AnalystAIReal Assets Start free trial

← United States data centers · All sites · Ohio

Sourced site record, every fact links to its page

Prime Ohio Corporate Park:data center in Springfield, Ohio.

Prime Ohio Corporate Park is an under construction data center in Springfield, Ohio, listed under 5C Data Centers. Planned capacity is 75 MW according to Ideastream Public Media. Real Assets links 3 source pages, including Ideastream Public Media, WYSO, datacenterHawk.

Open this site on the map Start a 7-day trial
75 MWplanned capacity
Under constructionstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • Operator5C Data Centers
  • City and stateSpringfield, Ohio
  • Statusunder construction
  • Planned capacity75 MW, as stated by Ideastream Public Media
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. Prime Ohio Corporate Park is one of them.

5C Data Centers has 3 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

5C Data Centers data centers in other states

Other data centers in Ohio

Full market dataset & site-level records

Open Prime Ohio Corporate Park and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Prime Ohio Corporate Park on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Prime Ohio Corporate Park?

Prime Ohio Corporate Park is recorded under 5C Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Prime Ohio Corporate Park?

In Springfield, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Prime Ohio Corporate Park have?

75 MW, as stated by Ideastream Public Media. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Ideastream Public Media, WYSO, datacenterHawk. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.