National Construction, Data Center Dynamics, City of Independence, MO. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.